Difference between revisions of "Nilgiri Mountain Railway"

From FIBIwiki
Jump to navigation Jump to search
(Content & image added)
m (Internal link corrected)
Line 42: Line 42:
 
In 1899 the first section, from [[Mettupalaiyam]] to [[Coonoor]] (including 12 miles of rack), was opened to working by the [[Madras Railway]]. In 1903 the GoI purchased the line and contracted its working to the [[Madras Railway]].
 
In 1899 the first section, from [[Mettupalaiyam]] to [[Coonoor]] (including 12 miles of rack), was opened to working by the [[Madras Railway]]. In 1903 the GoI purchased the line and contracted its working to the [[Madras Railway]].
  
When the [[Madras Railway]] was merged into the [[South Mahratta Railway]] in 1907, the NMR contract was awarded to the [[South Indian Railway]]. Construction of the extension from [[Coonoor]] to [[Ootacamund]] was completed by the GoI [[Public Works Department]] in 1908.
+
When the [[Madras Railway]] was merged into the [[Madras and Southern Mahratta Railway]] in 1907, the NMR contract was awarded to the [[South Indian Railway]]. Construction of the extension from [[Coonoor]] to [[Ootacamund]] was completed by the GoI [[Public Works Department]] in 1908.
  
 
In due course, the NMR became part of '''Southern Railway''', a zone of Indian Railways.
 
In due course, the NMR became part of '''Southern Railway''', a zone of Indian Railways.

Revision as of 21:18, 11 January 2009

Nilgiri Mountain Railway
The Nilgiri Mountain Railway.jpg
Line of route
Mettupalaiyam to Ootacamund
Gauge / mileage
Metre gauge 17 miles (1905)
29 miles (1908)
Timeline
Key locations
Presidency Madras
Stations Mettupalaiyam, Coonoor, Ootacamund
System agency
1899-1907 Madras Railway
1908 South Indian Railway
1951 Southern Railway (IR zone)
How to interpret this infobox

A metre gauge rack railway that is today a tourist attraction and a UNESCO World Heritage Site.


History

Following the opening of the Madras Railway broad gauge line from Madras to Calicut in 1862, a 26 mile, broad gauge branch from Podanur to Mettupalaiyam was opened to traffic in 1873 and plans discussed to extend this into the Nilgiri hills - the "Blue Mountains".

In 1885, the Nilgiri Railway Company was formed with construction beginning in 1891. Initially, it was intended to adopt the Rigi rack system but eventually the Abt rack system was chosen. In 1896, a new company was formed with a guarantee (3% return during the construction period) from the Government of India (GoI) following the failure of the 1885 company.

In 1899 the first section, from Mettupalaiyam to Coonoor (including 12 miles of rack), was opened to working by the Madras Railway. In 1903 the GoI purchased the line and contracted its working to the Madras Railway.

When the Madras Railway was merged into the Madras and Southern Mahratta Railway in 1907, the NMR contract was awarded to the South Indian Railway. Construction of the extension from Coonoor to Ootacamund was completed by the GoI Public Works Department in 1908.

In due course, the NMR became part of Southern Railway, a zone of Indian Railways.


External links

"The Nilgiris" Love to know 1911.

"Nilgiris District" Wikipedia.

"Nilgiri Mountain Railway" Wikipedia.

"Heritage Site" The Nilgiris - District of Blue Mountains.

"Rack railway" Wikipedia.