Bilaspur-Etawa Provincial State Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Data added, links checked
PEA-2292 (talk | contribs)
mNo edit summary
Line 14: Line 14:


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:Indian States Railways]]

Revision as of 11:47, 9 November 2015

Bilaspur-Etawa Provincial State Railway

The section of Katni to Umaria of 37 miles (59km) was built in 1886 and called Katni-Umaria Provincial State Railway which was absorbed by the Bengal Nagpur Railway(BNR) on 1st January 1888.

This section was incorporated in BNR’s Katni branch when the line from Bilaspur to Katni of about 200 miles (320km) was completed in 1891. The line in 1901 was connected with Murwara Junction of Great India Peninsula Railway(GIPR) about half a mile further up from Katni. With this extension the railway track from Bilaspur was connected to Etawa and as such this line came to be known also by name of Bilaspur-Etawa Provincial State Railway.

External Links

Indian Railway Line History https://indianrailwaynotes.files.wordpress.com/2010/07/south-eastern-railway.pdf

Wikipedia - Kutch Gurjar Kshatriyas contributions to the Indian railways http://en.wikipedia.org/wiki/Kutch_Gurjar_Kshatriyas_contributions_to_the_Indian_railways