Umaria Coalfield Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Fully checked; Further Info added with link
PEA-2292 (talk | contribs)
Line 10: Line 10:
[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]
[[Category:Industrial Railways]]

Revision as of 09:33, 19 February 2017

The Umaria Coalfield Railwayopened in 1886-87 in order to connect Umaria Coalfield to the railway system.

The line was part of Katni-Umaria Provincial State Railway which was a section of the Bilaspur-Etawa Provincial State Railway.

The Bilaspur-Etawa Provincial State Railway was absorbed by the Bengal Nagpur Railway(BNR) on 1st January 1888

Further Information

See Bengal Nagpur Railway