Goalundo-Narayanganj Extension Railway Survey: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
New page all checked
 
PEA-2292 (talk | contribs)
References added and text changes
Line 1: Line 1:
[[File: Goalundo-Narayanganj Extension Railway Survey.png|thumb| Goalundo-Narayanganj Extension Railway Survey]]
[[File: Goalundo-Narayanganj Extension Railway Survey.png|thumb| Goalundo-Narayanganj Extension Railway Survey]]
The '''Goalundo-Narayanganj Extension'''  was surveyed by the [[Eastern Bengal Railway]](EBR) during the period 1894-98. The record states “the object of connecting Calcutta with the Assam-Bengal Railway” <ref<[https://archive.org/details/in.ernet.dli.2015.208633/page/n7 “Summary of the principal measures of the viceroyalty of the Earl of Elgin in the Public Works Department Jan 1894 to Dec 1898” page 21, para 77, pdf 34]; Retrieved 25 Jan 2019</ref>.
The '''Goalundo-Narayanganj Extension'''  was surveyed by the [[Eastern Bengal Railway]](EBR) during the period 1894-98. The record states “the object of connecting Calcutta with the Assam-Bengal Railway” <ref>[https://archive.org/details/in.ernet.dli.2015.208633/page/n7 “Summary of the principal measures of the viceroyalty of the Earl of Elgin in the Public Works Department Jan 1894 to Dec 1898” page 21, para 77, pdf 34]; Retrieved 25 Jan 2019</ref>.


This line was not constructed, it involved crossing the River Ganges.  
This line was not constructed; it involved crossing the River Ganges.
 
A further survey was undertaken in  1906 to connect this proposed line to the [[Hajiganj-Shatnal Railway Survey|proposed '''Hajiganj-Shatnal Railway''' -'' see separate page'']] <ref>[https://archive.org/stream/RailwayProjects/Railway%20projects#page/n0/mode/1up  "Histories of (Indian)Railway P rojects ...up to June 1906"]; Retrieved 1 Apr 2019</ref>.
<br>This line also was not constructed.


Even today the railway stops at Goalundo Ghat Station, a short distance from the ferry terminal at Daulatdia crossing to Paturia on the opposite bank of the Ganges.
Even today the railway stops at Goalundo Ghat Station, a short distance from the ferry terminal at Daulatdia crossing to Paturia on the opposite bank of the Ganges.

Revision as of 10:33, 1 April 2019

Goalundo-Narayanganj Extension Railway Survey

The Goalundo-Narayanganj Extension was surveyed by the Eastern Bengal Railway(EBR) during the period 1894-98. The record states “the object of connecting Calcutta with the Assam-Bengal Railway” [1].

This line was not constructed; it involved crossing the River Ganges.

A further survey was undertaken in 1906 to connect this proposed line to the proposed Hajiganj-Shatnal Railway - see separate page [2].
This line also was not constructed.

Even today the railway stops at Goalundo Ghat Station, a short distance from the ferry terminal at Daulatdia crossing to Paturia on the opposite bank of the Ganges.

References