Goalpara Forest Tramway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
IOR Record of photograph added
PEA-2292 (talk | contribs)
Revised page with info added and links checked.
Line 1: Line 1:
The [[Goalpara Forest Tramway]] was constructed in  1901-02 as a tramline to transport timber from the [[Goalpara]] forest to Fakiragram Staion of the [[East Bengal Railway]] (EBR). The line was exclusively built to serve the interests of the Forest Department, yet it indirectly developed the transport system in that area as well. The line length was initially 2.5 miles(4km) and extended to a total of 31.5 miles(50km) by 1938-39
The '''Goalpara Forest Tramway''' was constructed in  1901-02 as a tramline to transport timber from the [[Goalpara]] forest to [[Fakiragram]] station of the [[Eastern Bengal Railway]] (EBR). The line was exclusively built to serve the interests of the Forest Department, yet it indirectly developed the transport system in that area as well. The line length was initially 2.5 miles(4km) and extended to a total of 31.5 miles(50km) by 1938-39 <ref name=Handique>[https://books.google.fr/books?id=acPL3Lflga4C&pg=PA117&lpg=PA117&dq=goalpara+forest+tramway&source=bl&ots=hoFotVzzin&sig=sDcOFBYtAyU7aQtITD9Fo0iB2YU&hl=fr&sa=X&ved=0ahUKEwiSvO6cgPTJAhUByRoKHaySAxoQ6AEIOjAF#v=onepage&q=goalpara%20forest%20tramway&f=false "British Forest Policy in Assam" by  Rajib Handique page 117]; Retrieved 25 Aug 2016</ref>. At [[Fakiragram]] the tramway connected to the [[Dhubri Branch Railway]] of the EBR which opened in 1902.
<ref>[https://books.google.fr/books?id=acPL3Lflga4C&pg=PA117&lpg=PA117&dq=goalpara+forest+tramway&source=bl&ots=hoFotVzzin&sig=sDcOFBYtAyU7aQtITD9Fo0iB2YU&hl=fr&sa=X&ved=0ahUKEwiSvO6cgPTJAhUByRoKHaySAxoQ6AEIOjAF#v=onepage&q=goalpara%20forest%20tramway&f=false "British Forest Policy in Assam" by  Rajib Handique page 117]; Retrieved 24 Dec 2015</ref>
 
The [[Imperial Gazetteer of India]], 1906 records ‘ The Goapara forests are of considerable commercial importance. The Government Reserves in 1903-4 covered an area of 787 square miles  ... the principal forests ... are situated in the Bhutan hills, about 36 miles from [[Dhubri]].  The difficulties of transport are considerable, but have been to some extent overcome by the purchase of 6 miles of portable tramway. The experiment has proved a success, and the length of line will probably be increased’ <ref>[http://dsal.uchicago.edu/reference/gazetteer/pager.html?objectid=DS405.1.I34_V12_279.gif "Imperial Gazetteer of India", v. 12, p. 273 and 274; 1908]; Retrieved 25 Aug 2016</ref>.


==Records==
==Records==

Revision as of 10:43, 25 August 2016

The Goalpara Forest Tramway was constructed in 1901-02 as a tramline to transport timber from the Goalpara forest to Fakiragram station of the Eastern Bengal Railway (EBR). The line was exclusively built to serve the interests of the Forest Department, yet it indirectly developed the transport system in that area as well. The line length was initially 2.5 miles(4km) and extended to a total of 31.5 miles(50km) by 1938-39 [1]. At Fakiragram the tramway connected to the Dhubri Branch Railway of the EBR which opened in 1902.

The Imperial Gazetteer of India, 1906 records ‘ The Goapara forests are of considerable commercial importance. The Government Reserves in 1903-4 covered an area of 787 square miles ... the principal forests ... are situated in the Bhutan hills, about 36 miles from Dhubri. The difficulties of transport are considerable, but have been to some extent overcome by the purchase of 6 miles of portable tramway. The experiment has proved a success, and the length of line will probably be increased’ [2].

Records

An on-line search of the India Office Records (IOR) records held at the British Library relating to this tramway [3] gives the following:-

  • Mss Eur F252/18b; Folio 30 verso: photograph of the Forest Steam Tramway; Jan 1926-Oct 1926

References