Jorhat (Provincial) State Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Branch Line added and Gauge and GoI links added
PEA-2292 (talk | contribs)
Edited and 1937 Admin info, Statistics and Classification added
 
(5 intermediate revisions by the same user not shown)
Line 31: Line 31:
}}
}}


The '''Jorhat State (Provincial) Railway'''(JPSR) was a 2' 0" Narrow Gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway which connected [[Gosaigon]] on the River Brahmaputra with [[Jorhat]] and two junctions on the [[Assam-Bengal Railway]] (later the [[Bengal and Assam Railway]]).
[[File: Jorhat (Provincial) State Railway Map 1909.png|thumb| Jorhat (Provincial) State Railway Map 1909]]
The '''Jorhat State (Provincial) Railway'''(JPSR) was a 2' 0" Narrow Gauge([[Rail_gauge#Narrow_Gauge|NG]]) railway which connected [[Gosaigaon]] on the River Brahmaputra with [[Jorhat]] and two junctions on the [[Assam-Bengal Railway]] (later the [[Bengal and Assam Railway]]).


The railway was surveyed as the [[Assam Kokilamukh Railway]] and originally named the [[Kokilamukh State Railway]] when it opened to traffic on 9 December 1884. In 1885, the railway was renamed the '''Jorhat State Railway''' but, in 1915, the name was changed again to the '''Jorhat Provincial Railway'''(JPSR). The Government of India([[Government of India |GoI]]) nationalised the railway in 1937.
The railway was surveyed as the [[Assam Kokilamukh Railway]]and originally variously named the ‘Kokila Mookh Tramway’, ‘Kokila Mookh State Railway" and then the ‘[[Kokilamukh State Railway]]’ .
<br>The construction out of the Provicial revenue of Assam was for the convenience of the numerous tea gardensin the neighbourhood of [[Jorhat]] and approved by the [[Government of India]] in 1882
<br>The first section from Gosaigaon to Jorhat opened in Sept 1883 and reached Dhali River in Dec 1884, a total of 16½ miles(26km)<ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n257/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 248 pdf  256]; Retrieved 2 Aug 2020</ref>
 
In 1885, the railway was renamed the '''Jorhat State Railway''' and the following lines opened<ref name=Admin1918/>:-
* 1886 ‘Mariani Branch’, 7 miles(11km) opened from Chenimara Junction to Mariani
* 1887 ‘Titabar Extension’ to the Mainline , 1¾ miles(3km)  opened from Dhali River to Titabar
* 1901 ‘Borghop Extension’ to the Mainline, 4¾ miles(8km)  opened from Borghop to [[Gosaigaon]]
* 1911 ‘Cold Weather Line’, 2½ miles(4km)  opened from Borghop to a point further down the river
This giving a total line length of 32½ miles(52km)
 
In 1915, the name was changed again to the '''Jorhat Provincial Railway'''(JPSR).  
 
The line together with the rolling stock is owned, and up to 30 Sep 1927 worked by the State <ref name=Hist1937/>.
 
From 1 Oct 1927 the maintenance, management and working made over to [[Macneil & Co|Messrs Macneil and Co]], Agents  for  ‘[[Rivers Steam Navigation Ltd]]’ and [[Kilburn & Co|Messrs Kilburn & Co]], Managing Agents for ,  ‘[[Indian General Navigation and Railway Company]]’<ref name=Hist1937>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page  289 pdf 332]; Retrieved 2 Aug 2020</ref>.
 
The ‘Statistics of Working’ show the year-by-year financial results from 1913-14 through to 1936-37 <ref name=Hist1937/>
 
The Government of India([[Government of India |GoI]]) nationalised the railway in 1937.


On 1 October 1943, the [[Government of India |GoI]] amalgamated the JPSR with the [[Bengal and Assam Railway]].
On 1 October 1943, the [[Government of India |GoI]] amalgamated the JPSR with the [[Bengal and Assam Railway]].


==Branch Line of JPSR==
== Classification ==
*[[Mariani Branch Railway]], opened 1885-86.
[[Indian Railway Classification]] of 1926 - Class III railway system.
 
== External links ==


== References ==
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]
[[Category:Narrow Gauge (NG) Railways]]

Latest revision as of 09:00, 4 August 2020

Jorhat (Provincial) State Railway

1942 map
Line of route
Titabar to Gosaigaon
Gauge / mileage
2' 0" NG 30 miles (1905)
Timeline
1884 First section opened to traffic.
1885 Renamed Jorhat State Railway
1915 Renamed Jorhat Provincial Railway
1937 Nationalised
1943 Merged into Bengal and Assam Railway
Key locations
Presidency Bengal
Stations Gosaigaon, Jorhat, Mariani, Titabar
System agency
State Railway Agency
How to interpret this infobox
Jorhat (Provincial) State Railway Map 1909

The Jorhat State (Provincial) Railway(JPSR) was a 2' 0" Narrow Gauge(NG) railway which connected Gosaigaon on the River Brahmaputra with Jorhat and two junctions on the Assam-Bengal Railway (later the Bengal and Assam Railway).

The railway was surveyed as the ‘Assam Kokilamukh Railway’ and originally variously named the ‘Kokila Mookh Tramway’, ‘Kokila Mookh State Railway" and then the ‘Kokilamukh State Railway’ .
The construction out of the Provicial revenue of Assam was for the convenience of the numerous tea gardensin the neighbourhood of Jorhat and approved by the Government of India in 1882
The first section from Gosaigaon to Jorhat opened in Sept 1883 and reached Dhali River in Dec 1884, a total of 16½ miles(26km)[1]

In 1885, the railway was renamed the Jorhat State Railway and the following lines opened[1]:-

  • 1886 ‘Mariani Branch’, 7 miles(11km) opened from Chenimara Junction to Mariani
  • 1887 ‘Titabar Extension’ to the Mainline , 1¾ miles(3km) opened from Dhali River to Titabar
  • 1901 ‘Borghop Extension’ to the Mainline, 4¾ miles(8km) opened from Borghop to Gosaigaon
  • 1911 ‘Cold Weather Line’, 2½ miles(4km) opened from Borghop to a point further down the river

This giving a total line length of 32½ miles(52km)

In 1915, the name was changed again to the Jorhat Provincial Railway(JPSR).

The line together with the rolling stock is owned, and up to 30 Sep 1927 worked by the State [2].

From 1 Oct 1927 the maintenance, management and working made over to Messrs Macneil and Co, Agents for ‘Rivers Steam Navigation Ltd’ and Messrs Kilburn & Co, Managing Agents for , ‘Indian General Navigation and Railway Company[2].

The ‘Statistics of Working’ show the year-by-year financial results from 1913-14 through to 1936-37 [2]

The Government of India(GoI) nationalised the railway in 1937.

On 1 October 1943, the GoI amalgamated the JPSR with the Bengal and Assam Railway.

Classification

Indian Railway Classification of 1926 - Class III railway system.

References