Bilaspur-Etawa Provincial State Railway: Difference between revisions
Jump to navigation
Jump to search
m Tidy External Links & remove circular linking |
m Internal links added |
||
Line 1: | Line 1: | ||
'''Bilaspur-Etawa Provincial State Railway''' | '''Bilaspur-Etawa Provincial State Railway''' | ||
The section of Katni to Umaria of 37 miles (59km) was built in 1886 and called [[Katni-Umaria Provincial State Railway]] which was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888. | The section of [[Katni]] to [[Umaria]] of 37 miles (59km) was built in 1886 and called [[Katni-Umaria Provincial State Railway]] which was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888. | ||
This section was incorporated in BNR’s Katni branch when the line from [[Bilaspur]] to [[Katni]] of about 200 miles (320km) was completed in 1891. The line in 1901 was connected with Murwara Junction of [[Great India Peninsula Railway]](GIPR) about half a mile further up from Katni. With this extension the railway track from Bilaspur was connected to [[Etawa]] and as such this line came to be known also by name of '''Bilaspur-Etawa Provincial State Railway'''. | This section was incorporated in BNR’s Katni branch when the line from [[Bilaspur]] to [[Katni]] of about 200 miles (320km) was completed in 1891. The line in 1901 was connected with Murwara Junction of [[Great India Peninsula Railway]](GIPR) about half a mile further up from Katni. With this extension the railway track from Bilaspur was connected to [[Etawa]] and as such this line came to be known also by name of '''Bilaspur-Etawa Provincial State Railway'''. | ||
==External Links== | ==External Links== | ||
[https://indianrailwaynotes.files.wordpress.com/2010/07/south-eastern-railway.pdf] South Eastern Railway Indian Railway Notes | |||
[http://en.wikipedia.org/wiki/Kutch_Gurjar_Kshatriyas_contributions_to_the_Indian_railways] Wikipedia | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Indian States Railways]] | [[Category:Indian States Railways]] |
Revision as of 14:01, 23 November 2015
Bilaspur-Etawa Provincial State Railway
The section of Katni to Umaria of 37 miles (59km) was built in 1886 and called Katni-Umaria Provincial State Railway which was absorbed by the Bengal Nagpur Railway(BNR) on 1st January 1888.
This section was incorporated in BNR’s Katni branch when the line from Bilaspur to Katni of about 200 miles (320km) was completed in 1891. The line in 1901 was connected with Murwara Junction of Great India Peninsula Railway(GIPR) about half a mile further up from Katni. With this extension the railway track from Bilaspur was connected to Etawa and as such this line came to be known also by name of Bilaspur-Etawa Provincial State Railway.
External Links
[1] South Eastern Railway Indian Railway Notes
[2] Wikipedia