User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Blanked the page
PEA-2292 (talk | contribs)
Work in progress draft
Line 1: Line 1:
==SPR Network of Lines including Lines Managed and Worked ==
The listings below are generally based on the “Administration Report on Railways 1918”  <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n121/mode/1up “Administration Report on Railways 1918” pages 120-126 (pdf 129-134]; Retrieved  4 Nov 2016</ref> with page numbers (and pdf pages) noted at the end of each entry.


'''SPR Mainline and branches''' [[Rail_gauge#Broad_Gauge|BG]] Total line length 426 miles(685km). Page 121(pdf 130)
*’Delhi-Samasata Mainline’, [[Delhi]] via [[Narwana]], [[Jakhal]], [[Bhatinda]), [[Fazilika]], [[Mc.Leodganj]], [[Bahawalpur]] to [[Samasata]], opened 1897, 399 miles(642km)
**’Delhi Brewery Branch Line’, opened 1909, 0.8 mile(1.3km)
**’[[Narwana-Kaithal Railway|Narwana-Kaithal Branch Line]]’, opened 1899, from [[Narwana]] to [[Kaithal]], 23 miles(37km)
**’Jind City Branch Line’, from [[Jind]] Junction to [[Jind City]], opened 1916, 2.5 miles(4km)
'''[[Jullundur-Doab Railway| Jullundur-Doab Extension Railway]]''' [[Rail_gauge#Broad_Gauge|BG]]  Total line length 130 miles(209km). Page 123(pdf132)
*’Jullunder-Ferozepore Mainline, [[Jullunder]] via [[Karpurthala]], [Sultanpur Lodi]], [[Lohian Khas]], [[Gidarpindi]], [[Makhu]] to [[Ferozepore]] Cantonment, opened 1912-14, 73 miles(117km)
**’Phillaur Branch Line’, [[Lohian Khas]] to [[Phillaur]], opened 1913, 39 miles(63km)
**’[[Jullunder-Nakodar Chord Railway]] known as the ‘Nakodar Branch Line’, [[Jullunder]] to [[Nakodar]], opened 1914, 19 miles(30km)
'''[[Ludhiana Extension Railway]]''' [[Rail_gauge#Broad_Gauge|BG]]  Total line length 152 miles(244km). Page 123(pdf132)
*’Ludhiana-Ferozepore Line’, [[Ludhiana]] to [[Ferozepore]], opened 1905, 77 miles(124km)
*’Ferozepore-MacLeod Ganj Line’, [[Ferozepore]] to [[MacLeod Ganj]], opened  1906, 75 miles(120km)
'''[[Sutlej Valley Railway| Sutlej Valley Extension Railway]]''' [[Rail_gauge#Broad_Gauge|BG]]  Total line length 208 miles(335km). Pages 124-5(pdf135-6)
*[[Kasur-Lodhran Railway]], [[Kasur]] to [[Lodhran]], opened 1910, closed and dismantled 1917-18, 208 miles(335km)
'''[[Ludhiana-Dhuri-Jakhal Railway]]''' [[Rail_gauge#Broad_Gauge|BG]]  Total line length 79 miles(127km). Page 115(pdf124)
*[[Ludhiana]] via [[Dhuri]] to [[Jakhal]], opened 1901. Managed, maintained and worked by [[North Western Railway]] (NWR) under an Agreement with the [[Princely states|Princely ]][[Maler Kotla State]] Durbar and the [[Jhind State]] Durbars. The line was used by SPR linking the ’Delhi-Samasata Mainline’ at [[Jakhal]] with '[[Ludhiana Extension Railway]]' at [[Ludhiana]].

Revision as of 06:32, 18 December 2016

SPR Network of Lines including Lines Managed and Worked

The listings below are generally based on the “Administration Report on Railways 1918” [1] with page numbers (and pdf pages) noted at the end of each entry.

SPR Mainline and branches BG Total line length 426 miles(685km). Page 121(pdf 130)

Jullundur-Doab Extension Railway BG Total line length 130 miles(209km). Page 123(pdf132)

Ludhiana Extension Railway BG Total line length 152 miles(244km). Page 123(pdf132)

Sutlej Valley Extension Railway BG Total line length 208 miles(335km). Pages 124-5(pdf135-6)

Ludhiana-Dhuri-Jakhal Railway BG Total line length 79 miles(127km). Page 115(pdf124)