Umaria Coalfield Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed
Line 1: Line 1:
'''Umaria Coalfield Railway'''
The '''Umaria Coalfield Railway'''opened in 1886-87 in order to connect Umaria Coalfield to the railway system.


Connected to main line, 1891 as part of [[Katni-Umaria Provincial State Railway]], c1887; then BNR(qv)  
The line was part of [[Katni-Umaria Provincial State Railway]] which was a section of the [[Bilaspur-Etawa Provincial State Railway]].
 
The [[Bilaspur-Etawa Provincial State Railway]] was absorbed by the [[Bengal Nagpur Railway]](BNR) on 1st January 1888


{{Work-in-Progress-Rly}}


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]

Revision as of 16:39, 7 December 2015

The Umaria Coalfield Railwayopened in 1886-87 in order to connect Umaria Coalfield to the railway system.

The line was part of Katni-Umaria Provincial State Railway which was a section of the Bilaspur-Etawa Provincial State Railway.

The Bilaspur-Etawa Provincial State Railway was absorbed by the Bengal Nagpur Railway(BNR) on 1st January 1888