A metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway in the extreme north-east corner of India. Owned by [[Assam Railways and Trading Company]](AR&TC) | '''Dibru-Sadiya Railway''' | ||
A metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway in the extreme north-east corner of India. Owned by ‘[[Assam Railways and Trading Company]]’(AR&TC). Opened in stages from 1882 to a total of 86 miles(140km) by 1910. | |||
[[File:Assam Railways and Trading Company, Railway Map 1909.png|thumb|Dibru-Sadiya Railway']] | |||
The [[Makum | ==Railway Development== | ||
<ref name= | The first section of the line opened in 1882 from Brahmaputra River Steamer Ghat near [[Dibrugarh]] eastward, 15 miles(24km); extended to [[Makum| Makum Junction]] in 1883, a further 23½ miles(38km). Reaching [[Talap]] in 1885 giving a total 54½ miles(88km) )<ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n187/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 178]; Retrieved 1 Jun 2020</ref> | ||
'''[[Makum Branch Railway]]''', 23 miles(37km), opened in 1884 as a branch from [[Makum|Makum Junction]] to Dihing Bridge<ref name=Admin/> | |||
'''[[Ledo and Tikak Margherita Colliery Railway]]''', 5½ miles(9km),opened 1884, linked to the ‘Dibru-Sadiya Railway’ at Dihing Bridge; also owned by the [[Assam Railways and Trading Company]](AR&TC) h owever this railway was [[Ledo and Tikak Margherita Colliery Railway|classified independently - ''see separate page'']]and the working was taken over by the ‘Dibru-Sadiya Railway’ in 1897<ref name=Admin/>. | |||
In 1903 a connection was created with the opening of the terminus at [[Tinsukia]] of the metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) [[Assam-Bengal_Railway#ABR_Initial_Line_and_Branches|‘Assam-Bengal Railway Mainline’]], thus giving a direct line to [[Chittagong|Chittagong Port]]. | |||
'''[[Saikhoa Extension Railway]]''' , 8½ miles(14km), from [[Talap]] was a further extension in 1910 to reach Saikhoa Ghat. Thus giving a total line length of 86 miles(140km) including the [[Makum Branch Railway|‘Makum Branch’]] <ref name=Admin/>. | |||
In 1942 the working was taken over by the [[Bengal and Assam Railway]] for the duration of the war (WW2) and the railway was nationalised in 1945. | In 1942 the working was taken over by the [[Bengal and Assam Railway]] for the duration of the war (WW2) and the railway was nationalised in 1945. | ||
==Origins and Background== | |||
The following based on the auto-biography of Charles Folliott Birney, Chairman ‘[[Assam Railways and Trading Company |Assam Railways and Trading Company Limited <ref>[https://ia902905.us.archive.org/12/items/dli.csl.8148/8148.pdf ‘The Story of the Assam Railways and Trading Company Limited’ 1881-1951 by Charles Folliott Birney, Chairman. ‘Dibru-Sadiya Railway’ Chapter III, page 15-25 pdf 24-37]; Retrieved 31 June 2020</ref>. | |||
'''1881''': Robert Piercy and three Italian engineers, the Chevalier brothers , arrived in Calcutta and made their way to Dibrugarh . Benjamin Piercy, who as consulting engineer, remained in England and advised that:- | |||
<br>“In fixing the line between the River Dehing and the coal measures will be the simplest and least costly , and to bear in mind the petroleum concession is likely to pass into the hands of our Company. Robert Piercy will make Dibrugarh his headquarters and direct operations at that end. Mr Roberto Paganini will establish quarters for himself and assistants in the forests on the banks of the Dehing and direct operations at Makum or Naga.” | |||
<br>Several weeks were spent in surveying the line from the Steamer Ghat to the town of Dibrugarh. Possession had to be obtained of the required land and a labour force had to be enlisted. | |||
'''1882''': As a result it was not possible to begin construction until January 1882, when a considerable period of the working season had expired. Soon however the first consignment of rails, locomotives, etc shipped from the United Kingdom arrived at Dibrugarh. They had been brought a thousand miles up the Brahmaputra River from Calcutta by the ‘Rivers Steam Navigation Company’. With sleepers cut locally the first few miles of track were promptly laid. | |||
<br>On 1 May 1882, the first metre-gauge locomotive in Assam passed over that section of line from the Steamer Ghat to the Jaipur Road. | |||
<br>The terminus on the Brahmaputra, known as Mohona Mukh, the Steamer Ghat during the dry season, was some five miles from [[Dibrugarh]]. The site for the crossing of the Dehing River was half-way between Kujugaon and Makum Fort. In 1882 Roberto Paganini established his quarters at Kujugaon to supervise the construction of the line on the north bank towards [[Dibrugarh]], the south bank towards the coalfield, and the bridge, but also the preliminary work at the coalfield itself. By 1882 the Company had purchased a number of steamers and barges and being used to ship material up the Dehing River. | |||
<br>The main trouble, both at Dehing and Brahmatputra ends of the line was the lack of platelayers experienced and competent enough to adjust the rails and lay points and crossings accurately. To overcome this difficulty platelayers were sent out from England. Another essential requirement was the supply of sleepers and daily about 1000 were being produced. | |||
<br>On 15 Aug 1882 the line was opened for goods traffic up to the Dinjan River and to Chabua on 23 December . | |||
'''1883''': The line to Makum Junction, forty miles from the Steamer Ghat at [[Dibrugarh]] was opened for passenger traffic on 16 Jul 1883. On 25 Dec the lines from the Brahmaputra and the Dehing were linked at Borbhil, in the heart of the forest, completing through railway communication. | |||
1884: The official opening of the Ledo Coalfield was 18 Feb 1884, although the Dehing Bridge was still of timber construction and not ready for locomotives, so carriages were hand shunted one-by-one across the bridge to the Margherita side of the river. | |||
<br>The line from Makum Junction along the Sadiya Road to Talap, as far as the Doom Dooma Bridge was opened to traffic on 2 May 1884 and to Talap on 5 Feb 1885 | |||
'''1897''': The Directors of the ‘[[Assam Railways and Trading Company|Assam Railways and Trading Company Limited ]]’ invested in the [[Brahmaputra-Sultanpur Railway| ‘Brahmaputra Sultanpur Railway Co Ltd’ - ''see separate page'']] to construct a metre-gauge line from Sultanpur on the ‘[[Eastern Bengal Railway]]’(EBR) eastward through Bogra to Kaligani on the Brahmaputra River to open up a large market for the Company’s coal and oil products. | |||
1898: The first bridge over the Dehing River, of wooden construction, was severly damaged in August. Reported by the Agent and General Manager [[Sydney S Hawkins]] with six spans (300-feet) being carried away. Temporary wooden trestles were made and the line opened again within a month, in spite of two floods that undid much that had been done. | |||
'''1899:''' A steel bridge which had been under construction since 1896 was opened to traffic. In May. | |||
'''1910''': The ‘[[Saikhoa Branch Railway|‘Saikhoa Extension Railway’]] from Talap to the Brahmaputra at Saikhoa Ghat was built in 1909-10 at the Government’s request. | |||
'''1911''': New workshops were being constructed at Dibrugarh to replace the old workshops by then nearly 30 years old. The main reason for the change, however, was that the old workshops were cramped for space and inconveniently situated at a point where the river was eroding its bank. The workshops, still in use in 1946 included the Erecting Shop, Boiler Shop and Smithy, Foundry, Machine Shop and Carriage and Wagon Shop. | |||
'''1914-18''':The old 250-feet timber bridge at Doom Doom was replaced during WW1 by the present steel bridge, which was formally opened by the AR&TC Chairman Lord Ribblesdale in 1920. | |||
==Records== | ==Records== |
Revision as of 14:32, 3 June 2020
Dibru-Sadiya Railway | ||
---|---|---|
1942 map | ||
Line of route | ||
Dibrugarh to Talap to Saikhoa(1910) | ||
Gauge / mileage | ||
Metre gauge | 78 Miles (1905) | |
Timeline | ||
1881 | Company formed | |
1882 Aug | First section opened to traffic. | |
1883 Jul | Extended to Makum Junction | |
1885 Feb | Line reached Talap | |
1910 May | Saikhoa Extension, from Talap | |
Key locations | ||
Presidency | Bengal | |
Stations | Dibrugarh, Makum, Talap, Tinsukia | |
System agency | ||
Owned and worked by the Assam Railways and Trading Company | ||
1942 | Worked by Bengal and Assam Railway | |
1945 | Nationalisation | |
How to interpret this infobox |
Dibru-Sadiya Railway A metre gauge(MG) railway in the extreme north-east corner of India. Owned by ‘Assam Railways and Trading Company’(AR&TC). Opened in stages from 1882 to a total of 86 miles(140km) by 1910.
Railway Development
The first section of the line opened in 1882 from Brahmaputra River Steamer Ghat near Dibrugarh eastward, 15 miles(24km); extended to Makum Junction in 1883, a further 23½ miles(38km). Reaching Talap in 1885 giving a total 54½ miles(88km) )[1]
Makum Branch Railway, 23 miles(37km), opened in 1884 as a branch from Makum Junction to Dihing Bridge[1]
Ledo and Tikak Margherita Colliery Railway, 5½ miles(9km),opened 1884, linked to the ‘Dibru-Sadiya Railway’ at Dihing Bridge; also owned by the Assam Railways and Trading Company(AR&TC) h owever this railway was classified independently - see separate pageand the working was taken over by the ‘Dibru-Sadiya Railway’ in 1897[1].
In 1903 a connection was created with the opening of the terminus at Tinsukia of the metre gauge(MG) ‘Assam-Bengal Railway Mainline’, thus giving a direct line to Chittagong Port.
Saikhoa Extension Railway , 8½ miles(14km), from Talap was a further extension in 1910 to reach Saikhoa Ghat. Thus giving a total line length of 86 miles(140km) including the ‘Makum Branch’ [1].
In 1942 the working was taken over by the Bengal and Assam Railway for the duration of the war (WW2) and the railway was nationalised in 1945.
Origins and Background
The following based on the auto-biography of Charles Folliott Birney, Chairman ‘[[Assam Railways and Trading Company |Assam Railways and Trading Company Limited [2].
1881: Robert Piercy and three Italian engineers, the Chevalier brothers , arrived in Calcutta and made their way to Dibrugarh . Benjamin Piercy, who as consulting engineer, remained in England and advised that:-
“In fixing the line between the River Dehing and the coal measures will be the simplest and least costly , and to bear in mind the petroleum concession is likely to pass into the hands of our Company. Robert Piercy will make Dibrugarh his headquarters and direct operations at that end. Mr Roberto Paganini will establish quarters for himself and assistants in the forests on the banks of the Dehing and direct operations at Makum or Naga.”
Several weeks were spent in surveying the line from the Steamer Ghat to the town of Dibrugarh. Possession had to be obtained of the required land and a labour force had to be enlisted.
1882: As a result it was not possible to begin construction until January 1882, when a considerable period of the working season had expired. Soon however the first consignment of rails, locomotives, etc shipped from the United Kingdom arrived at Dibrugarh. They had been brought a thousand miles up the Brahmaputra River from Calcutta by the ‘Rivers Steam Navigation Company’. With sleepers cut locally the first few miles of track were promptly laid.
On 1 May 1882, the first metre-gauge locomotive in Assam passed over that section of line from the Steamer Ghat to the Jaipur Road.
The terminus on the Brahmaputra, known as Mohona Mukh, the Steamer Ghat during the dry season, was some five miles from Dibrugarh. The site for the crossing of the Dehing River was half-way between Kujugaon and Makum Fort. In 1882 Roberto Paganini established his quarters at Kujugaon to supervise the construction of the line on the north bank towards Dibrugarh, the south bank towards the coalfield, and the bridge, but also the preliminary work at the coalfield itself. By 1882 the Company had purchased a number of steamers and barges and being used to ship material up the Dehing River.
The main trouble, both at Dehing and Brahmatputra ends of the line was the lack of platelayers experienced and competent enough to adjust the rails and lay points and crossings accurately. To overcome this difficulty platelayers were sent out from England. Another essential requirement was the supply of sleepers and daily about 1000 were being produced.
On 15 Aug 1882 the line was opened for goods traffic up to the Dinjan River and to Chabua on 23 December .
1883: The line to Makum Junction, forty miles from the Steamer Ghat at Dibrugarh was opened for passenger traffic on 16 Jul 1883. On 25 Dec the lines from the Brahmaputra and the Dehing were linked at Borbhil, in the heart of the forest, completing through railway communication.
1884: The official opening of the Ledo Coalfield was 18 Feb 1884, although the Dehing Bridge was still of timber construction and not ready for locomotives, so carriages were hand shunted one-by-one across the bridge to the Margherita side of the river.
The line from Makum Junction along the Sadiya Road to Talap, as far as the Doom Dooma Bridge was opened to traffic on 2 May 1884 and to Talap on 5 Feb 1885
1897: The Directors of the ‘Assam Railways and Trading Company Limited ’ invested in the ‘Brahmaputra Sultanpur Railway Co Ltd’ - see separate page to construct a metre-gauge line from Sultanpur on the ‘Eastern Bengal Railway’(EBR) eastward through Bogra to Kaligani on the Brahmaputra River to open up a large market for the Company’s coal and oil products.
1898: The first bridge over the Dehing River, of wooden construction, was severly damaged in August. Reported by the Agent and General Manager Sydney S Hawkins with six spans (300-feet) being carried away. Temporary wooden trestles were made and the line opened again within a month, in spite of two floods that undid much that had been done.
1899: A steel bridge which had been under construction since 1896 was opened to traffic. In May.
1910: The ‘‘Saikhoa Extension Railway’ from Talap to the Brahmaputra at Saikhoa Ghat was built in 1909-10 at the Government’s request.
1911: New workshops were being constructed at Dibrugarh to replace the old workshops by then nearly 30 years old. The main reason for the change, however, was that the old workshops were cramped for space and inconveniently situated at a point where the river was eroding its bank. The workshops, still in use in 1946 included the Erecting Shop, Boiler Shop and Smithy, Foundry, Machine Shop and Carriage and Wagon Shop.
1914-18:The old 250-feet timber bridge at Doom Doom was replaced during WW1 by the present steel bridge, which was formally opened by the AR&TC Chairman Lord Ribblesdale in 1920.
Records
An on-line search of the India Office Records (IOR) records held at the British Library relating to this railway [3] gives the following:-
- L/F/7/2190; "Collection 370/35 Part 1: Railways: Miscellaneous: Dibru-Sadiya Railway. Questions of purchase, proposed extension and proposed amalgamation with the Assam-Bengal Railway"; 1927-1944
- L/F/7/2191; ditto Part 2; 1944-1948
References
- ↑ 1.0 1.1 1.2 1.3 "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 178; Retrieved 1 Jun 2020
- ↑ ‘The Story of the Assam Railways and Trading Company Limited’ 1881-1951 by Charles Folliott Birney, Chairman. ‘Dibru-Sadiya Railway’ Chapter III, page 15-25 pdf 24-37; Retrieved 31 June 2020
- ↑ “British Library Archives and Manuscripts Catalogue” - Search; Retrieved 5 Apr 2016