Grand Chord EIR Line: Difference between revisions
New page all checked |
Route and dates clarified an 'Upper Sone Bridge' |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
'''Grand Chord EIR Line''' | '''Grand Chord EIR Line ''', known in some references as the '''Moghalsarai-Gaya Line''' | ||
The line ran from [[Dhanbad]] to [[Moghal Sarai|Moghal Sarai(Mogalsarai)]] via Gomoh, Koderma and [[Gaya]]. The [[East Indian Railway]] (EIR) broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line of 281 miles(450 km) and inaugerated on 6 Dec 1906 <ref name=symph> “Symphony of Progress - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, 2003; pages 18-19</ref>. | |||
The first section from [[Sitarampur]] to Barakar opened 1865; Barakar to Dhanbaid 1894; [[Gaya]] to [[Moghal Sarai]] opened 1900, which included the '[[Upper Sone Bridge, Dehri]]'. The middle section from Dhanbaid via Paharpur to Manpur opened 1906. Total 278 miles(447km)<ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n64/mode/1up “Administration Report on Railways 1918” page 54 (pdf63)]; Retrieved 1 Dec 2020</ref>. | |||
==Background== | |||
The ‘[[First Chord EIR Line]]’ that had been completed in 1871 connecting [[Raniganj]] with [[Luckeesarai]] was not providing sufficient capacity. | |||
By the mid 1880's the traffic on the [[East Indian Railway]] mainline had continued to grow and it became necessary to find another shorter route <ref name=symph/> | |||
The route of what would become the ‘’Grand Chord Line had first been surveyed in 1850, with the idea of constructing the original main line by that route, it being the more direct way to the North-West ; but the Government of the day preferred, and no doubt wisely preferred, the somewhat more circuitous Loop Line route, which tapped the great cities and trade centres along the banks of the River Ganges <ref >[https://ia801404.us.archive.org/16/items/historyeastindi00huddgoog/historyeastindi00huddgoog.pdf Archive.org "History of the East Indian Railway ..." by George Huddlestone, page 141-144, pdf page 196-199]; Retrieved 12 Jun 2016</ref>. | |||
==History== | |||
*A fresh survey was undertaken in 1888-89 to find a direct route and after two more surveys to cut costs, a route was determined from [[Dhanbad]] to [[Moghulsarai]] via [[Gomoh]], [[Koderma]] and [[Gaya]]. | |||
*The Government finally authorised the project in 1895 and construction commenced.. The major works on the line were the [[Upper Sone Bridge, Dehri]], tunneling and ghat line construction <ref >[http://www.gracesguide.co.uk/East_Indian_Railway:_Grand_Chord Grace's Guide " The Grand Cord"]; Retrieved 12 Jun 2016</ref>. | |||
*[[Alexander Meadows Rendel]] was the EIR Consulting Engineer <ref >[http://www.gracesguide.co.uk/Alexander_Meadows_Rendel Grace's Guide "Alexander Meadows Rendel"]; Retrieved 12 Jun 2016</ref> and was responsible for the construction of the [[Upper Sone Bridge, Dehri|Upper Sone Bridge]] which was completed in 1900 <ref> | |||
[http://www.gracesguide.co.uk/Upper_Soane_Bridge Grace's Guide "Upper Soane Bridge"]; Retrieved 12 Jun 2016</ref>. | |||
*[[Frederick Palmer]] was the EIR District Engineer on surveys and construction. He was responsible for the construction of the line, which was commenced in 1896 and completed in 1900, and included the [[Upper Sone Bridge, Dehri|Upper Sone Bridge]] of ninety-six 100-ft. spans-the longest bridge in India <ref>[http://www.gracesguide.co.uk/Frederick_Palmer Graces Guide "Frederick Palmer"]; Retrieved 12 Jun 2016</ref>. | |||
*The 'Grand Chord' was opened by Viceroy Lord Minto on 6th December 1906. It was 281 miles(450km) in length and reduced the distance from [[Calcutta]] to North India and [[Bombay]] by 50 miles (80km). | |||
== Further Information== | == Further Information== | ||
See '''[[East Indian Railway]]''' page | See '''[[East Indian Railway]]''' page | ||
<br>and '''[[East Indian Railway - Lines owned and worked]]''' page | |||
and '''[[East Indian Railway | |||
== References == | == References == | ||
<references /> | <references /> | ||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:State Railways]] | [[Category:State Railways]] |
Latest revision as of 12:27, 1 December 2020
Grand Chord EIR Line , known in some references as the Moghalsarai-Gaya Line
The line ran from Dhanbad to Moghal Sarai(Mogalsarai) via Gomoh, Koderma and Gaya. The East Indian Railway (EIR) broad gauge(BG) line of 281 miles(450 km) and inaugerated on 6 Dec 1906 [1].
The first section from Sitarampur to Barakar opened 1865; Barakar to Dhanbaid 1894; Gaya to Moghal Sarai opened 1900, which included the 'Upper Sone Bridge, Dehri'. The middle section from Dhanbaid via Paharpur to Manpur opened 1906. Total 278 miles(447km)[2].
Background
The ‘First Chord EIR Line’ that had been completed in 1871 connecting Raniganj with Luckeesarai was not providing sufficient capacity.
By the mid 1880's the traffic on the East Indian Railway mainline had continued to grow and it became necessary to find another shorter route [1]
The route of what would become the ‘’Grand Chord Line had first been surveyed in 1850, with the idea of constructing the original main line by that route, it being the more direct way to the North-West ; but the Government of the day preferred, and no doubt wisely preferred, the somewhat more circuitous Loop Line route, which tapped the great cities and trade centres along the banks of the River Ganges [3].
History
- A fresh survey was undertaken in 1888-89 to find a direct route and after two more surveys to cut costs, a route was determined from Dhanbad to Moghulsarai via Gomoh, Koderma and Gaya.
- The Government finally authorised the project in 1895 and construction commenced.. The major works on the line were the Upper Sone Bridge, Dehri, tunneling and ghat line construction [4].
- Alexander Meadows Rendel was the EIR Consulting Engineer [5] and was responsible for the construction of the Upper Sone Bridge which was completed in 1900 [6].
- Frederick Palmer was the EIR District Engineer on surveys and construction. He was responsible for the construction of the line, which was commenced in 1896 and completed in 1900, and included the Upper Sone Bridge of ninety-six 100-ft. spans-the longest bridge in India [7].
- The 'Grand Chord' was opened by Viceroy Lord Minto on 6th December 1906. It was 281 miles(450km) in length and reduced the distance from Calcutta to North India and Bombay by 50 miles (80km).
Further Information
See East Indian Railway page
and East Indian Railway - Lines owned and worked page
References
- ↑ 1.0 1.1 “Symphony of Progress - The Saga of the Eastern Railway 1854-2003”; published by Eastern Railway, 2003; pages 18-19
- ↑ “Administration Report on Railways 1918” page 54 (pdf63); Retrieved 1 Dec 2020
- ↑ Archive.org "History of the East Indian Railway ..." by George Huddlestone, page 141-144, pdf page 196-199; Retrieved 12 Jun 2016
- ↑ Grace's Guide " The Grand Cord"; Retrieved 12 Jun 2016
- ↑ Grace's Guide "Alexander Meadows Rendel"; Retrieved 12 Jun 2016
- ↑ Grace's Guide "Upper Soane Bridge"; Retrieved 12 Jun 2016
- ↑ Graces Guide "Frederick Palmer"; Retrieved 12 Jun 2016