Difference between revisions of "Junagadh State Railway"

From FIBIwiki
Jump to navigation Jump to search
('Kathiawar Peninsula Railway and Tramway Systems' page link added under 'Further Information')
(Total revision with maps etc)
Line 22: Line 22:
 
|timeline5details=   
 
|timeline5details=   
 
|presidency= [[Bombay]]
 
|presidency= [[Bombay]]
|stations= [[Jetalsar]], [[Juniagarh]], [[Kutiyana]], [[Veraval]]
+
|stations= [[Jetalsar]], [[Junagadh]], [[Kutiyana]], [[Veraval]]
 
|system1date= 1888
 
|system1date= 1888
 
|system1details= [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
 
|system1details= [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
Line 31: Line 31:
 
}}
 
}}
  
The '''Junagadh State Railway''' (JunSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned by the [[Princely states|Princely ]][[Junagadh State]] and intially worked by the [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
+
The '''Junagadh State Railway''' (JunSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned by the [[Princely states|Princely ]][[Junagadh State]] and initially worked by the [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved 7 Feb 2016</ref>
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved 7 Feb 2016</ref>
 
  
From 1911 the JunSR worked itself as an independent system, owned by the Junagadh Durbar, until 1948 when it became part of the [[Saurashtra Railway]].
+
In 1869 a survey was undertaken and the [[Kathiawar_Peninsula_Railway_and_Tramway_Systems#Timeline_1863-1900 |’Junagadh-Veraval Railway Proposal ‘]]  concluded  that a Railway line from [[Junagadh]] to [[Veraval]]  was feasible  but the cost of 40 to 50 Lakhs of Rupees was too high for the Junagadh Durbar to go ahead. Proposals for a light railway system were to be looked at.  <ref> British Library ‘India Office Records’ V/10/1384 “Indian States Administration Reports. Kathiawar” 1865-75, No 134 of 1869 </ref>.
  
==Records==
+
In 1872 another line was proposed and the [[Kathiawar_Peninsula_Railway_and_Tramway_Systems#Timeline_1863-1900|route from  Veraval  to Junagadh and Dhoraji]] was surveyed by Mr A W Forde C E, but the cost was beyond the means of Junagadh Durbar. This proposal came to nothing  <ref name=Bombay8_247>[https://archive.org/stream/1884GazetteerByBombayPresidencyVol8Kathiawar349D/1884-gazetteerByBombayPresidency-vol8-kathiawar349-d_djvu.txtArchive.org “Gazetteer – Bombay Presidency” Vol.8; page 247-248 of 756]; Retrieved 1 Oct 2017</ref>.
An on-line search of the [[India Office Records]] (IOR) records held at the [[British Library]] relating to this railway <ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2  “British Library Archives and Manuscripts Catalogue” - Search]; Retrieved 7 Apr 2016</ref>
+
Construction finally commenced in 1886 from [[Jetalsar]] to [[Junagadh|Junagadh City]] in 1888 and onward To [[Veraval]] 1889,
gives the following:-
+
<br>Initially described as the '''Junadagh-Veraval Railway'''.
*R/1/1/4784(1) and (2); "File 110-IB(C)/1935 Proposed taking over of management of the Jetalsar-Rajkot Railway by the Junagadh State Railway from the Gondal Railway"; 1935
 
  
''This record requires examination to determine if the Junagadh State Railway were sucessful in the takeover of the management of [[Jetalsar-Rajkot Railway]]''  
+
[[File:Junagadh State Railway 1931 Map.png|thumb|Junagadh State Railway 1931 Map]]
 +
[[File:Junagadh State Railway 1938 Schematic Map.png|thumb|Junagadh State Railway 1938 Scematic Map]]
 +
==Administation==
 +
*1888-89: With the opening of the ‘Junagadh State Railway’(JunSR ) from  [[Junagadh]]  via [[Jetalsar]]  to [[Veraval]] the railway joined the administrative coalition of the '[[Bhavnagar-Gondal State Railway]]’.  <br>The coalition briefly became the '[[Bhavnagar-Gondal-Junagad-Veraval Railway]]'(BGJPV)
 +
*1889: When the ‘[[Porbandar State Railway]]’ extension from [[Dhasa ]] reached [[Porbandar]]  the coalition finally became the [[Bhavnagar-Gondal-Junagad-Porbandar Railway| '''Bhavnagar-Gondal-Junagad-Porbandar Railway'''(BGJPR) ''- see separate page for further information'']].
 +
*This BGJPR coalition was also described in some records as the '''Kathiawar Railway''',
 +
*also as the '''Kathiawar Union Railway'''
 +
*also as the '''Kathiawar State Railway'''.
 +
* 1911: The BGJPR coalition ceased to exist on 1 April 1911, from this date the line was worked independently as a separate and distinct railway <ref name=Admin/>.
 +
* 1911-1934: The operation of the ‘[[Jetalsar-Rajkot Railway]]’ caused serious financial and commercial disadvantages to the JunSr, resulting in acrimonious exchanges over many years [[Jetalsar-Rajkot Railway|''- see separate page for further information'']].
 +
* 1935: The ‘Junagadh State Railway’ put forward a proposal to take over the management of the ‘[[Jetalsar-Rajkot Railway]]’ which since 1911 had been  operated by the ‘[Gondal-Porabandar Railway]’ <ref> British Library IOR/R/1/1/4784(1) and (2); "File 110-IB(C)/1935 Proposed taking over of management of the Jetalsar-Rajkot Railway by the Junagadh State Railway from the Gondal Railway"; 1935</ref>. There is no evidence that this proposal was accepted.
 +
* 1948: The  ‘Junagadh State Railway’ became part of the ‘[[Saurashtra Railway]]’.
 +
 
 +
==Development of the Junagadh State Railway==
 +
*The first section from [[Jetalsar]] to [[Junagadh]] opened in 1888 and extended to [[Veraval|Veraval Docks]] in 1889, a total of 67 miles(108km)  <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved  23 Jun 2019</ref>.  At [[Jetalsar |Jetalasar Junction]] there was a connection  to the ‘[[Gondal Railway]] - Mainline’ [[Dhasa]] to [[Jamjodhpur]].
 +
* Initially described as the '''Junadagh-Veraval Railway''' 
 +
**''Line ‘A’ on 1931 and 1938 maps '' 
 +
*1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km)  south-west of Junagadh,  to Saradiya <ref name=Admin/> (shown as Juniagarh  to  Kutiyana on 1931 Railways Map )
 +
**''Line ‘B’ on 1931 and 1938 maps '' 
 +
* 1912: ‘Visavadar Branch’, 26 miles(km); from Junagadh to Visavadar <ref name=Admin/> .
 +
**''Line ‘C’ on 1931 and 1938 maps ''   
 +
*1912: ‘Dungarpur Quarry Line’, ¾ mile(1.2km); a short spur from the ‘Visavadar Branch’, 2 miles (3.2km) south-east of Junagarh <ref name=Admin/> .
 +
**''Line ‘D’ on 1938 map '' 
 +
* 1918-23: ‘Veraval-Prachi Road Branch’, 28 miles(45km); from [[Veraval]], proposed as far as [[Una]], delayed start, opened in stages from 1918, reached Prachi Road 1923 <ref name=page193>[https://ia801602.us.archive.org/6/items/in.ernet.dli.2015.96301/2015.96301.Kathiawar-Economics.pdf 1943 ‘Kathiawar Economics’ by A  B Trivedi, 1943 Digital Library of India Archive.org,  Appendix B ‘Railways in Kathiawar with opening dates, pages 193(pdf217)]</ref>. 
 +
**''Line ‘E’ on 1931 and 1938 maps '' 
 +
* 1932: ‘Visavader-Dhari Branch’ 20 miles(32km); from Visavader to Dhari <ref name=page193/>.
 +
**''Line ‘F’ on 1938 map ''
 +
* 1934-35: ‘Prachi Road-Jamwala-Delwada Branch’ 31 miles(50km) <ref name=page193/>. 
 +
**''Line ‘G’ on 1938 map ''
 +
*1938: ‘[[Prachi Road-Kodinar Railway]]’, 16 miles(26km) from Prachi Road to Kodinar. [[Prachi Road-Kodinar Railway ''- See separate page for further information'']]. '
 +
**'Line ‘H’ on 1938 map ''
  
 
==Further Information==
 
==Further Information==
'''[[Kathiawar Peninsula Railway and Tramway Systems]]''' gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.
+
See  '''[[Bhavnagar-Gondal-Junagad-Porbandar Railway]]''' for period from 1899 to 1911.
 +
<br>and '''[[Kathiawar Peninsula Railway and Tramway Systems]]''' gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.
  
 
== References ==
 
== References ==

Revision as of 10:24, 14 May 2020

Junagadh State Railway
[[Image:|150px| ]]
Line of route
Jetalsar to Veraval
Gauge / mileage
Metre gauge 140 miles (1922)
229 miles (1944)
Timeline
1888 First section opened to traffic
Key locations
Presidency Bombay
Stations Jetalsar, Junagadh, Kutiyana, Veraval
System agency
1888 Bhavnagar-Gondal-Junagad-Porbandar Railway
1911 Own agency
How to interpret this infobox

The Junagadh State Railway (JunSR) was a metre gauge(MG) railway owned by the Princely Junagadh State and initially worked by the ‘Bhavnagar-Gondal-Junagad-Porbandar Railway[1]

In 1869 a survey was undertaken and the ’Junagadh-Veraval Railway Proposal ‘ concluded that a Railway line from Junagadh to Veraval was feasible but the cost of 40 to 50 Lakhs of Rupees was too high for the Junagadh Durbar to go ahead. Proposals for a light railway system were to be looked at. [2].

In 1872 another line was proposed and the route from Veraval to Junagadh and Dhoraji was surveyed by Mr A W Forde C E, but the cost was beyond the means of Junagadh Durbar. This proposal came to nothing [3]. Construction finally commenced in 1886 from Jetalsar to Junagadh City in 1888 and onward To Veraval 1889,
Initially described as the Junadagh-Veraval Railway.

Junagadh State Railway 1931 Map
Junagadh State Railway 1938 Scematic Map

Administation

Development of the Junagadh State Railway

  • The first section from Jetalsar to Junagadh opened in 1888 and extended to Veraval Docks in 1889, a total of 67 miles(108km) [4]. At Jetalasar Junction there was a connection to the ‘Gondal Railway - Mainline’ Dhasa to Jamjodhpur.
  • Initially described as the Junadagh-Veraval Railway
    • Line ‘A’ on 1931 and 1938 maps
  • 1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km) south-west of Junagadh, to Saradiya [4] (shown as Juniagarh to Kutiyana on 1931 Railways Map )
    • Line ‘B’ on 1931 and 1938 maps
  • 1912: ‘Visavadar Branch’, 26 miles(km); from Junagadh to Visavadar [4] .
    • Line ‘C’ on 1931 and 1938 maps
  • 1912: ‘Dungarpur Quarry Line’, ¾ mile(1.2km); a short spur from the ‘Visavadar Branch’, 2 miles (3.2km) south-east of Junagarh [4] .
    • Line ‘D’ on 1938 map
  • 1918-23: ‘Veraval-Prachi Road Branch’, 28 miles(45km); from Veraval, proposed as far as Una, delayed start, opened in stages from 1918, reached Prachi Road 1923 [6].
    • Line ‘E’ on 1931 and 1938 maps
  • 1932: ‘Visavader-Dhari Branch’ 20 miles(32km); from Visavader to Dhari [6].
    • Line ‘F’ on 1938 map
  • 1934-35: ‘Prachi Road-Jamwala-Delwada Branch’ 31 miles(50km) [6].
    • Line ‘G’ on 1938 map
  • 1938: ‘Prachi Road-Kodinar Railway’, 16 miles(26km) from Prachi Road to Kodinar. Prachi Road-Kodinar Railway ''- See separate page for further information''. '
    • 'Line ‘H’ on 1938 map

Further Information

See Bhavnagar-Gondal-Junagad-Porbandar Railway for period from 1899 to 1911.
and Kathiawar Peninsula Railway and Tramway Systems gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.

References

  1. "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 193; Retrieved 7 Feb 2016
  2. British Library ‘India Office Records’ V/10/1384 “Indian States Administration Reports. Kathiawar” 1865-75, No 134 of 1869
  3. “Gazetteer – Bombay Presidency” Vol.8; page 247-248 of 756; Retrieved 1 Oct 2017
  4. 4.0 4.1 4.2 4.3 4.4 "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government Printing, Calcutta; page 193; Retrieved 23 Jun 2019
  5. British Library IOR/R/1/1/4784(1) and (2); "File 110-IB(C)/1935 Proposed taking over of management of the Jetalsar-Rajkot Railway by the Junagadh State Railway from the Gondal Railway"; 1935
  6. 6.0 6.1 6.2 1943 ‘Kathiawar Economics’ by A B Trivedi, 1943 Digital Library of India Archive.org, Appendix B ‘Railways in Kathiawar with opening dates, pages 193(pdf217)