Difference between revisions of "Benares-Cuttack Railway Survey"

From FIBIwiki
Jump to navigation Jump to search
(‘Personnel’ added, Reference added and text change)
m (Categories added (previously omitted in error), 'Persons' corrected (pevious error))
 
Line 12: Line 12:
 
==Personnel engaged on the project==
 
==Personnel engaged on the project==
 
*[[Francis Joseph Edward Spring, Sir|Francis Joseph Spring]]; 1883?-1884 <ref> [http://164.138.226.88/Francis_Joseph_Edward_Spring  “Grace’s Guide Sir Francis Joseph Edward Spring (1849-1933)”]; Retrieved on 16 Apr 2016</ref>.  
 
*[[Francis Joseph Edward Spring, Sir|Francis Joseph Spring]]; 1883?-1884 <ref> [http://164.138.226.88/Francis_Joseph_Edward_Spring  “Grace’s Guide Sir Francis Joseph Edward Spring (1849-1933)”]; Retrieved on 16 Apr 2016</ref>.  
*[[Frederick Lewis Dibblee]]; Oct 1885 – Nov 1886 <ref>[http://gwydir.demon.co.uk/jo/genealogy/dibblee/fred1obit.htm#ice “The Institution of Civil Engineers Obituary”]; Retrieved on 16 Apr 2016</ref>.
 
 
*[[Thomas Ellis Owen]]; Jul 1886 – Dec 1886; ‘Engineer-in-charge’<ref>[http://www.gracesguide.co.uk/Thomas_Ellis_Owen  “Grace’s Guide”]; Retrieved on 16 Apr 2016</ref>.  
 
*[[Thomas Ellis Owen]]; Jul 1886 – Dec 1886; ‘Engineer-in-charge’<ref>[http://www.gracesguide.co.uk/Thomas_Ellis_Owen  “Grace’s Guide”]; Retrieved on 16 Apr 2016</ref>.  
 +
 +
[[Category:Railways]]
 +
[[Category:State Railways]]
 +
[[Category: Railway Surveys]]
  
 
== References ==
 
== References ==
 
<references />
 
<references />

Latest revision as of 09:24, 18 April 2016

Benares-Cuttack Railway Survey

In the early 1880’s the Government of India(GoI) instigated the survey of the Benares-Cuttack Railway Survey with an extension to Puri, as a pilgrim line from Cuttack in the Orissa region to Benares (Varanasi) [1] At this time the Bengal Nagpur Railway(BNR) network was well developed and two alternative routes were surveyed and estimated. There were high expectations from BNR shareholders of attractive dividends from the pilgrim traffic as well as serving as a famine protection line for the Orissa region[1].

This project was repeatedly postponed and finally abandoned. The GoI had other priorities and BNR were more concerned in linking their network to Calcutta[1].

The section from Cuttack to Puri was constructed by the East Coast State Railway during the period 1893-96. [2].

Personnel engaged on the project

References