Difference between revisions of "Bombay-Ahmadabad BB&CIR Main Line"

From FIBIwiki
Jump to navigation Jump to search
(New page all checked)
 
(Mileage corrected, Internal links added)
 
Line 1: Line 1:
 
'''Bombay-Ahmadabad BB&CIR Main Line'''
 
'''Bombay-Ahmadabad BB&CIR Main Line'''
  
Broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line, first section opened 1860, completed 1865 linking  [[Bombay]] via [[Surat]] and [[Baroda]] to [[Ahmedabad]], 310 miles(496km);  with southerly suburban service extension reaching  Bombay Backbay(Colaba) in 1870 and a northerly extension in 1871 to [[Viramgam]], giving a total of 250 miles(560km). <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n22/mode/1up “Administration Report on Railways 1918” Page 13 (pdf 22) ]; Retrieved  4 Nov 2016</ref>  
+
Broad gauge([[Rail_gauge#Broad_Gauge|BG]]) line, first section opened 1860, completed 1865 linking  [[Bombay]] via [[Surat]] and [[Baroda]] to [[Ahmedabad]], 310 miles(496km);  with southerly suburban service extension reaching  [[Bombay Back Bay Reclamation Scheme Railway|Bombay Back Bay]] in 1870 and a northerly extension in 1871 to [[Viramgam]], giving a total of 350 miles(563km). <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n22/mode/1up “Administration Report on Railways 1918” Page 13 (pdf 22) ]; Retrieved  4 Nov 2016</ref>  
  
 
==Further Information==
 
==Further Information==

Latest revision as of 08:07, 16 June 2020

Bombay-Ahmadabad BB&CIR Main Line

Broad gauge(BG) line, first section opened 1860, completed 1865 linking Bombay via Surat and Baroda to Ahmedabad, 310 miles(496km); with southerly suburban service extension reaching Bombay Back Bay in 1870 and a northerly extension in 1871 to Viramgam, giving a total of 350 miles(563km). [1]

Further Information

See Bombay, Baroda & Central India Railway Network - Lines owned and worked

References