Mourbhanj Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Fully checked; 1918 Admin Report link changed
PEA-2292 (talk | contribs)
'Further Information' added with internal links
 
Line 4: Line 4:


In 1920 the railway was  renamed [[Mayurbhanj Railway]], 1920 and ownership transferred to  a private company; worked by BNR
In 1920 the railway was  renamed [[Mayurbhanj Railway]], 1920 and ownership transferred to  a private company; worked by BNR
==Further Information==
See ''' [[Bengal-Nagpur Railway]] (BNR) '''
<br>and '''[[Bengal-Nagpur_Railway_-_Lines_Owned_and_Worked#NG_Lines_worked_by_BNR|Bengal-Nagpur Railway – NG Lines Worked]]
<br>and '''[[Mayurbhanj Railway]]''' from 1920


== References ==
== References ==

Latest revision as of 08:54, 14 June 2020

The Mourbhanj Railway opened in 1905. The 2ft 6in/762mm narrow gauge(NG) line was owned by the Princely Mourbhanj State and worked by Bengal-Nagpur Railway (BNR). The line linked Rupea to Baripada, a length of 32 miles (51km). [1]

In 1920 the railway was renamed Mayurbhanj Railway, 1920 and ownership transferred to a private company; worked by BNR

Further Information

See Bengal-Nagpur Railway (BNR)
and Bengal-Nagpur Railway – NG Lines Worked
and Mayurbhanj Railway from 1920

References