Difference between revisions of "Shoranur-Cochin Railway"

From FIBIwiki
Jump to navigation Jump to search
(Data added, links checked, Work-in-progress removed, References added)
(Revised with extra information, map etc)
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
The '''Shoranur-Cochin Railway''' was constructed in 1902. The metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line linked [[Shoranur]] to the Ernakulam Terminus in [[Cochin]](Kochi), a distance of 62 miles (  km) .
+
The '''Shoranur-Cochin Railway''' was first named the '''Cochin State Railway''' <ref>[https://books.google.fr/books?id=vERnljM1uiEC&pg=PA454&lpg=PA454#v=onepage&q&f=false “Gazetteer of South India”, Volume 1, c.1907 by W. Francis, page 454]; Retrieved 1 May 2018</ref>
<ref>[http://www.irfca.org/faq/faq-history3.html] IRFCA History of Indian Railways, part 3, 1902</ref>
 
  
The railway and the Cochin Bridge were funded by the Shri Rama Varma Thampuran, the farsighted Maharaja of Cochin, who reigned from the year 1895 till 1914. The bridge was the first to ford the river that obstructed passage between Malabar and the southern states of Cohin/Travancore. The first freight train passed over the bridge on 2nd June 1902 and a few days later on the 16th the line opened to passenger traffic.  
+
[[File:Shoranur-Cochin Railway.png|thumb|Shoranur-Cochin Railway]]
<ref>[http://maddy06.blogspot.fr/2009/11/kings-railway.html] King's Railway</ref> 
+
The line was opened in 1902. The metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) line linked [[Shoranur]]  to the [[Ernakulam|Ernakulam Terminus]] in [[Cochin]]''(modern name Kochi)'', a distance of 62 miles (100km). The line was owned by the [[Princely states|Princely ]][[Cochin State]]. Worked by [[Madras Railway]] up to 31 Dec 1907. Thereafter the working was undertaken by [[South Indian Railway]](SIR) <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n153/mode/1up  "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 145]; Retrieved 1 May 2018</ref>
<ref>[https://en.wikipedia.org/wiki/Ernakulam_Terminus_railway_station] Wikipedia - Ernaklam Terminus</ref>
 
<ref>[http://www.cochinbridge.com/Cochin%20Bridge.html] Cochin Bridge</ref>
 
  
The line was  owned by the State but worked by [[South Indian Railway]](SIR).  
+
The railway and the Cochin Bridge were funded by the Maharaja (Diwan) of Cochin, of the [[Princely states|Princely ]][[Cochin State]] who reigned from the year 1895 till 1914. The bridge was the first to ford the river that obstructed passage between Malabar and the southern states of Cohin/Travancore. The first freight train passed over the bridge on 2nd June 1902 and a few days later on the 16th the line opened to passenger traffic <ref>[http://maddy06.blogspot.fr/2009/11/kings-railway.html Blog "King's Railway"] Dated November 28, 2009] Retrieved 9 Dec 2015</ref><ref>[https://en.wikipedia.org/wiki/Ernakulam_Terminus_railway_station Wikipedia "Ernaklam Terminus"] Retrieved 9 Dec 2015</ref><ref>[http://www.cochinbridge.com/Cochin%20Bridge.html "Cochin Bridge Information"] Retrieved 9 Dec 2015</ref>
  
It was only in 1938 that the [[Cochin Harbour Extension Railway]] was opened as an extension to the Shoranur-Cochin Railway.
+
The following is recorded as being the statement of Mr J W Bhore, the Diwan of Cochin
<ref>[http://www.irfca.org/faq/faq-history3.html] IRFCA History of Indian Railways, part 3, 1938</ref>
+
<br>“The line had been planned as part of the [[South Indian Railway]](SIR) line from Madras to the West Coast in collaboration with the [[Railway Branch - PWD|Railway Department]] of the [[Government of India]]. The Cochin State authorities had been informed that the line would be built by a certain date and it would be gauge([[Rail_gauge_#Metre_Gauge|MG]]). The Cochin State built its line accordingly but had to wait for its connection, and when the SIR line did come to Shoranur it was to broad gauge, so all goods going either way had to be uploaded out of one set of trucks and loaded to another”.
<ref>[https://en.wikipedia.org/wiki/Cochin_Harbour_Terminus_railway_station] Wikipedia Cochin Harbour Extension</ref>
+
<ref name=Slater> [https://books.google.fr/books?id=MCRHDwAAQBAJ&pg=PT205#v=onepage&q&f=false Google Books “Revival: Southern India : Its Political and Economic Problems” by Gilbert Slater pdf pages 203-206]; Retrieved 1 May 2018</ref>
  
== References ==
+
From 1907 at [[Chalakudy]], an intermediate station on the 'Shoranur-Cochin Railway', the timber from the Parambikulam Forest Area operation was transferred from the [[Cochin State Forest Tramway|'Cochin State Forest Tramway' - ''see separate page for information'']].
<references />
+
 
 +
==Later History==  
 +
The metre gauge ([[Rail_gauge_#Metre_Gauge|MG]]) line was converted to broad gauge ([[Rail_gauge#Broad_Gauge|BG]]) in 1938 <ref>[http://www.thehindu.com/news/national/kerala/railways-propose-third-line-for-ernakulam-shoranur/article21823977.ece ‘The Hindu’ Newspaper Dec 2017]; Retrieved 1 May 2018</ref>
 +
 
 +
It was only in 1938 that the ‘[[Cochin Harbour Extension Railway]]’  was opened as an extension to the ‘Shoranur-Cochin Railway’. This was constructed as a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line <ref>[https://en.wikipedia.org/wiki/Cochin_Harbour_Terminus_railway_station Wikipedia "Cochin Harbour Extension"] Retrieved 9 Dec 2015</ref>
 +
 
 +
==Records==
 +
An on-line search of the IOR records relating to this railway <ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2  “British Library Archives and Manuscripts Catalogue”  - Search];  Retrieved 27 Jan 2016</ref>
 +
gives the following: -
 +
*'''L/F/8/17/1236'''  “ South Indian Railway Company Limited, Agreement for the working and maintenance of the Shoranur-Cochin State Railway His Highness Raja Sir Sri Rama Vurmah; 1908"
  
 +
==Further Information==
 +
See  '''[[Madras Railway]]''' who worked the line up to up to 31 Dec 1907.
 +
<br>and '''[[South Indian Railway]]''' who worked the line from 1st Jan 1908.
  
 
[[Category:Railways]]
 
[[Category:Railways]]
 
[[Category:Indian States Railways]]
 
[[Category:Indian States Railways]]
 +
 +
== References ==
 +
<references />

Latest revision as of 15:11, 2 May 2018

The Shoranur-Cochin Railway was first named the Cochin State Railway [1]

Shoranur-Cochin Railway

The line was opened in 1902. The metre gauge(MG) line linked Shoranur to the Ernakulam Terminus in Cochin(modern name Kochi), a distance of 62 miles (100km). The line was owned by the Princely Cochin State. Worked by Madras Railway up to 31 Dec 1907. Thereafter the working was undertaken by South Indian Railway(SIR) [2]

The railway and the Cochin Bridge were funded by the Maharaja (Diwan) of Cochin, of the Princely Cochin State who reigned from the year 1895 till 1914. The bridge was the first to ford the river that obstructed passage between Malabar and the southern states of Cohin/Travancore. The first freight train passed over the bridge on 2nd June 1902 and a few days later on the 16th the line opened to passenger traffic [3][4][5]

The following is recorded as being the statement of Mr J W Bhore, the Diwan of Cochin
“The line had been planned as part of the South Indian Railway(SIR) line from Madras to the West Coast in collaboration with the Railway Department of the Government of India. The Cochin State authorities had been informed that the line would be built by a certain date and it would be gauge(MG). The Cochin State built its line accordingly but had to wait for its connection, and when the SIR line did come to Shoranur it was to broad gauge, so all goods going either way had to be uploaded out of one set of trucks and loaded to another”. [6]

From 1907 at Chalakudy, an intermediate station on the 'Shoranur-Cochin Railway', the timber from the Parambikulam Forest Area operation was transferred from the 'Cochin State Forest Tramway' - see separate page for information.

Later History

The metre gauge (MG) line was converted to broad gauge (BG) in 1938 [7]

It was only in 1938 that the ‘Cochin Harbour Extension Railway’ was opened as an extension to the ‘Shoranur-Cochin Railway’. This was constructed as a broad gauge(BG) line [8].

Records

An on-line search of the IOR records relating to this railway [9] gives the following: -

  • L/F/8/17/1236 “ South Indian Railway Company Limited, Agreement for the working and maintenance of the Shoranur-Cochin State Railway His Highness Raja Sir Sri Rama Vurmah; 1908"

Further Information

See Madras Railway who worked the line up to up to 31 Dec 1907.
and South Indian Railway who worked the line from 1st Jan 1908.

References