Guntur-Repalle Railway: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
mNo edit summary |
||
Line 1: | Line 1: | ||
The '''Guntur-Repalle Railway'''was built and worked by the [[Madras and Southern Mahratta Railway]](M&SMR) and opened in 1914. The line ran from [[Guntur]] to [[Repalle]] | The '''Guntur-Repalle Railway''' was built and worked by the [[Madras and Southern Mahratta Railway]](M&SMR) and the first section opened in 1914. The line ran from [[Guntur]] to [[Repalle]] | ||
The [[Tenali-Repalle Railway]] section owned by Guntur District Board and opened in 1916. | The [[Tenali-Repalle Railway]] section owned by [[Guntur District Board]] and opened in 1916. | ||
Revision as of 11:17, 20 November 2015
The Guntur-Repalle Railway was built and worked by the Madras and Southern Mahratta Railway(M&SMR) and the first section opened in 1914. The line ran from Guntur to Repalle
The Tenali-Repalle Railway section owned by Guntur District Board and opened in 1916.