John Brunton: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
mNo edit summary
PEA-2292 (talk | contribs)
Link added
Line 3: Line 3:
==Railway Achievements in India==
==Railway Achievements in India==
*1857, Appointed Chief Resident Engineer of [[Scinde Railway]] (Sind Railway) <ref name=Hughes>[https://books.google.co.uk/books?id=C-pzUWrCU5sC&pg=PA126&lpg=PA126&dq=description+of+the+line+and+works+of+the+Scinde+Railway&source=bl&ots=DTW2uSH2hD&sig=_JCaeiJ6FfK1irALjNQRIr_RF-8&hl=en&sa=X&ved=0ahUKEwiypcPWoKfNAhUFIMAKHbSaBOYQ6AEIJDAC#v=onepage&q=description%20of%20the%20line%20and%20works%20of%20the%20Scinde%20Railway&f=false Google Books "The Archaeology of an Early Railway System: The Brecon Forest Tramroads" by Stephen Hughes, page 126]; Retrieved 14 Jun 2016</ref>
*1857, Appointed Chief Resident Engineer of [[Scinde Railway]] (Sind Railway) <ref name=Hughes>[https://books.google.co.uk/books?id=C-pzUWrCU5sC&pg=PA126&lpg=PA126&dq=description+of+the+line+and+works+of+the+Scinde+Railway&source=bl&ots=DTW2uSH2hD&sig=_JCaeiJ6FfK1irALjNQRIr_RF-8&hl=en&sa=X&ved=0ahUKEwiypcPWoKfNAhUFIMAKHbSaBOYQ6AEIJDAC#v=onepage&q=description%20of%20the%20line%20and%20works%20of%20the%20Scinde%20Railway&f=false Google Books "The Archaeology of an Early Railway System: The Brecon Forest Tramroads" by Stephen Hughes, page 126]; Retrieved 14 Jun 2016</ref>
*1858-62, 'Supervised the construction of the 108 miles(174km) of the [[Scinde Railway]] between [[Karachi]] and [[Kotri]] until its completion in 1862. His detailed "Description of the line and works of the Scinde Railway" <ref>[http://www.icevirtuallibrary.com/doi/abs/10.1680/imotp.1863.23344?src=recsys Minutes of the Proceedings of the Institution of Civil Engineers, Volume 22,  January 1863, pages 451-"Description of the line and works of the Scinde Railway"  by John Brunton]; Retrieved 14 Jun 2016</ref> itemise the problems of building in the tropics.'
*1858-62, 'Supervised the construction of the 108 miles(174km) of the [[Scinde Railway]] between [[Karachi-Kotri (Indus River) Railway|Karachi and Kotri]] until its completion in 1862. His detailed "Description of the line and works of the Scinde Railway" <ref>[http://www.icevirtuallibrary.com/doi/abs/10.1680/imotp.1863.23344?src=recsys Minutes of the Proceedings of the Institution of Civil Engineers, Volume 22,  January 1863, pages 451-"Description of the line and works of the Scinde Railway"  by John Brunton]; Retrieved 14 Jun 2016</ref> itemise the problems of building in the tropics.'
*He also surveyed the line of the [[Indus Valley State Railway]] and then returned to Britain.
*He also surveyed the line of the [[Indus Valley State Railway]] and then returned to Britain.
*From 1870 Consulting Engineer to Karachi, being the Engineer to the [[Karachi Steam Tramway|Karachi Street Tramways]] which operated were operated by the [[East India Tramway Company]].
*From 1870 Consulting Engineer to Karachi, being the Engineer to the [[Karachi Steam Tramway|Karachi Street Tramways]] which operated were operated by the [[East India Tramway Company]].

Revision as of 05:29, 15 June 2016

John Brunton (1812-1899) [1]

Railway Achievements in India

His son William Arthur Brunton from 1857-70 was an Engineer with the Scinde Railway, the Indus Valley Railway and finally the Oudh and Rohilkhand Railway [2].

Recommended Reading

The following book is 'Waiting for Review' by FIBIS "The Diary of John Brunton"

  • Brunton, John, "The Diary of John Brunton, Engineer, East India Railway Company", Karchi: City Press, 1997. ISBN 99-8380-03-5. (Reprint version). Originally printed by Cambridge University Press, 1939. The Introduction to the book is available in Preview Google Books (Title transferred January 2016)

References