Wadi-Secunderbad Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Princley State link added
PEA-2292 (talk | contribs)
Extra info added with links and 'Reference'
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
The '''Wadi-Secunderbad Railway''' opened in 1874. The construction was financed by Nizam of the [[Princely states|Princely ]][[Hyderabad State]].  
The '''Wadi-Secunderbad Railway''' opened in 1874. The construction was financed by Nizam of the [[Princely states|Princely ]][[Hyderabad State]] and was first named '''[[Nizam's Railway]]'''.  


Later the line became part of [[Nizam's Guaranteed State Railway]](NGSR)
The line was  broad gauge([[Rail_gauge#Broad_Gauge|BG]]), from [[Wadi]]  Junction to [[Secunderabad]], opened 1874, 115 miles(185km) <ref name=Admin_p.98>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n107/mode/1up “Administration Report on Railways 1918” page 98 (pdf107)]; Retrieved  1 Dec 2016</ref>.


In 1883, on the formation of the '''[[Nizam's Guaranteed State Railway]]'''(NGSR), the line became the first section of the BG [[Hyderabad Main Line]].
The 6 mile section [[Hyderabad]] to [[Secunderabad]] was in 1901 converted to mixed gauge (BG and metre gauge[[Rail_gauge_#Metre_Gauge|MG]]) to enable the MG  [[Hyderabad-Godavari Valley Railway]] MG line to reach [[Hyderabad]]
==Further Information==
See '''[[Nizam's Railway]]''' up to 1883
then '''[[Nizam's Guaranteed State Railway]]'''
== References ==
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:Indian States Railways]]
[[Category:Indian States Railways]]

Latest revision as of 05:27, 2 December 2016

The Wadi-Secunderbad Railway opened in 1874. The construction was financed by Nizam of the Princely Hyderabad State and was first named Nizam's Railway.

The line was broad gauge(BG), from Wadi Junction to Secunderabad, opened 1874, 115 miles(185km) [1].

In 1883, on the formation of the Nizam's Guaranteed State Railway(NGSR), the line became the first section of the BG Hyderabad Main Line.

The 6 mile section Hyderabad to Secunderabad was in 1901 converted to mixed gauge (BG and metre gaugeMG) to enable the MG Hyderabad-Godavari Valley Railway MG line to reach Hyderabad

Further Information

See Nizam's Railway up to 1883

then Nizam's Guaranteed State Railway

References