Difference between revisions of "Gauhati Branch Railway"

From FIBIwiki
Jump to navigation Jump to search
(Persons added with links)
(Further Information: link changed EBR - Lines owned and worked)
Line 7: Line 7:
 
This  Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) line was opened in 1906 and  extended to reach [[Armingoan]] by 1909; where it linked to EBR’s [[Amingaon-Pandu Train Ferry]]; crossing the Brahmaputra River to the [[Pandu Ghat-Gauhati Railway]] connecting to [[Assam-Bengal Railway]](ABR) at Gauhati.  
 
This  Metre Gauge([[Rail_gauge_#Metre_Gauge|MG]]) line was opened in 1906 and  extended to reach [[Armingoan]] by 1909; where it linked to EBR’s [[Amingaon-Pandu Train Ferry]]; crossing the Brahmaputra River to the [[Pandu Ghat-Gauhati Railway]] connecting to [[Assam-Bengal Railway]](ABR) at Gauhati.  
 
   
 
   
 +
==Further Information==
 +
See '''[[Eastern Bengal Railway - Lines owned and worked]]'''
 +
 
== References ==
 
== References ==
 
<references />
 
<references />
 
==Further Information==
 
See '''[[Eastern Bengal Railway]]'''
 
  
 
[[Category:Railways]]
 
[[Category:Railways]]
 
[[Category:State Railways]]
 
[[Category:State Railways]]

Revision as of 16:46, 4 February 2019

Gauhati Branch Railway

Part of Assam Section of Eastern Bengal Railway(EBR) incorporating part of Kaunia Dharle Railway connecting Golakganj with Gauhati, a distance of 147 miles (235km).

Joseph Elston from the Public Works Department was the Engineer-in-Chief for the Survey in 1898 [1].

This Metre Gauge(MG) line was opened in 1906 and extended to reach Armingoan by 1909; where it linked to EBR’s Amingaon-Pandu Train Ferry; crossing the Brahmaputra River to the Pandu Ghat-Gauhati Railway connecting to Assam-Bengal Railway(ABR) at Gauhati.

Further Information

See Eastern Bengal Railway - Lines owned and worked

References