Difference between revisions of "Cawnpore-Barabanki Railway"

From FIBIwiki
Jump to navigation Jump to search
(Wikipedia Reference moved to External Links to confirm to specified format)
(Infobox added with minor edits)
 
Line 1: Line 1:
 +
{{Line Railways Infobox
 +
|image=
 +
|caption=
 +
|route= [[Cawnpore]] to [[Aishbagh]]<br> [[Daliganj]] to [[Barabanki]]
 +
|gauge1= Metre gauge<br>part Broad Gauge
 +
|gauge1details=  45 miles (1897)
 +
|gauge2=  Metre gauge
 +
|gauge2details= 18 miles (1896)
 +
|gauge3=
 +
|gauge3details=
 +
|gauge4=
 +
|gauge4details=
 +
|timeline1date= 1896
 +
|timeline1details=  [[Daliganj]] to [[Barabanki]] section opened
 +
|timeline2date=  1897
 +
|timeline2details=  [[Cawnpore]] to [[Aishbagh]] section opened
 +
|timeline3date=
 +
|timeline3details=
 +
|timeline4date=
 +
|timeline4details= 
 +
|timeline5date=
 +
|timeline5details= 
 +
|presidency= [[Bombay (Presidency)|Bombay]]
 +
|stations= [[Cawnpore]], [[Aishbagh]],  [[Daliganj]], [[Barabanki]]
 +
|system1date= 1896-7
 +
|system1details=  worked jointly by B&NWR and R&KR
 +
|system2date=
 +
|system2details=
 +
|system3date=
 +
|system3details= 
 +
}}
  
The '''Cawnpore-Barabanki Railway''' was owned by the Government of India([[Government of India |GoI]]) and managed as part of the [[East Indian Railway]](EIR), and was worked by the [[Bengal and North-Western Railway]](B&NWR) and the [[Rohilkund and Kumaon Railway]](R&KR) and their successors.  
+
The '''Cawnpore-Barabanki Railway''' was owned by the Government of India([[Government of India |GoI]]) and was worked by the [[Bengal and North-Western Railway]](B&NWR) and the [[Rohilkund and Kumaon Railway]](R&KR) and their successors.  
  
The Cawnpore-Barabanki Railway was essentially the common stem of the B&NWR and the R&KR networks. The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953.
+
The Cawnpore-Barabanki Railway was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway and essentially the common stem of the B&NWR and the R&KR networks.  
 
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf  "Indian Railway Line History" page 11 by Keith Scholey]; Retrieved 10 Dec 2015</ref>
 
<ref>[https://indianrailwaynotes.files.wordpress.com/2010/07/north-eastern-railway.pdf  "Indian Railway Line History" page 11 by Keith Scholey]; Retrieved 10 Dec 2015</ref>
  
 
There were two lines:
 
There were two lines:
 +
*Daliganj-Barabanki line, MG linking  [[Daliganj]] (R&KR) to [[Barabanki]] (B&NWR), a line of  18 miles(29km) opened 1896
 +
*Cawnpore-Aishbagh line, MG linking [[Cawnpore]] to [[Aishbagh]] (R&KR), a line of 45 miles(72km), opened 1897. Part of this section was originally named  the '''[[Cawnpore-Burhwal Railway]]''' (Metre Gauge Link), an existing branch of the O&RR to which a third rail was added, creating a short, mixed (BG and MG) gauge link
  
*Cawnpore-Aishbagh line (Metre gauge: 45 miles). Cawnpore (BBCI) to Aishbagh (R&KR) (45 miles) opened between 25 April and 15 May 1897. Part of this section was originally named  the '''[[Cawnpore-Burhwal Railway]]''' (Metre Gauge Link), an existing branch of the O&RR to which a third rail was added, creating a short, mixed-gauge link.
+
The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953.
 
 
*Daliganj-Barabanki line (Metre gauge: 18 miles).Daliganj (R&K) to Barabanki (BNW) (18 miles) opened 24 November 1896
 
  
 
==External Links==
 
==External Links==
*https://en.wikipedia.org/wiki/Cawnpore-Barabanki_Railway  "Cawnpore-Barabanki Railway"] Wikipedia
+
*[https://en.wikipedia.org/wiki/Cawnpore-Barabanki_Railway  "Cawnpore-Barabanki Railway"] Wikipedia  
  
 
== References ==
 
== References ==

Latest revision as of 10:42, 21 February 2016

Cawnpore-Barabanki Railway
[[Image:|150px| ]]
Line of route
Cawnpore to Aishbagh
Daliganj to Barabanki
Gauge / mileage
Metre gauge
part Broad Gauge
45 miles (1897)
Metre gauge 18 miles (1896)
Timeline
1896 Daliganj to Barabanki section opened
1897 Cawnpore to Aishbagh section opened
Key locations
Presidency Bombay
Stations Cawnpore, Aishbagh, Daliganj, Barabanki
System agency
1896-7 worked jointly by B&NWR and R&KR
How to interpret this infobox

The Cawnpore-Barabanki Railway was owned by the Government of India(GoI) and was worked by the Bengal and North-Western Railway(B&NWR) and the Rohilkund and Kumaon Railway(R&KR) and their successors.

The Cawnpore-Barabanki Railway was a metre gauge(MG) railway and essentially the common stem of the B&NWR and the R&KR networks. [1]

There were two lines:

  • Daliganj-Barabanki line, MG linking Daliganj (R&KR) to Barabanki (B&NWR), a line of 18 miles(29km) opened 1896
  • Cawnpore-Aishbagh line, MG linking Cawnpore to Aishbagh (R&KR), a line of 45 miles(72km), opened 1897. Part of this section was originally named the Cawnpore-Burhwal Railway (Metre Gauge Link), an existing branch of the O&RR to which a third rail was added, creating a short, mixed (BG and MG) gauge link

The Cawnpore-Barabanki Railway was transferred to the North Eastern Railway on 27 February 1953.

External Links

References