Mymensingh-Bhairab Bazar Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed, References added - multiple
PEA-2292 (talk | contribs)
References format corrected
Line 1: Line 1:
The '''Mymensingh–Bhairab Bazar''' Railway Company constructed this line between 1912 and 1918. The line was worked by the [[Assam Bengal Railway]]  (ABR).
The '''Mymensingh–Bhairab Bazar''' Railway Company constructed this line between 1912 and 1918. The line was worked by the [[Assam Bengal Railway]]  (ABR).
<ref name=name>[http://en.wikipedia.org/wiki/Tongi%E2%80%93Bhairab%E2%80%93Akhaura_line] Wikipedia /Mymensingh line</ref>
<ref name=name>[http://en.wikipedia.org/wiki/Tongi%E2%80%93Bhairab%E2%80%93Akhaura_line Wikipedia "Tongi–Bhairab–Akhaura line". Para. Bhairab Bazar–Kishoreganj–Gouripur–Mymensingh line]; Retrieved 13 Dec 2015</ref>


The line joins [[Mymensingh]]–Gouripur–Kishoreganj-[[Bhairab Bazar]] and covers the northern bank of the of the Brahmaputra River.
The line joins [[Mymensingh]]–Gouripur–Kishoreganj-[[Bhairab Bazar]] and covers the northern bank of the of the Brahmaputra River.

Revision as of 05:07, 13 December 2015

The Mymensingh–Bhairab Bazar Railway Company constructed this line between 1912 and 1918. The line was worked by the Assam Bengal Railway (ABR). [1]

The line joins Mymensingh–Gouripur–Kishoreganj-Bhairab Bazar and covers the northern bank of the of the Brahmaputra River.

The Company was acquired by the government in 1948–49 and the Assam Bengal Railway Company was in charge of the management of the line. There are two lines branching out of this line – a short Shyamganj-Jaria Janjail Line and a long Gouripur-Netrokona-Mohanganj Line. [1]

References