Jamnagar and Dwarka Railway: Difference between revisions
'Kathiawar Peninsula Railway and Tramway Systems' page link added under 'Further Information' |
Map added, linternal inks corrected |
||
Line 1: | Line 1: | ||
[[File: Jamnagar and Dwarka Railway.png|thumb| Jamnagar and Dwarka Railway]] | |||
{{Line Railways Infobox | {{Line Railways Infobox | ||
|image= | |image= | ||
Line 22: | Line 23: | ||
|timeline5details= | |timeline5details= | ||
|presidency= [[Bombay]] | |presidency= [[Bombay]] | ||
|stations= [[ | |stations= [[Rajkot]], [[Jamnagar]], [[Dwarka]], Port Okha, | ||
|system1date= 1897 | |system1date= 1897 | ||
|system1details= [[Bhavnagar-Gondal-Junagad-Porbandar Railway]] | |system1details= [[Bhavnagar-Gondal-Junagad-Porbandar Railway]] | ||
Line 37: | Line 38: | ||
<ref>[https://archive.org/stream/monographonindia00ghos/monographonindia00ghos_djvu.txt "A monograph on Indian railway rates" by S.C.Ghose 1918]; Retrieved 12 Dec 2015</ref> | <ref>[https://archive.org/stream/monographonindia00ghos/monographonindia00ghos_djvu.txt "A monograph on Indian railway rates" by S.C.Ghose 1918]; Retrieved 12 Dec 2015</ref> | ||
The line was worked as part of the [[Bhavnagar-Gondal-Junagad-Porbandar Railway]] system until 1911. Later, when the line was extended westwards to [[Dwarka]] and | The line was worked as part of the [[Bhavnagar-Gondal-Junagad-Porbandar Railway]] system until 1911. Later, when the line was extended westwards to [[Dwarka]] and Port Okha]on the [[Gulf of Cutch]], the system was renamed the '''Jamnagar and Dwarka Railway'''(J&DR). | ||
The [[Okhamandal State Railway]] section [[Kuranga-Okha Railway]] was opened, 1921 and worked by J&DR in 1922 | The [[Okhamandal State Railway]] section [[Kuranga-Okha Railway]] was opened, 1921 and worked by J&DR in 1922 |
Revision as of 15:25, 14 June 2019
Jamnagar and Dwarka Railway | ||
---|---|---|
[[Image:|150px| ]] | ||
Line of route | ||
Rajkot to Port Okha | ||
Gauge / mileage | ||
Metre gauge | 54 miles (1905) 202 miles (1942) | |
Timeline | ||
1897 | Section to Jamnagar opened | |
Key locations | ||
Presidency | Bombay | |
Stations | Rajkot, Jamnagar, Dwarka, Port Okha, | |
System agency | ||
1897 | Bhavnagar-Gondal-Junagad-Porbandar Railway | |
1911 | Own agency | |
How to interpret this infobox |
Jamnagar and Dwarka Railway(J&DR)
The first section of what was then called the Jamnagar State Railway connected Jamnagar to the Bhavnagar-Gondal-Junagad-Porbandar Railway at Rajkot. The metre gauge(MG)with a length of 54 miles (86km) opened for traffic in 1897. [1] [2]
The line was worked as part of the Bhavnagar-Gondal-Junagad-Porbandar Railway system until 1911. Later, when the line was extended westwards to Dwarka and Port Okha]on the Gulf of Cutch, the system was renamed the Jamnagar and Dwarka Railway(J&DR).
The Okhamandal State Railway section Kuranga-Okha Railway was opened, 1921 and worked by J&DR in 1922
In 1948 the J&DR was merged to form the Saurashtra Railway
Further Information
Kathiawar Peninsula Railway and Tramway Systems gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.