Cawnpore-Burhwal Railway: Difference between revisions
Jump to navigation
Jump to search
1918 Admin Report details checked/added/corrected |
Wikipedia Reference moved to External Links to confirm to specified format |
||
Line 35: | Line 35: | ||
The '''Cawnpore-Burhwal Railway''' was a state line worked by the [[Oudh and Rohilkhand Railway]] (O&RR); it was simply an existing branch of the O&RR to which a third rail was added, creating a short, mixed-gauge link between the BB&CIR and B&NWR networks. | The '''Cawnpore-Burhwal Railway''' was a state line worked by the [[Oudh and Rohilkhand Railway]] (O&RR); it was simply an existing branch of the O&RR to which a third rail was added, creating a short, mixed-gauge link between the BB&CIR and B&NWR networks. | ||
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf "Indian Railway Line History" page 11 by Keith Scholey]; Retrieved 10 Dec 2015</ref> | <ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf "Indian Railway Line History" page 11 by Keith Scholey]; Retrieved 10 Dec 2015</ref> | ||
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 135]; Retrieved 17 Dec 2015</ref> | <ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 135]; Retrieved 17 Dec 2015</ref> | ||
This Metre Gauge Link was owned by the Government of India and managed as part of the O&RR ( which became East Indian Railway from 1st July 1925). The line was later incorporated into the [[Cawnpore-Barabanki Railway]] . | This Metre Gauge Link was owned by the Government of India and managed as part of the O&RR ( which became East Indian Railway from 1st July 1925). The line was later incorporated into the [[Cawnpore-Barabanki Railway]] . | ||
==External Links== | |||
*[https://en.wikipedia.org/wiki/Cawnpore-Barabanki_Railway "Cawnpore-Barabanki Railway"] Wikipedia | |||
== References == | == References == |
Revision as of 06:34, 10 January 2016
Cawnpore-Burhwal Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Cawnpore to Burwhal | ||
Gauge / mileage | ||
Metre gauge | 80 miles (1905) | |
Timeline | ||
1896 | Line opened | |
Key locations | ||
Presidency | Bengal | |
Stations | Bara Banki, Lucknow, Malhaur, Unao | |
System agency | ||
Oudh and Rohilkhand Railway | ||
How to interpret this infobox |
To the south and north of the River Ganges lay the extensive metre-gauge systems of the Bombay, Baroda and Central India Railway(BB&CIR) and the Bengal and North-Western Railway(B&NWR).
The Cawnpore-Burhwal Railway was a state line worked by the Oudh and Rohilkhand Railway (O&RR); it was simply an existing branch of the O&RR to which a third rail was added, creating a short, mixed-gauge link between the BB&CIR and B&NWR networks. [1] [2]
This Metre Gauge Link was owned by the Government of India and managed as part of the O&RR ( which became East Indian Railway from 1st July 1925). The line was later incorporated into the Cawnpore-Barabanki Railway .
External Links
- "Cawnpore-Barabanki Railway" Wikipedia