Lucknow-Bareilly State Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
1918 Admin Report details checked/added/corrected
PEA-2292 (talk | contribs)
mNo edit summary
 
(5 intermediate revisions by the same user not shown)
Line 22: Line 22:
|timeline5details=   
|timeline5details=   
|presidency= [[Bengal]]
|presidency= [[Bengal]]
|stations= [[Daliganj]], [[Sitapur]], [[Kheri]], [[Pilibhit]], [[Bhojeepura]]
|stations= ''' [[Lucknow]] ''', [[Daliganj]], [[Sitapur]], [[Kheri]], [[Pilibhit]], [[Bhojeepura]], [[Bareilly]]
''See also separate page'' [[Lucknow_Railways_and_Stations#Lucknow_Stations| ''' Lucknow Junction Station''']] ''for details''
|system1date=
|system1date=
|system1details= [[Rohilkund and Kumaon Railway]]
|system1details= [[Rohilkund and Kumaon Railway]]
Line 31: Line 32:
}}
}}


The '''Lucknow-Bareilly State Railway''' was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway which formed an alternative northern "loop" between the cities of [[Lucknow]] and [[Bareilly]] to the broad gauge([[Rail_gauge#Broad_Gauge|BG]]) main line of the [[Oudh and Rohilkhand Railway]].
The '''Lucknow-Bareilly State Railway''' (LBSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway which formed an alternative northern "loop" between the cities of [[Lucknow]] and [[Bareilly]] to the broad gauge([[Rail_gauge#Broad_Gauge|BG]]) main line of the [[Oudh and Rohilkhand Railway]].
 
The [[Rohilkund and Kumaon Railway]](R&KR) worked the LBSR. The R&KR was also a [[Rail_gauge_#Metre_Gauge|MG]] railway, and together with the [[Rail_gauge#Narrow_Gauge|NG]] [[Powayan Light Railway]], the three railways were worked using shared facilities but retaining separate identities.  


==History==
==History==
Formed 1891 from merger of [[Lucknow-Sitapur & Bareilly Railway]] and [[Bareilly-Pilibheet Provincial State Railway]]; worked by [[Rohilkund and Kumaon Railway]](R&KR)
The LBSR was formed  in 1891 from merger of [[Lucknow-Sitapur & Bareilly Railway]] and [[Bareilly-Pilibheet Provincial State Railway]]; worked by [[Rohilkund and Kumaon Railway]](R&KR)
<ref>[http://hansard.millbanksystems.com/commons/1899/aug/03/guaranteed-railways-in-india "Guaranteed Railways in India"] ''Hansard 1803-2005'' (accessed 04 December 2008)</ref>
<ref>[http://hansard.millbanksystems.com/commons/1899/aug/03/guaranteed-railways-in-india "Guaranteed Railways in India"] ''Hansard 1803-2005'' (accessed 04 December 2008)</ref>
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 201]; Retrieved 19 Dec 2015</ref>
<ref name=Admin1918>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n209/mode/1up " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 201 pdf 209]; Retrieved 19 Dec 2015</ref>.
 
The LBSR expanded from 237 miles(379km) in 1905 to 312 miles(499km) in 1918 and worked as part of the R&KR system <ref name=Admin1918/>.
 
The LBSR was amalgamated in 1943 with the [[Bengal and North-Western Railway]](B&NWR) and the [[Rohilkund and Kumaon Railway]] (R&KR) to form the [[Oudh and Tirhut Railway]](O&TR).
<ref>Great Britain. Law Commission, Stationery Office [https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/228649/8330.pdf  H.M. Government “Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012"];  page 118, paragraph 3.15. Retrieved on 31 December 2015.</ref>
 
==LBSR Lines with Branches and Extensions==
*[[Lucknow-Bareilly LBSR Mainline]], opened in stages 1884-91; [[Lucknow]] via [[Sitapur]], [[Mailani ]]( Lakimpur and Gola Gokaran Nath), [[Pilibhit]], [[Bhojeepura]] to [[Bareilly]]. Total length 198 miles( 317km) <ref name=Admin1918/>
** ‘Bareilly Grain Siding Branch Line’, opened 1894, 1.75 miles (2.8km) <ref name=Admin1918/>
** ‘Miailani-Sonaripur Branch’, opened 1893-94, 31 miles(49km) .This line ran from [[Mailani]] through the forest to Marauncha Ghat on the River Sarda, which is crossed by a temporary bridge to [[Sonaripur]] <ref name=Gaz15,273>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V15_279.gif “Imperial Gazetteer of India”  v. 15, p. 273]; Retrieved 8 Dec 2016</ref>.
** ‘Kaurialaghat Extension Line’ a further extension of the ’Miailani-Sonaripur Branch’ (see above) reaching Kaurialaghat in 1911, an additional 20 miles(33km) <ref name=Admin1918/>.
** ‘Chandon Chok Extension Line’, opened 1903, 7.6 miles(12km) <ref name=Admin1918/> from [[Dudhwa]] on the LBSR Mainline to Mahan River  at the Nepal frontier, used chiefly for the export of grain and forest products <ref name=Gaz15,273/> .
** ‘Gauri Phanta Extension Line’, opened 1903, 14 miles24km) from [[Dudhwa]] to Gauri Phanta <ref name=Admin1918/>.
** ‘Barmdee Extension Line’, opened 1912, 39 miles(62km) from [[Pilibhit]] to Barmadee
 
==Lines Surveyed/Proposed by R&KR as Agent==
* ‘Dudhwa Branch Extension’ and ‘Ramnager Ghat Extension’, first proposed in  1895 by as a branch of the LBSR as a ‘forest siding which could be extended gradually as the forests were opened out and their produce made available to the public’. The Agent, the R&KR, had proposed for development as part- of R&KR system. The line when complete would be c.26 miles. The first section was opened in 1903 from [[Dudhwa]] to the Mahan River as the ‘Chandon Chok Extension Line’ ''(see above)'' <ref name=History1906>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n80/mode/1up “Histories of (Indian)Railway Projects ...up to June 1906” page 42]; Retrieved 8 Dec 2016</ref>. The remaining 20 miles,‘Sonaripur-Ramnager Ghat Extension Line’ ,  was still pending in 1906 <ref name=History1906/>. ''There is no evidence this Extension was completed.''
* ‘Pilibhit-Barmedo Branch’, 38 miles, surveyed in 1903 by the Agents, the R&KR, on behalf of the LBSR. ‘To be constructed from funds provided by the State as an extension to the LBSR, to which it will act as a feeder. It will serve lower Kumaon and the forests on the banks of the Sarda River’ <ref name=History1906/>.''There is no evidence this Branch Line was completed.''
 
==Records==
Refer to FIBIS Fact File  #4: “Research sources for Indian Railways, 1845-1947” -  available from the [http://www.fibis.org/store/fibis-books-and-publications/bff-0004-research-sources-for-indian-railways-1845-1947/ Fibis shop]. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the [[India Office Records]] (IOR) held at the [[British Library]]
 
An on-line search of the IOR records relating to this railway <ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2  “British Library Archives and Manuscripts Catalogue”  - Search];  Retrieved  26  Jan 2016</ref>
gives the following: -
*'''L /F/8/19/1436 '''  “Rohilkund and Kumaon and Lucknow Bareilly State Railways and Powayan Steam Tramway, Reprint of contracts showing modifications up to and includng the contract of July 3rd 1914; 1917”
*'''L /AG/46/35 '''  “Records of the India Office relating to the Rohilkund and Kumaon Railway Company; 1882-1931” – ‘The Company also managed the Lucknow-Bareilly State’


== References ==
== References ==

Latest revision as of 15:13, 14 March 2021

Lucknow-Bareilly State Railway
[[Image:|150px| ]]
Line of route
Lucknow to Bareilly
Mailani to Chandan Chowki (branch)
Gauge / mileage
Metre gauge 237 miles (1905)
Timeline
Key locations
Presidency Bengal
Stations Lucknow , Daliganj, Sitapur, Kheri, Pilibhit, Bhojeepura, Bareilly

See also separate page Lucknow Junction Station for details

System agency
Rohilkund and Kumaon Railway
How to interpret this infobox

The Lucknow-Bareilly State Railway (LBSR) was a metre gauge(MG) railway which formed an alternative northern "loop" between the cities of Lucknow and Bareilly to the broad gauge(BG) main line of the Oudh and Rohilkhand Railway.

The Rohilkund and Kumaon Railway(R&KR) worked the LBSR. The R&KR was also a MG railway, and together with the NG Powayan Light Railway, the three railways were worked using shared facilities but retaining separate identities.

History

The LBSR was formed in 1891 from merger of Lucknow-Sitapur & Bareilly Railway and Bareilly-Pilibheet Provincial State Railway; worked by Rohilkund and Kumaon Railway(R&KR) [1] [2].

The LBSR expanded from 237 miles(379km) in 1905 to 312 miles(499km) in 1918 and worked as part of the R&KR system [2].

The LBSR was amalgamated in 1943 with the Bengal and North-Western Railway(B&NWR) and the Rohilkund and Kumaon Railway (R&KR) to form the Oudh and Tirhut Railway(O&TR). [3]

LBSR Lines with Branches and Extensions

  • Lucknow-Bareilly LBSR Mainline, opened in stages 1884-91; Lucknow via Sitapur, Mailani ( Lakimpur and Gola Gokaran Nath), Pilibhit, Bhojeepura to Bareilly. Total length 198 miles( 317km) [2]
    • ‘Bareilly Grain Siding Branch Line’, opened 1894, 1.75 miles (2.8km) [2]
    • ‘Miailani-Sonaripur Branch’, opened 1893-94, 31 miles(49km) .This line ran from Mailani through the forest to Marauncha Ghat on the River Sarda, which is crossed by a temporary bridge to Sonaripur [4].
    • ‘Kaurialaghat Extension Line’ a further extension of the ’Miailani-Sonaripur Branch’ (see above) reaching Kaurialaghat in 1911, an additional 20 miles(33km) [2].
    • ‘Chandon Chok Extension Line’, opened 1903, 7.6 miles(12km) [2] from Dudhwa on the LBSR Mainline to Mahan River at the Nepal frontier, used chiefly for the export of grain and forest products [4] .
    • ‘Gauri Phanta Extension Line’, opened 1903, 14 miles24km) from Dudhwa to Gauri Phanta [2].
    • ‘Barmdee Extension Line’, opened 1912, 39 miles(62km) from Pilibhit to Barmadee

Lines Surveyed/Proposed by R&KR as Agent

  • ‘Dudhwa Branch Extension’ and ‘Ramnager Ghat Extension’, first proposed in 1895 by as a branch of the LBSR as a ‘forest siding which could be extended gradually as the forests were opened out and their produce made available to the public’. The Agent, the R&KR, had proposed for development as part- of R&KR system. The line when complete would be c.26 miles. The first section was opened in 1903 from Dudhwa to the Mahan River as the ‘Chandon Chok Extension Line’ (see above) [5]. The remaining 20 miles,‘Sonaripur-Ramnager Ghat Extension Line’ , was still pending in 1906 [5]. There is no evidence this Extension was completed.
  • ‘Pilibhit-Barmedo Branch’, 38 miles, surveyed in 1903 by the Agents, the R&KR, on behalf of the LBSR. ‘To be constructed from funds provided by the State as an extension to the LBSR, to which it will act as a feeder. It will serve lower Kumaon and the forests on the banks of the Sarda River’ [5].There is no evidence this Branch Line was completed.

Records

Refer to FIBIS Fact File #4: “Research sources for Indian Railways, 1845-1947” - available from the Fibis shop. This Fact File contains invaluable advice on 'Researching ancestors in the UK records of Indian Railways' with particular reference to the India Office Records (IOR) held at the British Library

An on-line search of the IOR records relating to this railway [6] gives the following: -

  • L /F/8/19/1436 “Rohilkund and Kumaon and Lucknow Bareilly State Railways and Powayan Steam Tramway, Reprint of contracts showing modifications up to and includng the contract of July 3rd 1914; 1917”
  • L /AG/46/35 “Records of the India Office relating to the Rohilkund and Kumaon Railway Company; 1882-1931” – ‘The Company also managed the Lucknow-Bareilly State’

References