Neemuch Nasirabad State Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Created page with "*Neemuch Nasirabad State Railway, Neemuch to Ajmer, the construction was started in 1879, and the work completed in March 1881. In 1881-82, the '''Rajputana-Malwa State R..."
 
PEA-2292 (talk | contribs)
m CategoryRailways added
Line 11: Line 11:


In 1900 the RMSR was merged into the [[Bombay, Baroda and Central India Railway]](BB&CIR), becoming the latter's Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) section; known as Ratlam Division of BB&CIR..
In 1900 the RMSR was merged into the [[Bombay, Baroda and Central India Railway]](BB&CIR), becoming the latter's Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) section; known as Ratlam Division of BB&CIR..
[[Category:Railways]]

Revision as of 08:30, 19 September 2015

In 1881-82, the Rajputana-Malwa State Railway (RMSR) was created amalgamating, under single management, existing State Railways:-

All these railways were worked by Bombay, Baroda and Central India Railway(BB&CIR) State Railways; all worked by BB&CIR.

In 1900 the RMSR was merged into the Bombay, Baroda and Central India Railway(BB&CIR), becoming the latter's Metre Gauge(MG) section; known as Ratlam Division of BB&CIR..