Difference between revisions of "Bezwada-Madras Railway"

From FIBIwiki
Jump to navigation Jump to search
('People' link created)
(Links to 'Railway Persons')
Line 1: Line 1:
 
'''Bezwada-Madras Railway'''
 
'''Bezwada-Madras Railway'''
  
The [[Bezwada]]-[[Madras]] Railway was surveyed in November 1893 by Consulting Engineer  [[Spring, Francis Joseph Edward|F J E Spring]].
+
The [[Bezwada]]-[[Madras]] Railway was surveyed in November 1893 by Consulting Engineer  [[Francis Joseph Edward Spring, Sir|F J E Spring]].
The 1898 detailed scale drawings of bridges, stations, offices, railway station machinery, temporary buildings, road crossings designs of were made by E J Moore [Engineer-in-Chief of the Bezwada-Madras Railway] and J C Lyle being his Assistant.
+
The 1898 detailed scale drawings of bridges, stations, offices, railway station machinery, temporary buildings, road crossings designs of were made by [[E J Moore]] Engineer-in-Chief of the Bezwada-Madras Railway and [[J C Lyle]] being his Assistant.
<ref>[https://books.google.fr/books?id=3VQTAAAAYAAJ&pg=PA546&lpg=PA546&dq=Bangalore+Harihar+Railway&source=bl&ots=eoKE12owR5&sig=MbPq4iwigkvPzjvei8V9yFNdhRw&hl=fr&sa=X&ved=0CEoQ6AEwBTgoahUKEwigyYWWz_nIAhXKPRQKHSkaDyY#v=onepage&q=Bangalore%20Harihar%20Railway&f=false Google Books - "India and Indian Office List, 1905 - Record of Services" page 546];Retrieved 9 Dec 2015</ref>
+
<ref>[https://books.google.fr/books?id=3VQTAAAAYAAJ&pg=PA546&lpg=PA546&dq=Bangalore+Harihar+Railway&source=bl&ots=eoKE12owR5&sig=MbPq4iwigkvPzjvei8V9yFNdhRw&hl=fr&sa=X&ved=0CEoQ6AEwBTgoahUKEwigyYWWz_nIAhXKPRQKHSkaDyY#v=onepage&q=Bangalore%20Harihar%20Railway&f=false Google Books - "India and Indian Office List, 1905 - Record of Services" page 546];Retrieved 16 Apr 2016</ref>
  
 
The railway was opened in 1899 as part of the [[Madras and Southern Mahratta Railway]](M&SMR)
 
The railway was opened in 1899 as part of the [[Madras and Southern Mahratta Railway]](M&SMR)

Revision as of 16:23, 16 April 2016

Bezwada-Madras Railway

The Bezwada-Madras Railway was surveyed in November 1893 by Consulting Engineer F J E Spring. The 1898 detailed scale drawings of bridges, stations, offices, railway station machinery, temporary buildings, road crossings designs of were made by E J Moore Engineer-in-Chief of the Bezwada-Madras Railway and J C Lyle being his Assistant. [1]

The railway was opened in 1899 as part of the Madras and Southern Mahratta Railway(M&SMR)

Further Information

See Madras and Southern Mahratta Railway

References