Kolar Gold Fields Railway: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Data added, links checked, Work-in-progress removed |
||
Line 1: | Line 1: | ||
The '''Kolar Gold Fields Railway''' opened in 1894. The line was a branch joining the [[Kolar Gold Fields]] to [[Bowringpet]], where it connected with the [[Madras]]-[[Bangalore]] main line. | |||
The line was worked by [[Madras Railway]](MR); which became the [[Madras and Southern Mahratta Railway]](M&SMR) in 1908. | |||
[[Category:Railways]] | [[Category:Railways]] | ||
[[Category:Indian States Railways]] | [[Category:Indian States Railways]] |
Revision as of 06:10, 24 November 2015
The Kolar Gold Fields Railway opened in 1894. The line was a branch joining the Kolar Gold Fields to Bowringpet, where it connected with the Madras-Bangalore main line.
The line was worked by Madras Railway(MR); which became the Madras and Southern Mahratta Railway(M&SMR) in 1908.