Gondia-Chanda Railway: Difference between revisions
Jump to navigation
Jump to search
1918 Admin Report details checked/added/corrected |
Fully checked; 1918 Admin Report link changed |
||
Line 2: | Line 2: | ||
Work started in 1905 but due to shortage of funds was not completed until 1913. | Work started in 1905 but due to shortage of funds was not completed until 1913. | ||
<ref>[https:// | <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n14/mode/2up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 6]; Retrieved 4 Feb 2016</ref> | ||
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/south-eastern-railway.pdf "Indian Railway South Eastern - Notes and Source" by Keith Scholey]; Retrieved 11 Dec 2015</ref> | |||
<ref>[http://www.secr.indianrailways.gov.in/uploads/files/1312278598168-Tourist%20Places.pdf Indian Railways "Nagpur Division Railway History"]; Retrieved 11 Dec 2015</ref> | <ref>[http://www.secr.indianrailways.gov.in/uploads/files/1312278598168-Tourist%20Places.pdf Indian Railways "Nagpur Division Railway History"]; Retrieved 11 Dec 2015</ref> | ||
Revision as of 13:33, 4 February 2016
The Gondia-Chanda Railway was a 2ft 6in/762mm narrow gauge(NG) line, owned by Government of India(GoI) and worked by Bengal Nagpur Railway(BNR).
Work started in 1905 but due to shortage of funds was not completed until 1913. [1] [2] [3]
The Gondia-Chanda Railway merged with the Jubbulpore-Gondia Railway and the Nagpur-Chhindwara Railway to form the Satpura Railway around 1920.
References
- ↑ " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 6; Retrieved 4 Feb 2016
- ↑ "Indian Railway South Eastern - Notes and Source" by Keith Scholey; Retrieved 11 Dec 2015
- ↑ Indian Railways "Nagpur Division Railway History"; Retrieved 11 Dec 2015