Gondia-Chanda Extension Railway
Gondia-Chanda Extension Railway
- ‘Gondia-Chanda Mainline’, opened from Gondia to Nagbhir, 1908; to Rajoli, 1910; to Babupeth, 1913; reaching Chanda Fort in 1916. The Nagbhir-Chanda work was started in 1906 but due to the shortage of funds was not completed until 1st April 1913 .[1] as far as Babupeth with the last 2 miles to Chandra Fort opening in 1916. Length 149 miles(239 km)[2]
Further Information
See Satpura Railway
References
- ↑ 1.0 1.1 Indian Railways “History of Nagpur Division” ; Retrieved 11 Dec 2016
- ↑ “Administration Report on Railways 1918” page 6 (pdf15); Retrieved 11 Dec 2016