User:PEA-2292/My sandbox: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
No edit summary
PEA-2292 (talk | contribs)
No edit summary
Line 22: Line 22:
|timeline5details=   
|timeline5details=   
|presidency= [[Bombay]]
|presidency= [[Bombay]]
|stations= [[Jetalsar]], [[Juniagarh]], [[Kutiyana]], [[Veraval]]
|stations= [[Jetalsar]], [[Junagadh]], [[Kutiyana]], [[Veraval]]
|system1date= 1888
|system1date= 1888
|system1details= [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
|system1details= [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
Line 31: Line 31:
}}
}}


The '''Junagadh State Railway''' (JunSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned by the [[Princely states|Princely ]][[Junagadh State]] and intially worked by the [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
The '''Junagadh State Railway''' (JunSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned by the [[Princely states|Princely ]][[Junagadh State]] and intially worked by the [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved 7 Feb 2016</ref>
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved 7 Feb 2016</ref>


In 1869 a survey was undertaken and the [[Kathiawar_Peninsula_Railway_and_Tramway_Systems#Timeline_1863-1900 |’Junagadh-Verval Railway Proposal ‘]]  concluded  that a Railway line from [[Junagadh]] to [[Verval]]  was feasible  but the cost of 40 to 50 Lakhs of Rupees was too high for the Junagadh Durbar to go ahead. Proposals for a light railway system were to be looked at.  <ref> British Library ‘India Office Records’ V/10/1384 “Indian States Administration Reports. Kathiawar” 1865-75, No 134 of 1869 </ref>.
In 1869 a survey was undertaken and the [[Kathiawar_Peninsula_Railway_and_Tramway_Systems#Timeline_1863-1900 |’Junagadh-Veraval Railway Proposal ‘]]  concluded  that a Railway line from [[Junagadh]] to [[Veraval]]  was feasible  but the cost of 40 to 50 Lakhs of Rupees was too high for the Junagadh Durbar to go ahead. Proposals for a light railway system were to be looked at.  <ref> British Library ‘India Office Records’ V/10/1384 “Indian States Administration Reports. Kathiawar” 1865-75, No 134 of 1869 </ref>.


In 1872 another line was proposed and the  [[Kathiawar_Peninsula_Railway_and_Tramway_Systems#Timeline_1863-1900|route from Veraval] to Junagadh and Dhoraji]]  was surveyed by Mr A W Forde C E, but the cost was beyond the means of Junagadh Durbar. This proposal came to nothing
In 1872 another line was proposed and the  [[Kathiawar_Peninsula_Railway_and_Tramway_Systems#Timeline_1863-1900|route from Veraval to Junagadh and Dhoraji]]  was surveyed by Mr A W Forde C E, but the cost was beyond the means of Junagadh Durbar. This proposal came to nothing  <ref name=Bombay8_247>[https://archive.org/stream/1884GazetteerByBombayPresidencyVol8Kathiawar349D/1884-gazetteerByBombayPresidency-vol8-kathiawar349-d_djvu.txtArchive.org “Gazetteer – Bombay Presidency” Vol.8; page 247-248 of 756]; Retrieved 1 Oct 2017</ref>.
  <ref name=Bombay8_247>[https://archive.org/stream/1884GazetteerByBombayPresidencyVol8Kathiawar349D/1884-gazetteerByBombayPresidency-vol8-kathiawar349-d_djvu.txtArchive.org “Gazetteer – Bombay Presidency” Vol.8; page 247-248 of 756]; Retrieved 1 Oct 2017</ref>.
Construction finally commenced in 1886 from [[Jetalsar]] to [[Junagadh|Junagadh City]] in 1888 and onward To [[Veraval]] 1889, and initially described as the '''Junadagh-Veraval Railway'''.
 
.................


[[File:Junagadh State Railway.png|thumb|Junagadh State Railway]]
[[File:Junagadh State Railway.png|thumb|Junagadh State Railway]]
*The first section from [[Jetalasar]] to [[Junagadh]] opened in 1888 and extended to [[Vereval|Veraval Docks]] in 1889, a total of 67 miles(108km)  and initially described as the '''Junadagh-Verval Railway'''  <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved  23 Jun 2019</ref>.  [[Jetalasar |Jetalasar Junction]] was a connection  to the ‘[[Gondal Railway]] - Mainline’ [[Dhasa]] to [[Jamjodhpur]].
**''Line ‘A’ on map '' 
==Administation==
==Administation==
*1888-89: With the opening of the ‘Junagadh State Railway’(JunSR ) from  [[Junagadh]]  via [[Jetalsar]]  to [[Verval]] the railway joined the administrative coalition of the '[[Bhavnagar-Gondal State Railway]]’.  The coalition briefly became the '[[Bhavnagar-Gondal-Junagad-Verval Railway]]'(BGJPV)  
*1888-89: With the opening of the ‘Junagadh State Railway’(JunSR ) from  [[Junagadh]]  via [[Jetalsar]]  to [[Veraval]] the railway joined the administrative coalition of the '[[Bhavnagar-Gondal State Railway]]’.  <br>The coalition briefly became the '[[Bhavnagar-Gondal-Junagad-Veraval Railway]]'(BGJPV)  
*1889: When the ‘[[Porbandar State Railway]]’ extension from [[Dhasa ]] reached [[Porbandar]]  the coalition finally became the [[Bhavnagar-Gondal-Junagad-Porbandar Railway|(BGJPR) ''- see separate page for further information'']].
*1889: When the ‘[[Porbandar State Railway]]’ extension from [[Dhasa ]] reached [[Porbandar]]  the coalition finally became the [[Bhavnagar-Gondal-Junagad-Porbandar Railway| '''Bhavnagar-Gondal-Junagad-Porbandar Railway'''(BGJPR) ''- see separate page for further information'']].
<Blockquote>This BGJPR coalition was also described in some records as the '''Kathiawar Railway''', the '''Kathiawar Union Railway''' and the '''Kathiawar State Railway'''. </Blockquote>
<Blockquote>This BGJPR coalition was also described in some records as the '''Kathiawar Railway''', the '''Kathiawar Union Railway''' and the '''Kathiawar State Railway'''. </Blockquote>
* 1911: The BGJPR coalition ceased to exist on 1 April 1911, from this date the line was worked independently as a separate and distinct railway <ref name=Admin/>.  
* 1911: The BGJPR coalition ceased to exist on 1 April 1911, from this date the line was worked independently as a separate and distinct railway <ref name=Admin/>.  
Line 56: Line 49:


==Development of the JunSR==
==Development of the JunSR==
*The first section from [[Jetalsar]] to [[Junagadh]] opened in 1888 and extended to [[Veraval|Veraval Docks]] in 1889, a total of 67 miles(108km)  and initially described as the '''Junadagh-Veraval Railway'''  <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved  23 Jun 2019</ref>.  At [[Jetalsar |Jetalasar Junction]] there was a connection  to the ‘[[Gondal Railway]] - Mainline’ [[Dhasa]] to [[Jamjodhpur]].
**''Line ‘A’ on map '' 
*1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km)  south-west of Junagadh,  to Saradiya <ref name=Admin/> (shown as Juniagarh  to  Kutiyana on 1931 Railways Map )  
*1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km)  south-west of Junagadh,  to Saradiya <ref name=Admin/> (shown as Juniagarh  to  Kutiyana on 1931 Railways Map )  
**''Line ‘B’ on map ''   
**''Line ‘B’ on map ''   
Line 62: Line 57:
*1912: ‘Dungarpur Quarry Line’, ¾ mile(1.2km); a short spur from the ‘Visavadar Branch’, 2 miles (3.2km)south-east of Junagarh <ref name=Admin/> .  
*1912: ‘Dungarpur Quarry Line’, ¾ mile(1.2km); a short spur from the ‘Visavadar Branch’, 2 miles (3.2km)south-east of Junagarh <ref name=Admin/> .  
**''Line ‘D’ on map ''   
**''Line ‘D’ on map ''   
* 1918-23: ‘[[Veraval-Prachi Road Branch]]’, 28 miles(45km); from[[Verval]], proposed as far as [[Una]], delayed start, opened in stages from 1918, reached Prachi Road 1923  
* 1918-23: ‘[[Veraval-Prachi Road Branch]]’, 28 miles(45km); from[[Veraval]], proposed as far as [[Una]], delayed start, opened in stages from 1918, reached Prachi Road 1923  
<ref name=page193>[https://ia801602.us.archive.org/6/items/in.ernet.dli.2015.96301/2015.96301.Kathiawar-Economics.pdf 1943 ‘Kathiawar Economics’ by A  B Trivedi, 1943 Digital Library of India Archive.org,  Appendix B ‘Railways in Kathiawar with opening dates, pages 193(pdf217)]<ref/>.  ‘[Veraval-Prachi Road Branch|''- See separate page for further information'']].  
<ref name=page193>[https://ia801602.us.archive.org/6/items/in.ernet.dli.2015.96301/2015.96301.Kathiawar-Economics.pdf 1943 ‘Kathiawar Economics’ by A  B Trivedi, 1943 Digital Library of India Archive.org,  Appendix B ‘Railways in Kathiawar with opening dates, pages 193(pdf217)]<ref/>.  ‘[Veraval-Prachi Road Branch|''- See separate page for further information'']].  
**''Line ‘E’ on map ''   
**''Line ‘E’ on map ''   

Revision as of 16:19, 13 May 2020

PEA-2292/My sandbox
[[Image:|150px| ]]
Line of route
Jetalsar to Veraval
Gauge / mileage
Metre gauge 140 miles (1922)
229 miles (1944)
Timeline
1888 First section opened to traffic
Key locations
Presidency Bombay
Stations Jetalsar, Junagadh, Kutiyana, Veraval
System agency
1888 Bhavnagar-Gondal-Junagad-Porbandar Railway
1911 Own agency
How to interpret this infobox

The Junagadh State Railway (JunSR) was a metre gauge(MG) railway owned by the Princely Junagadh State and intially worked by the ‘Bhavnagar-Gondal-Junagad-Porbandar Railway[1]

In 1869 a survey was undertaken and the ’Junagadh-Veraval Railway Proposal ‘ concluded that a Railway line from Junagadh to Veraval was feasible but the cost of 40 to 50 Lakhs of Rupees was too high for the Junagadh Durbar to go ahead. Proposals for a light railway system were to be looked at. [2].

In 1872 another line was proposed and the route from Veraval to Junagadh and Dhoraji was surveyed by Mr A W Forde C E, but the cost was beyond the means of Junagadh Durbar. This proposal came to nothing [3]. Construction finally commenced in 1886 from Jetalsar to Junagadh City in 1888 and onward To Veraval 1889, and initially described as the Junadagh-Veraval Railway.

File:Junagadh State Railway.png
Junagadh State Railway

Administation

This BGJPR coalition was also described in some records as the Kathiawar Railway, the Kathiawar Union Railway and the Kathiawar State Railway.

  • 1911: The BGJPR coalition ceased to exist on 1 April 1911, from this date the line was worked independently as a separate and distinct railway [4].
  • 1911-1934: The operation of the ‘Jetalsar-Rajkot Railway’ caused serious financial and commercial disadvantages to the JunSr, resulting in acrimonious exchanges over many years - see separate page for further information.
  • 1935: The ‘Junagadh State Railway’ put forward a proposal to take over the management of the ‘Jetalsar-Rajkot Railway’ which since 1911 had been operated by the ‘[Gondal-Porabandar Railway]’ [5]. There is no evidence that this proposal was accepted.
  • 1948: The ‘Junagadh State Railway’ became part of the ‘Saurashtra Railway’.

Development of the JunSR

  • The first section from Jetalsar to Junagadh opened in 1888 and extended to Veraval Docks in 1889, a total of 67 miles(108km) and initially described as the Junadagh-Veraval Railway [4]. At Jetalasar Junction there was a connection to the ‘Gondal Railway - Mainline’ Dhasa to Jamjodhpur.
    • Line ‘A’ on map
  • 1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km) south-west of Junagadh, to Saradiya [4] (shown as Juniagarh to Kutiyana on 1931 Railways Map )
    • Line ‘B’ on map
  • 1912: ‘Visavadar Branch’, 26 miles(km); from Junagadh to Visavadar [4] .
    • Line ‘C’ on map
  • 1912: ‘Dungarpur Quarry Line’, ¾ mile(1.2km); a short spur from the ‘Visavadar Branch’, 2 miles (3.2km)south-east of Junagarh [4] .
    • Line ‘D’ on map
  • 1918-23: ‘Veraval-Prachi Road Branch’, 28 miles(45km); fromVeraval, proposed as far as Una, delayed start, opened in stages from 1918, reached Prachi Road 1923

Cite error: Closing </ref> missing for <ref> tag gives the following:-

  • R/1/1/4784(1) and (2); "File 110-IB(C)/1935 Proposed taking over of management of the Jetalsar-Rajkot Railway by the Junagadh State Railway from the Gondal Railway"; 1935

Further Information

See Bhavnagar-Gondal-Junagad-Porbandar Railway for period from 1899 to 1911. and Kathiawar Peninsula Railway and Tramway Systems gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.

References

  1. "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 193; Retrieved 7 Feb 2016
  2. British Library ‘India Office Records’ V/10/1384 “Indian States Administration Reports. Kathiawar” 1865-75, No 134 of 1869
  3. “Gazetteer – Bombay Presidency” Vol.8; page 247-248 of 756; Retrieved 1 Oct 2017
  4. 4.0 4.1 4.2 4.3 4.4 "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 193; Retrieved 23 Jun 2019
  5. British Library IOR/R/1/1/4784(1) and (2); "File 110-IB(C)/1935 Proposed taking over of management of the Jetalsar-Rajkot Railway by the Junagadh State Railway from the Gondal Railway"; 1935