Difference between revisions of "Umaria Coalfield Railway"
Jump to navigation
Jump to search
(Data added, links checked, Work-in-progress removed) |
(Fully checked; Further Info added with link) |
||
Line 5: | Line 5: | ||
The [[Bilaspur-Etawa Provincial State Railway]] was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888 | The [[Bilaspur-Etawa Provincial State Railway]] was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888 | ||
+ | ==Further Information== | ||
+ | See '''[[Bengal Nagpur Railway]]''' | ||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] | [[Category:State Railways]] |
Revision as of 10:03, 14 February 2016
The Umaria Coalfield Railwayopened in 1886-87 in order to connect Umaria Coalfield to the railway system.
The line was part of Katni-Umaria Provincial State Railway which was a section of the Bilaspur-Etawa Provincial State Railway.
The Bilaspur-Etawa Provincial State Railway was absorbed by the Bengal Nagpur Railway(BNR) on 1st January 1888