Delhi-Umballa-Kalka Railway
The Delhi-Umballa-Kalka Railway(DKR) Company was formed in 1889. The line ran north from Delhi via Umballa+(Ambala) to Kalka in the Himalayan foothills where it joined the Kalka-Simla Railway.
The line was worked by the East Indian Railway(EIR) and taken over by the Government of India(GoI) in 1925.
The DKR Company signed a contact in 1898 with GoI for the construction and working of a 2ft/610mm narrow gauge(NG) line from Kalka to Simla. The line was opened to traffic in 1903 and as a result of high capital cost and high maintenance cost the Delhi-Umballa-Kalka Railway Company was by 1904 in severe financial crisis. The Kalka-Simla Railway was purchased by GoI in January 1906. The line was later converted to 2ft 6in/762mm narrow gauge. [1] [2] [3] [4] The DKR Company signed a contact in 1909 with the GoI for the construction and working of the Thanesar-Kaithal Railway line. This branch was operating in 1912 making Kaithal an important trading centre. This line was worked by the EIR and taken over by the GoI in 1925.
+Note:
Umballa is used in this text as it was the name of the Railway Company.
Amballa and Ambala are also recorded in differet documents as various spellings .
None of these three place names appear in The Imperial Gazeteer of India 1908 which is taken to be the definitive source
References
- ↑ National Archives "Records of the Delhi-Umballa-Kalka Railway Company" IOR/L/AG/46/9; Retrieved 10 Dec 2015
- ↑ Wikipedia Delhi-Kalka Line"; Retrieved 10 Dec 2015
- ↑ National Archives "Branch line from Thanesar to Kaithal". IOR/L/F/8/17/1234; Retrieved 10 Dec 2015
- ↑ Google Books "Haryana: Past and Present" by Suresh K Sharma c.1912; Retrieved 10 Dec 2015