Birur-Shimoga Railway: Difference between revisions
Jump to navigation
Jump to search
1918 Admin Report details checked/added/corrected |
Text changes |
||
Line 31: | Line 31: | ||
}} | }} | ||
The '''Birur-Shimoga Railway''' was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) branch line in the Indian State of Mysore, it was worked by Madras and Southern Mahratta Railway(M&SMR). | The '''Birur-Shimoga Railway''' was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) branch line in the Indian State of Mysore, it was worked by [[Southern Mahratta Railway]](SMR) which became [[Madras and Southern Mahratta Railway]](M&SMR). | ||
<ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 88]; Retrieved 17 Dec 2015</ref> | <ref>[https://ia801009.us.archive.org/8/items/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System.pdf " Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 88]; Retrieved 17 Dec 2015</ref> | ||
Revision as of 16:40, 3 January 2016
Birur-Shimoga Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Birur to Shimoga | ||
Gauge / mileage | ||
Metre gauge | 38 miles (1905) | |
Timeline | ||
1899 | Opened to traffic | |
1919 | Reverted to Mysore State control | |
1934 | Extended to Anandapuram | |
1938 | Extended to Sagara | |
1940 | Extended to Talaguppe | |
Key locations | ||
Presidency | Madras | |
Stations | Birur, Shimoga | |
System agency | ||
1899 | Worked by Southern Mahratta Railway | |
1907 | Madras and Southern Mahratta Railway | |
1919 | Mysore State Railway | |
How to interpret this infobox |
The Birur-Shimoga Railway was a metre gauge(MG) branch line in the Indian State of Mysore, it was worked by Southern Mahratta Railway(SMR) which became Madras and Southern Mahratta Railway(M&SMR). [1]
In 1919, the Mysore State succesfully sought the reversion of the Mysore to Bangalore section and two branch lines, the Birur-Shimoga and the Mysore-Nanjangud Railway beacame Mysore State Railway.