Hajiganj-Shatnal Railway Survey: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
No edit summary
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed
Line 1: Line 1:
'''Hajiganj-Shatnal Railway Survey'''
The '''Hajiganj-Shatnal Railway Survey''' was a branch line proposed in 1897 by Assam-Bengal Railway(ABR) to link [[Eastern Bengal Railway]](EBR)’s existing line from [[Goalundo]] to [[Narayangaj]] with a wagon ferry to [[Shatnal]] and a line to [[Hajiganj]].


Branch surveyed by ABR(qv), 1897; still pending 1906; apparently not constructed
The branch was surveyed in 1899 and a project proposed to include the ferry and a length of 24 miles(38km) of line.


{{Work-in-Progress-Rly}}
There is no corroborating information to show that this railway was constructed


==External Link==
*https://archive.org/stream/RailwayProjects/Railway%20projects#page/n0/mode/2up  Histories of (Indian)Railway Projects ...up to June 1906]
[[Category:Railway Surveys]]
[[Category:Railway Surveys]]
[[Category:Railways]]
[[Category:Railways]]

Revision as of 15:00, 20 November 2015

The Hajiganj-Shatnal Railway Survey was a branch line proposed in 1897 by Assam-Bengal Railway(ABR) to link Eastern Bengal Railway(EBR)’s existing line from Goalundo to Narayangaj with a wagon ferry to Shatnal and a line to Hajiganj.

The branch was surveyed in 1899 and a project proposed to include the ferry and a length of 24 miles(38km) of line.

There is no corroborating information to show that this railway was constructed

External Link