Neemuch Nasirabad State Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
m Link added and minor edit
PEA-2292 (talk | contribs)
mNo edit summary
Line 4: Line 4:
*[[Rajputana State Railway]] (RSR)
*[[Rajputana State Railway]] (RSR)
*[[Holkar State Railway]], which had opened  1874 from Khandwa reaching  Indore, 1876.
*[[Holkar State Railway]], which had opened  1874 from Khandwa reaching  Indore, 1876.
*[[Scindia-Nimach State Railway]] from Indore to Nimach, including a branch line from Indore to Ujjain opened in August 1876 . The entire line was completed in 1879-80
*[[Scindia-Neemuch Railway]] from Indore to Nimach, including a branch line from Indore to Ujjain opened in August 1876 . The entire line was completed in 1879-80
*'''Neemuch Nasirabad State Railway'''
*'''Neemuch Nasirabad State Railway'''
*[[Western Rajputana State Railway]], known to have existed but no information found.
*[[Western Rajputana State Railway]], known to have existed but no information found.

Revision as of 10:02, 21 November 2015

In 1881-82, the Rajputana-Malwa State Railway (RMSR) was created amalgamating, under single management, existing State Railways:-

All these railways were worked by Bombay, Baroda and Central India Railway(BB&CIR) State Railways; all worked by BB&CIR.

In 1900 the RMSR was merged into the Bombay, Baroda and Central India Railway(BB&CIR), becoming the latter's Metre Gauge(MG) section; known as Ratlam Division of BB&CIR..