Jammu and Kashmir Railway

From FIBIwiki
Revision as of 06:20, 22 January 2017 by PEA-2292 (talk | contribs) (Opening paragraph revised with new information and link)
Jump to navigation Jump to search
Jammu and Kashmir Railway
[[Image:|150px| ]]
Line of route
Sialkot to Jammu
Gauge / mileage
Broad gauge 16 miles (1905)
Timeline
Key locations
Presidency Bengal
Stations
System agency
Worked by North Western Railway
How to interpret this infobox

The Jammu and Kashmir Railway was a short broad gauge(BG) branch financed by the Princely Kashmir State Durbar. The 16 mile(26km) line opened in 1890 linking Sialkot to Jammu and was worked by North Western Railway(NWR) as part of their ‘Tawi Branch Line’ [1].

The NWR ‘Tawi Branch Line’, was completed in 1890. The 26 miles(42km) from Wazirabad to Sialkot, had opened 1884. Extended by NWR in 1890 by 9 miles(14km) to the ‘Frontier of Kashmir State’ where the Jammu and Kashmir Railway continued the railway a further 16 miles(26km) to the ‘Left Bank of the Tawi River near Jammu[1]. The 25 mile(40km)section is in some records referred to as the Jammu-Sialkot Railway. The complete line from Wazirabad to Jammu, a total of 51 miles(82km) was part of the NWR network until partition when the line was severed. The section within Kasmir State becoming the Suchetgarh-Jammu Railway .

Records

An on-line search of the India Office Records (IOR) records held at the British Library relating to this railway [2] gives the following:-

  • R/2/1061/5; "File No.54 of 1888. Railway from Sialkot to Jammu"; 1888

Further Information

See North Western Railway

References