Barsee Tramway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
New page all checked
 
PEA-2292 (talk | contribs)
Complete re-write with BL research by Steve Moore
Line 1: Line 1:
The '''Barsee Tramway''' is mentioned as an 1863 project to connect Barsee with the Barsee railway station in the [[India Office Records]] (IOR) stated below. No further information has been found.
The '''Barsee Tramway''' to connect Barsee with the Barsee railway station is recorded in the British Library [[India Office Records]] V/23/232, No 71 for 1863
<br>The  ‘Page’ references  quoted refer to this record.


It appears likely that Barsee was later renamed Barsi.


The Imperial Gazetter of India <ref>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V07_094.gif Imperial Gazetteer; Vol 7, page ];  Retrieved 2 Apr 2016</ref> states that 'The town is connected with Barsi Road station on the [[Great Indian Peninsula Railway]] by the [[Barsi Light Railway]], opened in 1897.
''Spelling Note''
<blockquote>
'''Barsee''' and '''Barsee Tramway''' are spellings given in this 1863 record
<br>''We have retained the spelling Barsee only with reference to this Tramway''


''No evidence has been found to confirm if this tramway was ever constructed prior to the construction of the [[Barsi Light Railway]].''
'''[[Barsi]]'''  and '''[[Barsi Light Railway]]''' are used from about 1870 onwards, and in the [[Imperial Gazetteer of India]] that we take as our definitive spelling. 
<br>''We have therefore used the spelling [[Barsi]] in all other references''
</blockquote>


==Records==
==Barsee Tramway==
An on-line search of the [[India Office Records]] (IOR) records held at the [[British Library]] relating to this tramway <ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2  “British Library Archives and Manuscripts Catalogue”  - Search];  Retrieved 2 Apr 2016</ref>
'''Background'''
gives the following: -
*V/23/232, No 71; "Papers relating to the project of connecting Barsee with the Barsee railway station by tramways. Bombay: Education Society's Press, 1863"


''This record has not been examined and may provide further information.''
The [[Great Indian Peninsula Railway]] (GIPR) broad gauge([[Rail_gauge#Broad_Gauge|BG]]) 'South-East Mainline' section from [[Poona]] to Barsee Road Station opened in 1859 and was connected to [[Madras]] in 1863 with the opening of the [[Bhore Ghat Railway Construction|Bhore Ghat section]].
 
In September 1862, The Chief Engineer of the Presidency of Bombay, Lt. Col.  M. K. Kennedy, submitted a proposal with five alternatives  regarding connecting the town of Barsee to the GIPR Mainline at Barsee Road Station, a distance of 22 miles(35km) by way of a Bullock operated  broad gauge([[Rail_gauge#Broad_Gauge|BG]])  Tramway.
<br>The proposals comprised:- a single track Tramway with passing places;  or a road either 20 foot(6.1m) wide or 24 foot(7.3m) wide with a single track Tramway that would run on one side. All proposals to include passing places <ref>Pages 4-8</ref>. 
<br>The problem was the crossing the Seena (Sina)River and two estimates for a bridge were provided:- a brick/stone arched bridge or an iron girder bridge <ref>Pages 9,10</ref>.
 
The early crops had failed so it was decided that as a means of famine relief the road and bridge should be built (Bombay Government Resolution 8 October 1862) <ref>Page 14</ref>.  A 24 foot(7.3m) road with a gradient of less than 1 in 100 was required  <ref>Page 25</ref>.  Meanwhile, the [[Government of India]] requested the GIPR, the [[Sind Railway]] and the [[Bombay, Baroda and Central India Railway]](BB&CIR) Companies, to submit designs and recommendations regarding a bullock tramway carrying 300 tons a day over a distance of 50 miles <ref>Pages 26-31</ref>.
 
The [[GIPR]] replied that it did not think that a tramway was suitable and that a broad gauge([[Rail_gauge#Broad_Gauge|BG]])  branch line <ref>Pages 33-36</ref>. Sind and BB&CIR both sent back detailed drawings and estimates, both thought that a broad gauge([[Rail_gauge#Broad_Gauge|BG]]) was preferable as this would be interchangeable with the main lines but bullock power was possible <ref>Pages 40-45</ref>. Sind also suggested that it might be more economic to use a light rail locomotive and supplied the information regarding this <ref>Pages 47-48</ref>. The final information was received in January 1863 <ref>Page 54</ref>. The Governor had indicated that he thought a branch line was preferable <ref>Page 23</ref>.
 
''' 'The Road' '''
'The Road' was constructed with earth works, cuttings and bridges and although first proposed in 1862 was not completed until 1870 <ref name=Engineering>“Barsi Light Rail - E.R.Calthrope & the Newly Exhibition”  from ‘Engineering’ 20 Jan 1897, page 183.  Reproduced by  ‘Narrow Gauge and Industrial  Railway Modeling Review’ No 69 Vol 9 January 2007, editor Roy C Link.  ISSN 0958-0808</ref>.
 
By this time [[Barsi]] had become the  spelling of the town and was connected to Barsi Road Station , on the [[GIPR]], a distance of 22 miles (35km), with a roadway of 24 foot width (7.3 metres) with 'hard shoulders' <ref>Page 25</ref> and of designed to be built with sufficient strength to carry locomotives and the gradients did not exceed 1 in 100 <ref name=Engineering/>. The Seena (Sina) River bridge was a ten arch masonry constructed bridge.
 
''' 'The Tramway' '''
 
The proposal  to included the construction of a broad gauge([[Rail_gauge#Broad_Gauge|BG]])  'Tramway' did not proceed and ‘The Road' was used for cart and pedestrian traffic. Over the years that followed the embankments became consolidated <ref name=Engineering/>.
 
 
==[[Barsi Light Railway]]==
[[Everard Richard Calthrop]] had, in 1887, registered in London the [[Indian Railways Feeder Lines Company]] to promote the construction of narrow gauge ([[Rail_gauge#Narrow_Gauge|NG]]) lines in India. He resigned from [[GIPR]] in 1889.
 
Calthrope, in 1887, commenced negotiations with the Government of Bombay for a concession to build a Light Railway on the bed of the 'Road'. Negotiations were concluded and in 1895 the '''[[Barsi Light Railway|'Barsi Light Railway Company']]''' (BLR) was formed utilising engineering solutions based on many innovative designs.
 
A request for tender was put out and on the 1st August 1895 an agreement was signed to build a 2ft 6inch([[Rail_gauge#Narrow_Gauge|NG]])  light railway between the [[GIPR]] Barsi Road Station and [[Barsi]] Town.
 
The first BLR section between Barsi Road Station on the [[GIPR]] (later named Kurduwadi) and [[Barsi ]] Town opened in 1897 utilising the ‘The Road' as the trackbed.
 
==Further Information==
See '''[[Barsi Light Railway]]''' for further information and references


==References==
==References==
British Library IOR/V/23/232, No 71; "Papers relating to the project of connecting Barsee with the Barsee railway station by tramways.” Bombay: Education Society's Press, 1863" File held on Microfiche. With page numbers as follows:-
<references />
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:Tramways]]
[[Category:Tramways]]

Revision as of 09:30, 10 January 2017

The Barsee Tramway to connect Barsee with the Barsee railway station is recorded in the British Library India Office Records V/23/232, No 71 for 1863
The ‘Page’ references quoted refer to this record.


Spelling Note

Barsee and Barsee Tramway are spellings given in this 1863 record
We have retained the spelling Barsee only with reference to this Tramway

Barsi and Barsi Light Railway are used from about 1870 onwards, and in the Imperial Gazetteer of India that we take as our definitive spelling.
We have therefore used the spelling Barsi in all other references

Barsee Tramway

Background

The Great Indian Peninsula Railway (GIPR) broad gauge(BG) 'South-East Mainline' section from Poona to Barsee Road Station opened in 1859 and was connected to Madras in 1863 with the opening of the Bhore Ghat section.

In September 1862, The Chief Engineer of the Presidency of Bombay, Lt. Col. M. K. Kennedy, submitted a proposal with five alternatives regarding connecting the town of Barsee to the GIPR Mainline at Barsee Road Station, a distance of 22 miles(35km) by way of a Bullock operated broad gauge(BG) Tramway.
The proposals comprised:- a single track Tramway with passing places; or a road either 20 foot(6.1m) wide or 24 foot(7.3m) wide with a single track Tramway that would run on one side. All proposals to include passing places [1].
The problem was the crossing the Seena (Sina)River and two estimates for a bridge were provided:- a brick/stone arched bridge or an iron girder bridge [2].

The early crops had failed so it was decided that as a means of famine relief the road and bridge should be built (Bombay Government Resolution 8 October 1862) [3]. A 24 foot(7.3m) road with a gradient of less than 1 in 100 was required [4]. Meanwhile, the Government of India requested the GIPR, the Sind Railway and the Bombay, Baroda and Central India Railway(BB&CIR) Companies, to submit designs and recommendations regarding a bullock tramway carrying 300 tons a day over a distance of 50 miles [5].

The GIPR replied that it did not think that a tramway was suitable and that a broad gauge(BG) branch line [6]. Sind and BB&CIR both sent back detailed drawings and estimates, both thought that a broad gauge(BG) was preferable as this would be interchangeable with the main lines but bullock power was possible [7]. Sind also suggested that it might be more economic to use a light rail locomotive and supplied the information regarding this [8]. The final information was received in January 1863 [9]. The Governor had indicated that he thought a branch line was preferable [10].

'The Road'

'The Road' was constructed with earth works, cuttings and bridges and although first proposed in 1862 was not completed until 1870 [11].

By this time Barsi had become the spelling of the town and was connected to Barsi Road Station , on the GIPR, a distance of 22 miles (35km), with a roadway of 24 foot width (7.3 metres) with 'hard shoulders' [12] and of designed to be built with sufficient strength to carry locomotives and the gradients did not exceed 1 in 100 [11]. The Seena (Sina) River bridge was a ten arch masonry constructed bridge.

'The Tramway'

The proposal to included the construction of a broad gauge(BG) 'Tramway' did not proceed and ‘The Road' was used for cart and pedestrian traffic. Over the years that followed the embankments became consolidated [11].


Barsi Light Railway

Everard Richard Calthrop had, in 1887, registered in London the Indian Railways Feeder Lines Company to promote the construction of narrow gauge (NG) lines in India. He resigned from GIPR in 1889.

Calthrope, in 1887, commenced negotiations with the Government of Bombay for a concession to build a Light Railway on the bed of the 'Road'. Negotiations were concluded and in 1895 the 'Barsi Light Railway Company' (BLR) was formed utilising engineering solutions based on many innovative designs.

A request for tender was put out and on the 1st August 1895 an agreement was signed to build a 2ft 6inch(NG) light railway between the GIPR Barsi Road Station and Barsi Town.

The first BLR section between Barsi Road Station on the GIPR (later named Kurduwadi) and Barsi Town opened in 1897 utilising the ‘The Road' as the trackbed.

Further Information

See Barsi Light Railway for further information and references

References

British Library IOR/V/23/232, No 71; "Papers relating to the project of connecting Barsee with the Barsee railway station by tramways.” Bombay: Education Society's Press, 1863" File held on Microfiche. With page numbers as follows:-

  1. Pages 4-8
  2. Pages 9,10
  3. Page 14
  4. Page 25
  5. Pages 26-31
  6. Pages 33-36
  7. Pages 40-45
  8. Pages 47-48
  9. Page 54
  10. Page 23
  11. 11.0 11.1 11.2 “Barsi Light Rail - E.R.Calthrope & the Newly Exhibition” from ‘Engineering’ 20 Jan 1897, page 183. Reproduced by ‘Narrow Gauge and Industrial Railway Modeling Review’ No 69 Vol 9 January 2007, editor Roy C Link. ISSN 0958-0808
  12. Page 25