Sirhind-Rupar Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
No edit summary
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed, References added
Line 1: Line 1:
'''Sirhind-Rupar Railway'''
The [[Sirhind-Rupar Railway]] was constructed by the [[North Western Railway]](NWR) as part of its network. The line opened in 1927-28.
<ref>[http://dspace.gipe.ac.in/xmlui/bitstream/handle/10973/36874/GIPE-069832-Contents.pdf?sequence=2&isAllowed=y] Punjab District Gazetteer – Vol 5 , Part B, Ambla District 1936, Preface iii; pdf page 5</ref>


Constructed by NWR(qv) and in operation before 1927
The opening of the line  made the [[Patiala State Monorail Trainways]] obsolete together with any plan to extend the line from Morinda to Rupar.
<ref>[http://www.irfca.org/articles/patiala-monorail-reappraisal.html] IRFCA - Patiala Monorail Reappraisal - A Reappraisal by Simon Darvill, 2012 – ‘Sirhind to Morinda Line’</ref>


{{Work-in-Progress-Rly}}
 
== References ==
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]

Revision as of 17:05, 5 December 2015

The Sirhind-Rupar Railway was constructed by the North Western Railway(NWR) as part of its network. The line opened in 1927-28. [1]

The opening of the line made the Patiala State Monorail Trainways obsolete together with any plan to extend the line from Morinda to Rupar. [2]


References

  1. [1] Punjab District Gazetteer – Vol 5 , Part B, Ambla District 1936, Preface iii; pdf page 5
  2. [2] IRFCA - Patiala Monorail Reappraisal - A Reappraisal by Simon Darvill, 2012 – ‘Sirhind to Morinda Line’