User:PEA-2292/My sandbox: Difference between revisions
Jump to navigation
Jump to search
Work in progress draft |
Work in progress draft |
||
Line 15: | Line 15: | ||
*'''EIR Agents''' <ref> “Symphony of Progress - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, 2003; page 114</ref> <ref name=Huddle>[ https://ia801404.us.archive.org/16/items/historyeastindi00huddgoog/historyeastindi00huddgoog.pdf Archive.org "History of the East Indian Railway ..." by George Huddlestone Appendix A, pages 278-279]</ref> | *'''EIR Agents''' <ref> “Symphony of Progress - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, 2003; page 114</ref> <ref name=Huddle>[ https://ia801404.us.archive.org/16/items/historyeastindi00huddgoog/historyeastindi00huddgoog.pdf Archive.org "History of the East Indian Railway ..." by George Huddlestone Appendix A, pages 278-279]</ref> | ||
**[[Rowland Macdonald Stephenson]] Sir; Agent 1853-57. - See [http://wiki.fibis.org/index.php/East_Indian_Railway#History "East Indian Railway - History" page] | **[[Rowland Macdonald Stephenson]] Sir; Agent 1853-57. - See [http://wiki.fibis.org/index.php/East_Indian_Railway#History "East Indian Railway - History" page] | ||
**[[Edward Palmer]]; | **[[Edward Palmer]]; 1857-73. | ||
**[[Cecil Stephenson]]; | **[[Cecil Stephenson]]; 1873-75. | ||
**[[Bradford Leslie]], Sir; | **[[Bradford Leslie]], Sir; 1876-87, previously Chief Engineer 1876-82. | ||
**[[D W Campbell]]; Agent 1887-91. | **[[D W Campbell]]; Agent 1887-91. | ||
**[[Richard Gardiner]] Lt.Col R.E.; | **[[Richard Gardiner]] Lt.Col R.E.; 1891-99. | ||
**[[James Douglas]]; | **[[James Douglas]]; 1899-1907. | ||
**[[William A Dring]] Sir; | **[[William A Dring]] Sir; 1907-12. | ||
**Robert S Highet, Sir; | **Robert S Highet, Sir; 1912-18. | ||
**J A Marshall; | **J A Marshall; 1918-19 | ||
**Geo Colvin, Sir; | **Geo Colvin, Sir; 1921-33 | ||
**Hugh Hannay, Sir; | **Hugh Hannay, Sir; 1933-34 | ||
**J A Bell; | **J A Bell; 1935-39 | ||
*'''Secretary to Agent''' | *'''Secretary to Agent''' | ||
Line 39: | Line 39: | ||
*'''EIR Chief Engineere'''<ref name=Huddle/> | *'''EIR Chief Engineere'''<ref name=Huddle/> | ||
**[[George Turnbull]]; | **[[George Turnbull]]; 1851-63. | ||
**[[Samuel Power]]; | **[[Samuel Power]]; 1863-1869. Previously General Assistant to the EIR Chief Engineer [[George Turnbull]] on construction of [[Soan Bridge]] and whole line; [http://www.icevirtuallibrary.com/doi/abs/10.1680/imotp.1872.22906 Institution of Civil Engineers Proceedings Volume 33 Issue 1872, 1872, pp. 240-241 ]; Retrieved 5 Jun 2016</ref>. | ||
**G Sibley; | **G Sibley; 1862-76. From 1862-68 he was Chief Engineer, Upper Provinces, Allahbad | ||
**[[Bradford Leslie]], Sir; | **[[Bradford Leslie]], Sir; 1876-82, later Agent. | ||
**C H Denham; 1882-89 | **C H Denham; 1882-89 | ||
**F E Robertson; 1889-97 | **F E Robertson; 1889-97 | ||
Line 49: | Line 49: | ||
**R S Highet; 1903-- | **R S Highet; 1903-- | ||
*'''EIR Chief Auditors''' | |||
**Rob Roberts; 1863-77 | |||
**E C S Mackenzie; 1877-92 | |||
**J Douglas; 1893-1899 | |||
**T Bashford; 1899-- | |||
*'''EIR General Traffic Managers''' | |||
**F Cox; 1858-59 | |||
**J C Batchelor; 1860-79. From 1860-66 Traffic Manager Howrah | |||
**B P W Smyth; Before 1866 Traffic Manager Allahbad. | |||
**W A Dring; 1897-- | |||
*'''EIR Locomotive Superintendents''' | *'''EIR Locomotive Superintendents''' | ||
**[[J Hodgson]]; 1855-57. EIR Locomotive Superintendent <ref>"Symphony of Progress: The Saga of Eastern Railway 1854-2003" published by the Eastern Railway, Kolkata 2003, page 7 and 11</ref>. | **[[J Hodgson]]; 1855-57. EIR Locomotive Superintendent <ref>"Symphony of Progress: The Saga of Eastern Railway 1854-2003" published by the Eastern Railway, Kolkata 2003, page 7 and 11</ref>. | ||
*'''EIR Carriage and Wagon Superintendents''' | *'''EIR Carriage and Wagon Superintendents''' |
Revision as of 07:25, 6 June 2016
East Indian Railway Personnel - a sub-section of East Indian Railway(EIR) page.
India Office Records
The following employment records held at the IOR are relevant :-
- L/AG/46/11/133-137 "Contracts of appointment, c1858-1925" (possibly not all included)
The above is indexed in
- Z/L/AG/46 "Index to UK Appointments to Indian Railways (1849-1925)"
- FIBIS database List of Indian Railways UK Contracted Staff taken from IOR Series L/AG/46/12.
The following is not included in the index Z/L/AG/46.
- L/AG/46/11/138-141 : "Half-yearly staff lists, 1861-1890 & 1911-1922" (giving ages from 1886).
EIR Personnel - Chronological Order
The following are notable, with period of service with EIR -
- EIR Agents [1] [2]
- Rowland Macdonald Stephenson Sir; Agent 1853-57. - See "East Indian Railway - History" page
- Edward Palmer; 1857-73.
- Cecil Stephenson; 1873-75.
- Bradford Leslie, Sir; 1876-87, previously Chief Engineer 1876-82.
- D W Campbell; Agent 1887-91.
- Richard Gardiner Lt.Col R.E.; 1891-99.
- James Douglas; 1899-1907.
- William A Dring Sir; 1907-12.
- Robert S Highet, Sir; 1912-18.
- J A Marshall; 1918-19
- Geo Colvin, Sir; 1921-33
- Hugh Hannay, Sir; 1933-34
- J A Bell; 1935-39
- Secretary to Agent
- Cecil Stephenson; 1858-65
- T.Lovelock; 1866-72
- W H Russell; 1872-78
- P.Wagstaff; 1878-1900
- H.Wood; 1900--
- EIR Consulting Engineers
- Alexander Meadows Rendel; 1855-87. Consulting Engineer to the EIR - Naini Bridge; Lansdowne Bridge; Jubilee Bridge [3]
- EIR Chief Engineere[2]
- George Turnbull; 1851-63.
- Samuel Power; 1863-1869. Previously General Assistant to the EIR Chief Engineer George Turnbull on construction of Soan Bridge and whole line; Institution of Civil Engineers Proceedings Volume 33 Issue 1872, 1872, pp. 240-241 ; Retrieved 5 Jun 2016</ref>.
- G Sibley; 1862-76. From 1862-68 he was Chief Engineer, Upper Provinces, Allahbad
- Bradford Leslie, Sir; 1876-82, later Agent.
- C H Denham; 1882-89
- F E Robertson; 1889-97
- E H Stone; 1897-1903
- C F Findlay; 1903
- R S Highet; 1903--
- EIR Chief Auditors
- Rob Roberts; 1863-77
- E C S Mackenzie; 1877-92
- J Douglas; 1893-1899
- T Bashford; 1899--
- EIR General Traffic Managers
- F Cox; 1858-59
- J C Batchelor; 1860-79. From 1860-66 Traffic Manager Howrah
- B P W Smyth; Before 1866 Traffic Manager Allahbad.
- W A Dring; 1897--
- EIR Carriage and Wagon Superintendents
- Robert Webb Pearce; 1855-1900. Carriage and Wagon Superintendent EIR Carriage and Wagon Workshop [5]
- EIR Engineering Department
- William St. John Galwey; 1857-72. Construction of EIR Jamalpur Locomotive Workshops ; Survey of the EIR ‘First Chord line’; District Engineer. In 1872 transferred to State Railways[6].
- Frederick Smith Stanton Major General R.E. 1887-92. Board of the East Indian Railway Company, based in London, this following his retirement as Director General of Indian Railways,after 27 years service with the State Railways.[7].
References
- ↑ “Symphony of Progress - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, 2003; page 114
- ↑ 2.0 2.1 [ https://ia801404.us.archive.org/16/items/historyeastindi00huddgoog/historyeastindi00huddgoog.pdf Archive.org "History of the East Indian Railway ..." by George Huddlestone Appendix A, pages 278-279]
- ↑ Wikipedia "Alexander Meadows Rendel"; Retrieved 5 Jun 2016
- ↑ "Symphony of Progress: The Saga of Eastern Railway 1854-2003" published by the Eastern Railway, Kolkata 2003, page 7 and 11
- ↑ Institution of Mechanical Engineers "Obituary Robert Webb Pearce May 1890", page 292
- ↑ "Graces Guide - William St. John Galwey”; Retrieved on 5 Jun 2016
- ↑ "Grace's Guide - Frederick Smith Stanton”; Retrieved on 5 Jun 2016