Barasat-Basirhat Light Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
‘Map’; Headings ,‘Rail System’, ‘History’ 4Further Info’ etc added
Line 12: Line 12:
|gauge4details=
|gauge4details=
|timeline1date= 1914
|timeline1date= 1914
|timeline1details= Line opened to traffic
|timeline1details= Line fully opened to traffic
|timeline2date=  
|timeline2date=  
|timeline2details=
|timeline2details=
Line 31: Line 31:
}}
}}


The '''Barasat-Basirhat Light Railway''' (BBLR) was a short 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway which ran from [[Barasat]], on the [[Eastern Bengal Railway]] (Central Section), east for 26 miles(42km) to [[Basirhat]]. The line opened in 1905 and extended to Chingrighata in 1909. The ‘Shambasar Branch’ opened in 1910 reaching Belgatchia in 1914, giving a total length of 52 miles(83km) <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n220/mode/2up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 212]; Retrieved 23 Aug 2017</ref>
[[File:Baraset-Basirhat Light Railway.png|thumb|Barasat-Basirhat Light Railway]]
The '''Barasat-Basirhat Light Railway''' (BBLR) was a short 2ft 6in/762mm narrow gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway which ran from [[Barasat]], a station on where there was an interchange with the [[Eastern Bengal Railway]] (Central Section), east for 26 miles(42km) to [[Basirhat]]. The line opened in 1905 and extended to Chingrighata in 1909. The ‘Shambasar Branch’ opened in 1910 reaching Belgatchia in 1914, giving a total length of 52 miles(83km) <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n220/mode/2up  " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 212]; Retrieved 23 Aug 2017</ref>


The Barasat-Basirhat Light Railway Company was one of several small narrow gauge concerns owned and worked by [[Martin's Light Railways]], a management company based in [[Calcutta]]. The principal Agreement dated 14 Dec 1897 between the District Board of the 24-Paragas and Messrs [[Martin & Company]] on behalf of the ‘Baraset-Basirhat Tramway Company Limited’, and gave concession for construction and operation of a tramway on a public road. It was in 1907 that a new company the ‘Barasat-Basirhat Light Railway Company Limited’ was formed <ref name=Admin/>
==Rail System==
* '''Barasat-Basirhat Main Line''', 26 miles(42km). Agreements 1897, 1902 and 1903, opened 1905.
* '''Basirhat-Taki-Hosanabad Extension (Chingrighata)''', 8.50 miles (14km). Agreement 1907, opened 1909
* '''Beliaghata Bridge to Patipkur (Pattipooker) Extension''', 16.62 miles(27km). Agreement 1908, opened 1910
* '''Patipukur (Pattipooker) to Belgachia Extension''', 1.12 miles(1.8km). Agreements 1914, opened 1914. This also known as the '''Shambasar (Shyambazar) Branch''' 
 
==History==
The ‘Barasat-Basirhat Light Railway Company’ was one of several small narrow gauge concerns owned and worked by [[Martin's Light Railways]], a management company based in [[Calcutta]]. The principal Agreement dated 14 Dec 1897 between the District Board of the 24-Paragas and Messrs [[Martin & Company]] on behalf of the ‘Baraset-Basirhat Tramway Company Limited’, and gave concession for construction and operation of a tramway on a public road. It was in 1907 that a new company the ‘Barasat-Basirhat Light Railway Company Limited’ was formed <ref name=Admin/>


A further Agreement dated 15 Aug 1914 <ref>British Library India Office Records L/F/8/17/1371 “Messrs. Martin and Co. on behalf of the Baraset-Basirhat Light Railway Company Limited, Application for construction of an extension to the Baraset-Basirhat Light Railway; 1914” </ref> gives  sanction to the construction of a extension of the existing Baraset-Basirhat Light Railway, from the existing station of that line at Pattipooker to the tramway terminus at Belgatchia. The following clauses are of note:-  
A further Agreement dated 15 Aug 1914 <ref>British Library India Office Records L/F/8/17/1371 “Messrs. Martin and Co. on behalf of the Baraset-Basirhat Light Railway Company Limited, Application for construction of an extension to the Baraset-Basirhat Light Railway; 1914” </ref> gives  sanction to the construction of a extension of the existing Baraset-Basirhat Light Railway, from the existing station of that line at Pattipooker to the tramway terminus at Belgatchia. The following clauses are of note:-  
*7.The tramway authorised by this order is a single line with passing places …….. running along the south side of the 5th and 6th miles of the Calcutta—Jessore Road to the tramway terminus at Belgatchia a distance of 5,450 feet (1.032 miles or 1.661 Km).
*7.The tramway authorised by this order is a single line with passing places . . running along the south side of the 5th and 6th miles of the Calcutta-Jessore Road to the tramway terminus at Belgatchia a distance of 5,450 feet (1.032 miles or 1.661 Km).
*8. The Tramway is to run on 9ft width but a road width of 20 feet must be maintained and at no time is there to be more than one line of rails on metalled roads.
*8. The Tramway is to run on 9ft width but a road width of 20 feet must be maintained and at no time is there to be more than one line of rails on metalled roads.
*11. The gauge of the tramway is to be 2ft 6 inches
*11. The gauge of the tramway is to be 2ft 6 inches
Line 42: Line 50:
*20. The speed shall not exceed 12 miles an hour on fenced sections and 10 miles an hour on unfenced. Locomotives must be fitted with Cowcatchers.
*20. The speed shall not exceed 12 miles an hour on fenced sections and 10 miles an hour on unfenced. Locomotives must be fitted with Cowcatchers.
*37. No train shall run between sunset and sunrise without consent of the Local Government approved in writing.
*37. No train shall run between sunset and sunrise without consent of the Local Government approved in writing.
The records show that at some point, date unknown the ownership of this railway changed to N I Roy and Sons Ltd <ref>'Light Railways in West Bengal' by Sidikuro,'The Economic Weekly' 30 May 1953, Table IV page 622</ref>


The line was taken over by [[Indian Railways]] in 1952 but closed in 1955. In 1962, part of the old track was converted to broad gauge and re-opened to traffic  <ref>[https://en.wikipedia.org/wiki/Martin%27s_Light_Railways#Barasat.E2.80.93Basirhat_Light_Railway Wikipedia “Baraset-Basirhat Light Railway” ]; Retrieved 23 Aug 2017</ref>
The line was taken over by [[Indian Railways]] in 1952 but closed in 1955. In 1962, part of the old track was converted to broad gauge and re-opened to traffic  <ref>[https://en.wikipedia.org/wiki/Martin%27s_Light_Railways#Barasat.E2.80.93Basirhat_Light_Railway Wikipedia “Baraset-Basirhat Light Railway” ]; Retrieved 23 Aug 2017</ref>
==Further Information==
See '''[[Martin's Light Railways]]'''


== References ==
== References ==

Revision as of 13:48, 10 April 2019

Barasat-Basirhat Light Railway
[[Image:|150px| ]]
Line of route
Barasat to Basirhat
Gauge / mileage
2' 6" NG 26 miles (1905)
52 miles (1943)
Timeline
1914 Line fully opened to traffic
1952 Nationalised
1955 Closed
1962 Part converted to broad gauge and re-opened to traffic
Key locations
Presidency Bengal
Stations Barasat, Kadamgacha, Diganga, Bishnupur, Basirhat
System agency
Worked by Martin's Light Railways
1952 Eastern Railway (IR zone)
How to interpret this infobox
Barasat-Basirhat Light Railway

The Barasat-Basirhat Light Railway (BBLR) was a short 2ft 6in/762mm narrow gauge(NG) railway which ran from Barasat, a station on where there was an interchange with the Eastern Bengal Railway (Central Section), east for 26 miles(42km) to Basirhat. The line opened in 1905 and extended to Chingrighata in 1909. The ‘Shambasar Branch’ opened in 1910 reaching Belgatchia in 1914, giving a total length of 52 miles(83km) [1]

Rail System

  • Barasat-Basirhat Main Line, 26 miles(42km). Agreements 1897, 1902 and 1903, opened 1905.
  • Basirhat-Taki-Hosanabad Extension (Chingrighata), 8.50 miles (14km). Agreement 1907, opened 1909
  • Beliaghata Bridge to Patipkur (Pattipooker) Extension, 16.62 miles(27km). Agreement 1908, opened 1910
  • Patipukur (Pattipooker) to Belgachia Extension, 1.12 miles(1.8km). Agreements 1914, opened 1914. This also known as the Shambasar (Shyambazar) Branch

History

The ‘Barasat-Basirhat Light Railway Company’ was one of several small narrow gauge concerns owned and worked by Martin's Light Railways, a management company based in Calcutta. The principal Agreement dated 14 Dec 1897 between the District Board of the 24-Paragas and Messrs Martin & Company on behalf of the ‘Baraset-Basirhat Tramway Company Limited’, and gave concession for construction and operation of a tramway on a public road. It was in 1907 that a new company the ‘Barasat-Basirhat Light Railway Company Limited’ was formed [1]

A further Agreement dated 15 Aug 1914 [2] gives sanction to the construction of a extension of the existing Baraset-Basirhat Light Railway, from the existing station of that line at Pattipooker to the tramway terminus at Belgatchia. The following clauses are of note:-

  • 7.The tramway authorised by this order is a single line with passing places . . . running along the south side of the 5th and 6th miles of the Calcutta-Jessore Road to the tramway terminus at Belgatchia a distance of 5,450 feet (1.032 miles or 1.661 Km).
  • 8. The Tramway is to run on 9ft width but a road width of 20 feet must be maintained and at no time is there to be more than one line of rails on metalled roads.
  • 11. The gauge of the tramway is to be 2ft 6 inches
  • 19. The vehicles used may be steam powered, and an outside cylinder type of locomotive used.
  • 20. The speed shall not exceed 12 miles an hour on fenced sections and 10 miles an hour on unfenced. Locomotives must be fitted with Cowcatchers.
  • 37. No train shall run between sunset and sunrise without consent of the Local Government approved in writing.

The records show that at some point, date unknown the ownership of this railway changed to N I Roy and Sons Ltd [3]

The line was taken over by Indian Railways in 1952 but closed in 1955. In 1962, part of the old track was converted to broad gauge and re-opened to traffic [4]

Further Information

See Martin's Light Railways

References

  1. 1.0 1.1 " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 212; Retrieved 23 Aug 2017
  2. British Library India Office Records L/F/8/17/1371 “Messrs. Martin and Co. on behalf of the Baraset-Basirhat Light Railway Company Limited, Application for construction of an extension to the Baraset-Basirhat Light Railway; 1914”
  3. 'Light Railways in West Bengal' by Sidikuro,'The Economic Weekly' 30 May 1953, Table IV page 622
  4. Wikipedia “Baraset-Basirhat Light Railway” ; Retrieved 23 Aug 2017