Bellary-Kistna State Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Renamed page - adding State
 
PEA-2292 (talk | contribs)
'Personnel' added with 'References'
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''Bellary-Kistna State Railway'''  
'''Bellary-Kistna State Railway'''  


Constructed before 1890; surveyed for Hindpur extension 1892-94; worked by SMR(qv)
The first 90 miles were opened in 1887 and extended to [[Bezwada]] (present day Vijayawada) in 1888. Worked by [[Southern Mahratta Railway]](SMR).


The Hindupur extension was under survey in 1892-94.


{{Work-in-Progress-Rly}}
SMR became [[ Madras and Southern Mahratta Railway]](M&SMR) in 1908
 
==Personnel==
*[[Bernard William Cantopher]], Executive Engineer, from [[Public Works Department]](PWD), posted to the [[:Category:State Railways|State Railways]] was employed on the Bellary-Kistna State Railway in 1890 but on furlough (leave)<ref name=name> India  Civil List 1890, page 41 </ref>. He had previously been employed on the[[Southern Mahratta Railway]] Company (SMR), on loan in 1888-89 <ref> [https://play.google.com/books/reader?id=b2NPAAAAMAAJ&printsec=frontcover&output=reader&hl=en_GB&pg=GBS.PA456 Google Books " India List and India Office List, 1905" page 456 (pdf page 419)] Retrieved on 16 May 2016</ref> and SMR were working the Bellary-Kistna State Railway.
*[[Boswell Parkinson Milsom]], Executive Engineer also from [[:Category:State Railways|State Railways]], was in 1890 covering the above position of Executive Engineer <ref name=name/>.
 
Other Personnel from PWD are given in the 1890 Civil List <ref> India  Civil List 1890, pages 40-42 </ref> and employed on the Bellary-Kistna State Railway -
*H C B? La Touche, Superintending Engineer
*R W L Toozs , Executive Engineer
*J C Lyle, Assistant Engineer
*D P Siva, Assistant Engineer - Survey
*G F Thompson, Assistant Engineer - Survey
*J W A McNaire, Storekeeper
 
== References ==
<references />
 
==Further Information==
See '''[[Southern Mahratta Railway]]''', up to 1908, then '''[[ Madras and Southern Mahratta Railway]]'''


[[Category:Railways]]
[[Category:Railways]]
[[Category:Indian States Railways]]
[[Category:State Railways]]

Latest revision as of 06:07, 27 May 2016

Bellary-Kistna State Railway

The first 90 miles were opened in 1887 and extended to Bezwada (present day Vijayawada) in 1888. Worked by Southern Mahratta Railway(SMR).

The Hindupur extension was under survey in 1892-94.

SMR became Madras and Southern Mahratta Railway(M&SMR) in 1908

Personnel

Other Personnel from PWD are given in the 1890 Civil List [3] and employed on the Bellary-Kistna State Railway -

  • H C B? La Touche, Superintending Engineer
  • R W L Toozs , Executive Engineer
  • J C Lyle, Assistant Engineer
  • D P Siva, Assistant Engineer - Survey
  • G F Thompson, Assistant Engineer - Survey
  • J W A McNaire, Storekeeper

References

  1. 1.0 1.1 India Civil List 1890, page 41
  2. Google Books " India List and India Office List, 1905" page 456 (pdf page 419) Retrieved on 16 May 2016
  3. India Civil List 1890, pages 40-42

Further Information

See Southern Mahratta Railway, up to 1908, then Madras and Southern Mahratta Railway