Jammu and Kashmir Railway: Difference between revisions

From FIBIwiki
Jump to navigation Jump to search
PEA-2292 (talk | contribs)
Opening paragraph revised with new information and link
PEA-2292 (talk | contribs)
Complete re-write with BL research by Steve Moore
Line 31: Line 31:
}}
}}


The '''Jammu and Kashmir Railway''' was a short broad gauge([[Rail_gauge#Broad_Gauge|BG]]) branch financed by the [[Princely states|Princely ]][[Kashmir|Kashmir State]] Durbar. The 16 mile(26km) line opened in 1890 linking [[Sialkot]] to [[Jammu]] and was worked by [[North Western Railway]](NWR) as part of their ‘Tawi Branch Line’
The '''Jammu and Kashmir Railway''' was a short broad gauge([[Rail_gauge#Broad_Gauge|BG]]) branch comprising two sections totalling 25 mile(40km) line opened in 1890 completing the linking of [[Sialkot]] to [[Jammu]] and was worked by [[North Western Railway]](NWR). The 25 mile(40km) section is, in some records, referred to as the [[Jammu-Sialkot Railway]] and [[Sialkot-Jammu Railway]]  
<ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n121/mode/2up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 113]; Retrieved 22 an 2017</ref>.


The [[North Western Railway - Lines operated and worked|NWR  ‘Tawi Branch  Line’]], was completed in 1890. The 26 miles(42km)  from [[Wazirabad]] to [[Sialkot]], had opened 1884. Extended by NWR in 1890 by 9 miles(14km) to the ‘Frontier of Kashmir State’ where the [[Jammu and Kashmir Railway]] continued the railway a further 16 miles(26km) to the ‘Left Bank of the Tawi River near [[Jammu]]<ref name=Admin/>. The 25 mile(40km)section  is in some records referred to as the [[Jammu-Sialkot Railway]]. The complete line from [[Wazirabad]] to [[Jammu]], a total of 51 miles(82km) was part of the NWR network until partition when the line was severed. The section within Kasmir State becoming the [[Suchetgarh-Jammu Railway]] .
The 26 miles(42km)  from [[Wazirabad]] Junction to [[Sialkot]], had opened 1884. Extended by NWR in 1890 by 9 miles(14km) to the ‘Frontier of Kashmir State’ and became the [[North Western Railway|NWR  ‘Tawi Branch Line (British Section)]] <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n114/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government PrintingCalcutta;  page 106]; Retrieved 7 Mar 2017</ref>..


==Records==
From the Frontier the further 16 miles(26km) to the ‘Left Bank of the Tawi River near [[Jammu]]’,  financed by the [[Princely states|Princely ]][[Kashmir|Kashmir State]] Durbar. And is described as the ‘Jammu and Kashmir Railway (Native State Section)’ <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n121/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing, Calcutta; page 113]; Retrieved 7 Mar 2017</ref>..
An on-line search of the [[India Office Records]] (IOR) records held at the [[British Library]] relating to this railway <ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2 “British Library Archives and Manuscripts Catalogue” - Search]; Retrieved 7 Apr 2016</ref>
 
gives the following:-
The complete line from [[Wazirabad]]  to [[Jammu]], a total of  51 miles(82km) was part of the NWR network until partition when the line was severed. The section within Kasmir State becoming the [[Suchetgarh-Jammu Railway]] .
*R/2/1061/5; "File No.54 of 1888. Railway from Sialkot to Jammu"; 1888
 
==History==
The following has been extracted from the [[British Library]] [[India Office Records]] R/2/1061/S” Railway from Sialkot to Jammu”, 1888 <ref>[[British Library]] IOR/R/2/1061/S” Railway from Sialkot to Jammu”, 1888</ref>
 
<blockquote>Early in 1888 the Discussions were coming to a close on the final agreement regarding the railway that would run from Sialkot in the Punjab to Jammu in Kashmir a distance of 25½ miles. The Darbar of Kashmir was to finance the railway with the British Government supplying interest on the sum paid for the 9 miles in British Territory. The line was across fairly flat open with only some hills near to Jammu. The crossing of the Balal Nulla was the only bridge spanned by a two girder bridges where it crosses the low land the line was to be allowed to flood during the high rains. The bridge was to be made with girders from a bridge over the Chenal, other used materials  that possibly could be used were second hand rails from North-Western Railways but only in the Indian Section.  The Stations were to be at Sialkot, Salia, Suchet Garh, Rungbir Singpur, a crossing, Miran Sahib a flag station, Satwari, then  finaly at the Tawi or in Jammu, the Terminal. The original cost was to be Rs63,000 per mile although a consultant engineer later in the year expected the cost to be nearer Rs65.000 per mile. The agreement was finally signed on 4th July 1888. The North-Western Railway were to be the operators and required the construction to be to the standard that was operated by the Indian State Railways. The railway terminal was to terminate at the Tawi and it would be allowed to be temporary terminal until the railway was completed in to the town at a later date. The initial operation contract was for 5 years. In January 1888 Mr [[F. Wolley-Dod]] had been appointed as Executive Engineer under General [[R De Bourbel]] R. E., the Chief Engineer of the State of Kashmir. To complete the quotation and to start the laying out of the railway. Mr Wolley-Dod reported that by the end April 1888 the line had been set as far Runbhir Singpur where the station had been fixed, and one lakh of bricks had been ordered for the construction of buildings and bridges. </blockquote>


==Further Information==
==Further Information==
Line 49: Line 52:
[[Category:Railways]]
[[Category:Railways]]
[[Category:Indian States Railways]]
[[Category:Indian States Railways]]
[[Category:State Railways]]

Revision as of 15:22, 7 March 2017

Jammu and Kashmir Railway
[[Image:|150px| ]]
Line of route
Sialkot to Jammu
Gauge / mileage
Broad gauge 16 miles (1905)
Timeline
Key locations
Presidency Bengal
Stations
System agency
Worked by North Western Railway
How to interpret this infobox

The Jammu and Kashmir Railway was a short broad gauge(BG) branch comprising two sections totalling 25 mile(40km) line opened in 1890 completing the linking of Sialkot to Jammu and was worked by North Western Railway(NWR). The 25 mile(40km) section is, in some records, referred to as the Jammu-Sialkot Railway and Sialkot-Jammu Railway

The 26 miles(42km) from Wazirabad Junction to Sialkot, had opened 1884. Extended by NWR in 1890 by 9 miles(14km) to the ‘Frontier of Kashmir State’ and became the NWR ‘Tawi Branch Line (British Section)’ [1]..

From the Frontier the further 16 miles(26km) to the ‘Left Bank of the Tawi River near Jammu’, financed by the Princely Kashmir State Durbar. And is described as the ‘Jammu and Kashmir Railway (Native State Section)’ [2]..

The complete line from Wazirabad to Jammu, a total of 51 miles(82km) was part of the NWR network until partition when the line was severed. The section within Kasmir State becoming the Suchetgarh-Jammu Railway .

History

The following has been extracted from the British Library India Office Records R/2/1061/S” Railway from Sialkot to Jammu”, 1888 [3]

Early in 1888 the Discussions were coming to a close on the final agreement regarding the railway that would run from Sialkot in the Punjab to Jammu in Kashmir a distance of 25½ miles. The Darbar of Kashmir was to finance the railway with the British Government supplying interest on the sum paid for the 9 miles in British Territory. The line was across fairly flat open with only some hills near to Jammu. The crossing of the Balal Nulla was the only bridge spanned by a two girder bridges where it crosses the low land the line was to be allowed to flood during the high rains. The bridge was to be made with girders from a bridge over the Chenal, other used materials that possibly could be used were second hand rails from North-Western Railways but only in the Indian Section. The Stations were to be at Sialkot, Salia, Suchet Garh, Rungbir Singpur, a crossing, Miran Sahib a flag station, Satwari, then finaly at the Tawi or in Jammu, the Terminal. The original cost was to be Rs63,000 per mile although a consultant engineer later in the year expected the cost to be nearer Rs65.000 per mile. The agreement was finally signed on 4th July 1888. The North-Western Railway were to be the operators and required the construction to be to the standard that was operated by the Indian State Railways. The railway terminal was to terminate at the Tawi and it would be allowed to be temporary terminal until the railway was completed in to the town at a later date. The initial operation contract was for 5 years. In January 1888 Mr F. Wolley-Dod had been appointed as Executive Engineer under General R De Bourbel R. E., the Chief Engineer of the State of Kashmir. To complete the quotation and to start the laying out of the railway. Mr Wolley-Dod reported that by the end April 1888 the line had been set as far Runbhir Singpur where the station had been fixed, and one lakh of bricks had been ordered for the construction of buildings and bridges.

Further Information

See North Western Railway

References