Sambhar Lake Salt Branch Line: Difference between revisions
Jump to navigation
Jump to search
Redirect created |
Revised information added with references |
||
Line 1: | Line 1: | ||
'''Sambhar Lake Salt Branch Line''' | |||
Metre gauge([[Rail_gauge#Metre_Gauge|MG]]) line | |||
with extensions; first section opened 1875 with extension to Japog, Jhowra and Kankaroola; finally 33 miles(53km) in 1891 <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n30/mode/1up “Administration Report on Railways 1918” Page 22 (pdf 30) ]; Retrieved 4 Nov 2016</ref> | |||
Operated as a branch of the [[Bombay, Baroda and Central India Railway]] [[Delhi-Ahmedabad BB&CIR Main Line]] <ref name=Admin/> | |||
==Further Information== | |||
See '''[[Bombay, Baroda & Central India Railway Network - Lines owned and worked]]''' | |||
== References == | |||
<references /> | |||
[[Category:State Railways]] | |||
[[Category:Railways]] | [[Category:Railways]] |
Revision as of 07:49, 6 November 2016
Sambhar Lake Salt Branch Line
Metre gauge(MG) line with extensions; first section opened 1875 with extension to Japog, Jhowra and Kankaroola; finally 33 miles(53km) in 1891 [1]
Operated as a branch of the Bombay, Baroda and Central India Railway Delhi-Ahmedabad BB&CIR Main Line [1]
Further Information
See Bombay, Baroda & Central India Railway Network - Lines owned and worked
References
- ↑ 1.0 1.1 “Administration Report on Railways 1918” Page 22 (pdf 30) ; Retrieved 4 Nov 2016