Cawnpore-Barabanki Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Data added, links checked, Work-in-progress removed
PEA-2292 (talk | contribs)
References replacing External Links
Line 3: Line 3:


The Cawnpore-Barabanki Railway was essentially the common stem of the B&NWR and the R&KR networks. The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953.
The Cawnpore-Barabanki Railway was essentially the common stem of the B&NWR and the R&KR networks. The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953.
<ref>[https://en.wikipedia.org/wiki/Cawnpore-Barabanki_Railway Wikipedia "Cawnpore-Barabanki Railway"]; Retrieved 10 Dec 2015</ref>
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf  "Indian Railway Line History" page 11 by Keith Scholey]; Retrieved 10 Dec 2015</ref>


There were two lines:
There were two lines:
Line 11: Line 13:




==External Links==
*[https://en.wikipedia.org/wiki/Cawnpore-Barabanki_Railway Wikipedia - Cawnpore-BarabankiRailway]
*[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf Page 11. Indian Railway Line History by Keith Scholey]


== References ==
<references />


[[Category:Railways]]
[[Category:Railways]]
[[Category:State Railways]]
[[Category:State Railways]]

Revision as of 09:48, 10 December 2015

The Cawnpore-Barabanki Railway was owned by the Government of India(GoI) and managed as part of the East Indian Railway(EIR), and was worked by the Bengal and North-Western Railway(B&NWR) and the Rohilkund and Kumaon Railway(R&KR) and their successors.

The Cawnpore-Barabanki Railway was essentially the common stem of the B&NWR and the R&KR networks. The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953. [1] [2]

There were two lines:

  • Cawnpore-Aishbagh line (Metre gauge: 45 miles). Cawnpore (BBCI) to Aishbagh (R&KR) (45 miles) opened between 25 April and 15 May 1897. Part of this section was originally named the Cawnpore-Burhwal Railway (Metre Gauge Link), an existing branch of the O&RR to which a third rail was added, creating a short, mixed-gauge link.
  • Daliganj-Barabanki line (Metre gauge: 18 miles).Daliganj (R&K) to Barabanki (BNW) (18 miles) opened 24 November 1896


References