Porbandar State Railway: Difference between revisions
Full revision with Map |
mNo edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 40: | Line 40: | ||
==History== | ==History== | ||
* 1886. The British Administrator , Mr Lely, in charge of Porbandar State proposed to build a Railway from Porbandar to Dhoraji via Kandorna and Kutiana and started the survey but the Durbar decided that although they had the capital, they would not spend it on the project. The Indian Government seeing the need for the railway to open up the State went to the Thakor of Gondal to raise support, and various meetings were held between the Agent and the Thakor of Gondal regarding the route. The Thakor was not happy at the proposed route through Bhayawadar to Jamjodhpur. This after a survey and costing by Mr. Shadbolt proved to be the better route <ref name=IOR257>British Library IOR/L/PS/10/257 File 1073/ ‘Porbandar Railway 1912-14’ Annexure XII</ref>. | * 1886. The British Administrator , Mr Lely, in charge of Porbandar State proposed to build a Railway from Porbandar to Dhoraji via Kandorna and Kutiana and started the survey but the Durbar decided that although they had the capital, they would not spend it on the project. The Indian Government seeing the need for the railway to open up the State went to the Thakor of Gondal to raise support, and various meetings were held between the Agent and the Thakor of Gondal regarding the route. The Thakor was not happy at the proposed route through Bhayawadar to Jamjodhpur. This after a survey and costing by Mr. Shadbolt proved to be the better route <ref name=IOR257>British Library IOR/L/PS/10/257 File 1073/ ‘Porbandar Railway 1912-14’ Annexure XII</ref>. | ||
* 1887. An Agreement to construct the railway was signed between the States so that construction could start after the monsoon season in September although Gondal said it could only build the section in its own territory and Porbandar had only Rs 9,000 spare to build the railway. Gondal initially paid Rs 10 Lacs but was also to add at reasonable intervals up to 50% of the cost of the line. This also made [[Porbandar State]] a partner in ‘[[Bhavnagar-Gondal-Junagadh- | * 1887. An Agreement to construct the railway was signed between the States so that construction could start after the monsoon season in September although Gondal said it could only build the section in its own territory and Porbandar had only Rs 9,000 spare to build the railway. Gondal initially paid Rs 10 Lacs but was also to add at reasonable intervals up to 50% of the cost of the line. This also made [[Porbandar State]] a partner in ‘[[Bhavnagar-Gondal-Junagadh-Veraval-Railway]]’ being the final State to join the operational union<ref name=IOR257/>. This coalition became the ‘[[Bhavnagar-Gondal-Junagad-Porbandar Railway’]]’, | ||
==PSR Railway System== | ==PSR Railway System== | ||
Line 46: | Line 46: | ||
<blockquote>From [[Porbandar]] the line connected to the ‘[[Gondal Railway|Gondal State Railway]]’ </blockquote> | <blockquote>From [[Porbandar]] the line connected to the ‘[[Gondal Railway|Gondal State Railway]]’ </blockquote> | ||
* ‘Quarry Branch’ was a short branch opened 1889, 3.7 miles(6km) <ref name=Admin/> | * ‘Quarry Branch’ was a short branch opened 1889, 3.7 miles(6km) <ref name=Admin/> | ||
<blockquote> The branch ran from Ranavav, about 20km east of Porabandar to a quarry</blockquote> | <blockquote> The branch ran from [[Ranavav]], about 20km east of Porabandar to a quarry</blockquote> | ||
* ‘Porbadar Harbour Extension’, opened 1890, 3.7 miles(6km) <ref name=Admin/> | * ‘Porbadar Harbour Extension’, opened 1890, 3.7 miles(6km) <ref name=Admin/> | ||
<blockquote> [[Porbandar]] to Porbander Bandar </blockquote> | <blockquote> [[Porbandar]] to Porbander Bandar </blockquote> |
Latest revision as of 16:30, 15 May 2020
Porbandar State Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Jamjodhpur to Porbandar | ||
Gauge / mileage | ||
Metre gauge | 41 miles (1922) | |
Timeline | ||
1888 | Opened to traffic | |
Key locations | ||
Presidency | Bombay | |
Stations | Jamjodhpur, Porbandar | |
System agency | ||
1888 | Bhavnagar-Gondal-Junagad-Porbandar Railway | |
1919 | Gondal Railways | |
How to interpret this infobox |
The Porbandar State Railway (PSR) was a metre gauge line owned by the Princely Porbandar State and intially worked by the Bhavnagar-Gondal-Junagad-Porbandar Railway(BGJPR).
From 1911 until 1919 it was worked jointly with Gondal State thus forming the Gondal-Porbandar Railway
From 1919 it was worked by Gondal Railways(GSR) until 1948 when it became part of the newly formed Saurashtra Railway.
History
- 1886. The British Administrator , Mr Lely, in charge of Porbandar State proposed to build a Railway from Porbandar to Dhoraji via Kandorna and Kutiana and started the survey but the Durbar decided that although they had the capital, they would not spend it on the project. The Indian Government seeing the need for the railway to open up the State went to the Thakor of Gondal to raise support, and various meetings were held between the Agent and the Thakor of Gondal regarding the route. The Thakor was not happy at the proposed route through Bhayawadar to Jamjodhpur. This after a survey and costing by Mr. Shadbolt proved to be the better route [1].
- 1887. An Agreement to construct the railway was signed between the States so that construction could start after the monsoon season in September although Gondal said it could only build the section in its own territory and Porbandar had only Rs 9,000 spare to build the railway. Gondal initially paid Rs 10 Lacs but was also to add at reasonable intervals up to 50% of the cost of the line. This also made Porbandar State a partner in ‘Bhavnagar-Gondal-Junagadh-Veraval-Railway’ being the final State to join the operational union[1]. This coalition became the ‘Bhavnagar-Gondal-Junagad-Porbandar Railway’’,
PSR Railway System
- ‘Mainline’ Porbandar to Jamjodhpur, opened 1889, 41 miles(66km)[2] .
From Porbandar the line connected to the ‘Gondal State Railway’
- ‘Quarry Branch’ was a short branch opened 1889, 3.7 miles(6km) [2]
The branch ran from Ranavav, about 20km east of Porabandar to a quarry
- ‘Porbadar Harbour Extension’, opened 1890, 3.7 miles(6km) [2]
Porbandar to Porbander Bandar
Records
An on-line search of the India Office Records (IOR) records held at the British Library relating to this railway [3] gives the following:-
- L/PS/10/257; “ File 1073/1912 Railways: Native States; Gondal-Porbandar State Railway”; 1912-19
- R/2/635/288 ; “File 1933 C/589-A Gondal-Porbandar-Grant of running powers to thePorbandar State railway over the Gondal Rly.”; 1933
Further Information
See Bhavnagar-Gondal-Junagad-Porbandar Railway up to 1911
See Gondal-Porbandar Railway from 1911 onward
And Kathiawar Peninsula Railway and Tramway Systems gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.
References
- ↑ 1.0 1.1 British Library IOR/L/PS/10/257 File 1073/ ‘Porbandar Railway 1912-14’ Annexure XII
- ↑ 2.0 2.1 2.2 “Administration Report on Railways 1918” page 181 (pdf190); Retrieved 11 May 2020
- ↑ “British Library Archives and Manuscripts Catalogue” - Search; Retrieved 11 Apr 2016