Gauhati Branch Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
Updated info added, links tested - Work in Progress removed.
Line 1: Line 1:
'''Gauhati Branch Railway'''
'''Gauhati Branch Railway'''


Part of Assam Section of EBR(qv) incorporating part of Kaunia Dharle Railway(qv); opened 1906, extended up to 1909
Part of Assam Section of [[Eastern Bengal Railway]](EBR) incorporating part of [[Kaunia-Dharlia State Tram/Railway|Kaunia Dharle Railway]] connecting Golakganj with Gauhati, a distance of 147 miles (235km).
 
This  Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) line was opened in 1906 and  extended to reach Armingoan by 1909; where it linked to EBR’s [[Amingaon-Pandu Train Ferry]]; crossing the Brahmaputra River to the [[Pandu Ghat-Gauhati Railway]] connecting to [[Assam-Bengal Railway]](ABR) at Gauhati.


{{Work-in-Progress-Rly}}


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]

Revision as of 05:53, 1 October 2015

Gauhati Branch Railway

Part of Assam Section of Eastern Bengal Railway(EBR) incorporating part of Kaunia Dharle Railway connecting Golakganj with Gauhati, a distance of 147 miles (235km).

This Metre Gauge(MG) line was opened in 1906 and extended to reach Armingoan by 1909; where it linked to EBR’s Amingaon-Pandu Train Ferry; crossing the Brahmaputra River to the Pandu Ghat-Gauhati Railway connecting to Assam-Bengal Railway(ABR) at Gauhati.