GIPR Nagpur Branch

From FIBIwiki
Revision as of 09:47, 3 April 2020 by PEA-2292 (talk | contribs) (New page)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The GIPR Nagpur Branch from Bhusawal was built by Messrs. Lee, Watson and Ayton, Construction Contractors. The line opened in stages 1863-67 - Bhusaval to Baderna 1863-65, to Nagpur 1867: 243.25 miles

One of the GIPR Engineers in charge of the construction was Robert Edwin Wright from 1864-67