Changes

Jump to navigation Jump to search

Bengal-Nagpur Railway

11 bytes added, 04:18, 10 September 2015
m
Links corrected
*[[Cuttack-Midnapore-Calcutta Railway Survey]]. Surveyed 1899 and absorbed into BNR network, extended by BNR 1901
*[[Nagbhir-Nagpur Branch Railway]]. Opened 1908, branch line of BNR(qv) Southern Grid. Construction commenced 1905
*[[Raipur-Dhamtari Railway]] and [[Rajim Branch Railway]]. The first narrow gauge branch of BNR(qv), opened 1900 and extended to Rajim 1906*[[Purulia-Ranchi Light Railway]]. Opened 1907 Narrow gauge section of BNR*[[Satpura RailwaysRailway]]. Developed by the BNR 1902-9; connected Jubbupore with Gondia, Mandla Fort, Chhindwara and Nagpur; later extended. Comprising -
**[[Gondia-Chanda Railway]]. Extension of the BNR narrow gauge Satpura Railway network, opened 1908-16
**[[Gondia-Nainpur-Chhindwara-Jabalpur Railway]]. Opened 1903-05 as part of Satpura Narrow Gauge Lines
**[[JubbleporeJubbulpore-Gondia Railway]]. Opened 1902, owned by GoI; worked by BNR(qv); merged into Satpura Rly(qv), c.1920
**[[Nainpur-Mandla Fort Railway]]. Opened 1909; worked by BNR as part of Satpura Narrow Gauge Lines
9,628
edits

Navigation menu