Difference between revisions of "Junagadh State Railway"

From FIBIwiki
Jump to navigation Jump to search
('Kathiawar Peninsula Railway and Tramway Systems' page link added under 'Further Information')
(1937 Report info added, layout changes , Statisics added and Classification)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{Line Railways Infobox
 
{{Line Railways Infobox
|image=
+
|image= Junagadh State Railway Logo.png
|caption=  
+
|caption= Junagadh State Railway Logo. 
 
|route= [[Jetalsar]] to [[Veraval]]
 
|route= [[Jetalsar]] to [[Veraval]]
 
|gauge1=  
 
|gauge1=  
Line 22: Line 22:
 
|timeline5details=   
 
|timeline5details=   
 
|presidency= [[Bombay]]
 
|presidency= [[Bombay]]
|stations= [[Jetalsar]], [[Juniagarh]], [[Kutiyana]], [[Veraval]]
+
|stations= [[Jetalsar]], [[Junagadh]], [[Kutiyana]], [[Veraval]]
 
|system1date= 1888
 
|system1date= 1888
 
|system1details= [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
 
|system1details= [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
Line 31: Line 31:
 
}}
 
}}
  
The '''Junagadh State Railway''' (JunSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned by the [[Princely states|Princely ]][[Junagadh State]] and intially worked by the [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]
+
Also known as '''Junagad State Railway'''  
<ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved 7 Feb 2016</ref>
 
  
From 1911 the JunSR worked itself as an independent system, owned by the Junagadh Durbar, until 1948 when it became part of the [[Saurashtra Railway]].
+
The '''Junagadh State Railway''' (JunSR) was a metre gauge([[Rail_gauge_#Metre_Gauge|MG]]) railway owned by the [[Princely states|Princely ]][[Junagadh State]] and initially worked by the [[Bhavnagar-Gondal-Junagad-Porbandar Railway]]’ <ref>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved 7 Feb 2016</ref>
  
==Records==
+
In 1869 a survey was undertaken and the [[Kathiawar_Peninsula_Railway_and_Tramway_Systems#Timeline_1863-1900 |’Junagadh-Veraval Railway Proposal ‘]]  concluded  that a Railway line from [[Junagadh]] to [[Veraval]] was feasible  but the cost of 40 to 50 Lakhs of Rupees was too high for the Junagadh Durbar to go ahead. Proposals for a light railway system were to be looked at.  <ref> British Library ‘India Office Records’ V/10/1384 “Indian States Administration Reports. Kathiawar” 1865-75, No 134 of 1869 </ref>.
An on-line search of the [[India Office Records]] (IOR) records held at the [[British Library]] relating to this railway <ref>[http://searcharchives.bl.uk/primo_library/libweb/action/search.do?vid=IAMS_VU2  “British Library Archives and Manuscripts Catalogue” - Search];  Retrieved 7 Apr 2016</ref>
 
gives the following:-
 
*R/1/1/4784(1) and (2); "File 110-IB(C)/1935 Proposed taking over of management of the Jetalsar-Rajkot Railway by the Junagadh State Railway from the Gondal Railway"; 1935
 
  
''This record requires examination to determine if the Junagadh State Railway were sucessful in the takeover of the management of [[Jetalsar-Rajkot Railway]]''  
+
In 1872 another line was proposed and the  [[Kathiawar_Peninsula_Railway_and_Tramway_Systems#Timeline_1863-1900|route from  Veraval  to Junagadh and Dhoraji]]  was surveyed by Mr A W Forde C E, but the cost was beyond the means of Junagadh Durbar. This proposal came to nothing  <ref name=Bombay8_247>[https://archive.org/stream/1884GazetteerByBombayPresidencyVol8Kathiawar349D/1884-gazetteerByBombayPresidency-vol8-kathiawar349-d_djvu.txtArchive.org “Gazetteer – Bombay Presidency” Vol.8; page 247-248 of 756]; Retrieved 1 Oct 2017</ref>.
 +
Construction finally commenced in 1886 from [[Jetalsar]] to [[Junagadh|Junagadh City]] in 1888 and onward To [[Veraval]] 1889,
 +
<br>Initially described as the '''Junadagh-Veraval Railway'''.
 +
 
 +
==Administration==
 +
*1888-89: With the opening of the ‘Junagadh State Railway’(JunSR ) from  [[Junagadh]]  via [[Jetalsar]]  to [[Veraval]] the railway joined the administrative coalition of the '[[Bhavnagar-Gondal State Railway]]’.  <br>The coalition briefly became the '[[Bhavnagar-Gondal-Junagad-Veraval Railway]]'(BGJPV)
 +
*1889: When the ‘[[Porbandar State Railway]]’ extension from [[Dhasa ]] reached [[Porbandar]]  the coalition finally became the [[Bhavnagar-Gondal-Junagad-Porbandar Railway| '''Bhavnagar-Gondal-Junagad-Porbandar Railway'''(BGJPR) ''- see separate page for further information'']].
 +
*This BGJPR coalition was also described in some records as the '''Kathiawar Railway''',
 +
*also as the '''Kathiawar Union Railway'''
 +
*also as the '''Kathiawar State Railway'''.
 +
* 1911: The BGJPR coalition ceased to exist on 1 April 1911, from this date the line was worked independently as a separate and distinct railway <ref name=Admin/>.
 +
* 1911-1934: The operation of the ‘[[Jetalsar-Rajkot Railway]]’ caused serious financial and commercial disadvantages to the JunSr, resulting in acrimonious exchanges over many years [[Jetalsar-Rajkot Railway|''- see separate page for further information'']].
 +
* 1935: The ‘Junagadh State Railway’ put forward a proposal to take over the management of the ‘[[Jetalsar-Rajkot Railway]]’ which since 1911 had been  operated by the ‘[[Gondal-Porbandar Railway]]’ <ref> British Library IOR/R/1/1/4784(1) and (2); "File 110-IB(C)/1935 Proposed taking over of management of the Jetalsar-Rajkot Railway by the Junagadh State Railway from the Gondal Railway"; 1935</ref>. There is no evidence that this proposal was accepted.
 +
* 1948: The  ‘Junagadh State Railway’ became part of the ‘[[Saurashtra Railway]]’.
 +
 
 +
==Development of the Junagadh State Railway==
 +
[[File:Junagadh State Railway 1931 Map.png|thumb|Junagadh State Railway 1931 Map]]
 +
[[File:Junagadh State Railway 1938 Schematic Map.png|thumb|Junagadh State Railway 1938 Scematic Map]]
 +
*The first section from [[Jetalsar]] to [[Junagadh]] opened in 1888 and extended to [[Veraval|Veraval Docks]] in 1889, a total of 67 miles(108km)  <ref name=Admin>[https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n201/mode/1up "Administration Report on the Railways in India – corrected up to 31st March 1918"; Superintendent of Government  Printing,  Calcutta;  page 193]; Retrieved  23 Jun 2019</ref>.  At [[Jetalsar |Jetalasar Junction]] there was a connection  to the ‘[[Gondal Railway]] - Mainline’ [[Dhasa]] to [[Jamjodhpur]].
 +
* Initially described as the '''Junadagh-Veraval Railway'''  and became the ‘Main Line’
 +
**''Line ‘A’ on 1931 and 1938 maps ''
 +
*1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km)  south-west of Junagadh,  to Saradiya <ref name=Admin/> (shown as Juniagarh  to  Kutiyana on 1931 Railways Map )
 +
**''Line ‘B’ on 1931 and 1938 maps '' 
 +
* 1912: ‘Visavadar Branch’, 26 miles(km); from Junagadh to Visavadar <ref name=Admin/> .
 +
**''Line ‘C’ on 1931 and 1938 maps ''   
 +
*1912: ‘Dungarpur Quarry Line’, ¾ mile(1.2km); a short spur from the ‘Visavadar Branch’, 2 miles (3.2km) south-east of Junagarh <ref name=Admin/> .
 +
**''Line ‘D’ on 1938 map '' 
 +
* 1918-23: ‘Veraval-Prachi Road Branch’, 28 miles(45km); from [[Veraval]], proposed as far as [[Una]], delayed start, opened in stages from 1918, reached Prachi Road 1923 <ref name=page193>[https://ia801602.us.archive.org/6/items/in.ernet.dli.2015.96301/2015.96301.Kathiawar-Economics.pdf 1943 ‘Kathiawar Economics’ by A  B Trivedi, 1943 Digital Library of India Archive.org,  Appendix B ‘Railways in Kathiawar with opening dates, pages 193(pdf217)]</ref>. 
 +
**''Line ‘E’ on 1931 and 1938 maps '' 
 +
* 1932: ‘Visavader-Dhari Branch’ 20 miles(32km); from Visavader to Dhari <ref name=page193/>
 +
**''Line ‘F’ on 1938 map ''
 +
* 1934-35: ‘Prachi Road-Jamwala-Delvada Branch’ 31 miles(50km) <ref name=page193/>.  This was an extension to the ‘Veraval-Prachi Road Branch’ (Line ‘E’ above) and on reaching Delvada in 1935  became renamed ‘Una Branch’, with a total length from Veraval to Delvada of 25 miles(95km) <ref name=Hist>[https://ia801605.us.archive.org/30/items/in.ernet.dli.2015.36650/2015.36650.India-Railway-Board-History-Of-Indian-Railways-Constructed-And-In-Progress.pdf US Archive .org pdf download of ‘History Of Indian Railways, constructed and in progress’, 31 March 1937 by ‘The Government of India - Railway Department’ page 245      pdf 288]; Retrieved  23 Aug 2020</ref>.
 +
**''Line ‘G’ on 1938 map ''
 +
*1936-37: ‘[[Talala-Visavadar Railway]]’'  via Sasan Gir,  29½ miles(47km) MG, constructed by the JunSR.[[Talala-Visavadar Railway|''See separate page'']]
 +
 
 +
The ‘Statistics of Working’ show the year-by-year financial results from 1913-14 through to 1936-37 with a total route length of 229 miles(369km)
 +
<ref name=Hist>
 +
 
 +
== Classification ==
 +
[[Indian Railway Classification]] of 1926 - Class III railway system.
  
 
==Further Information==
 
==Further Information==
'''[[Kathiawar Peninsula Railway and Tramway Systems]]''' gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.
+
See  '''[[Bhavnagar-Gondal-Junagad-Porbandar Railway]]''' for period from 1899 to 1911.
 +
<br>and '''[[Kathiawar Peninsula Railway and Tramway Systems]]''' gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.
  
 
== References ==
 
== References ==

Latest revision as of 06:50, 24 August 2020

Junagadh State Railway
Junagadh State Railway Logo.png
Junagadh State Railway Logo.
Line of route
Jetalsar to Veraval
Gauge / mileage
Metre gauge 140 miles (1922)
229 miles (1944)
Timeline
1888 First section opened to traffic
Key locations
Presidency Bombay
Stations Jetalsar, Junagadh, Kutiyana, Veraval
System agency
1888 Bhavnagar-Gondal-Junagad-Porbandar Railway
1911 Own agency
How to interpret this infobox

Also known as Junagad State Railway

The Junagadh State Railway (JunSR) was a metre gauge(MG) railway owned by the Princely Junagadh State and initially worked by the ‘Bhavnagar-Gondal-Junagad-Porbandar Railway[1]

In 1869 a survey was undertaken and the ’Junagadh-Veraval Railway Proposal ‘ concluded that a Railway line from Junagadh to Veraval was feasible but the cost of 40 to 50 Lakhs of Rupees was too high for the Junagadh Durbar to go ahead. Proposals for a light railway system were to be looked at. [2].

In 1872 another line was proposed and the route from Veraval to Junagadh and Dhoraji was surveyed by Mr A W Forde C E, but the cost was beyond the means of Junagadh Durbar. This proposal came to nothing [3]. Construction finally commenced in 1886 from Jetalsar to Junagadh City in 1888 and onward To Veraval 1889,
Initially described as the Junadagh-Veraval Railway.

Administration

Development of the Junagadh State Railway

Junagadh State Railway 1931 Map
Junagadh State Railway 1938 Scematic Map
  • The first section from Jetalsar to Junagadh opened in 1888 and extended to Veraval Docks in 1889, a total of 67 miles(108km) [4]. At Jetalasar Junction there was a connection to the ‘Gondal Railway - Mainline’ Dhasa to Jamjodhpur.
  • Initially described as the Junadagh-Veraval Railway and became the ‘Main Line’
    • Line ‘A’ on 1931 and 1938 maps
  • 1910-15: ‘Saradiya Branch Line’, 26 miles(42km); from Shapur , 5 miles(8km) south-west of Junagadh, to Saradiya [4] (shown as Juniagarh to Kutiyana on 1931 Railways Map )
    • Line ‘B’ on 1931 and 1938 maps
  • 1912: ‘Visavadar Branch’, 26 miles(km); from Junagadh to Visavadar [4] .
    • Line ‘C’ on 1931 and 1938 maps
  • 1912: ‘Dungarpur Quarry Line’, ¾ mile(1.2km); a short spur from the ‘Visavadar Branch’, 2 miles (3.2km) south-east of Junagarh [4] .
    • Line ‘D’ on 1938 map
  • 1918-23: ‘Veraval-Prachi Road Branch’, 28 miles(45km); from Veraval, proposed as far as Una, delayed start, opened in stages from 1918, reached Prachi Road 1923 [6].
    • Line ‘E’ on 1931 and 1938 maps
  • 1932: ‘Visavader-Dhari Branch’ 20 miles(32km); from Visavader to Dhari [6]
    • Line ‘F’ on 1938 map
  • 1934-35: ‘Prachi Road-Jamwala-Delvada Branch’ 31 miles(50km) [6]. This was an extension to the ‘Veraval-Prachi Road Branch’ (Line ‘E’ above) and on reaching Delvada in 1935 became renamed ‘Una Branch’, with a total length from Veraval to Delvada of 25 miles(95km) [7].
    • Line ‘G’ on 1938 map
  • 1936-37: ‘Talala-Visavadar Railway’' via Sasan Gir, 29½ miles(47km) MG, constructed by the JunSR.See separate page

The ‘Statistics of Working’ show the year-by-year financial results from 1913-14 through to 1936-37 with a total route length of 229 miles(369km) <ref name=Hist>

Classification

Indian Railway Classification of 1926 - Class III railway system.

Further Information

See Bhavnagar-Gondal-Junagad-Porbandar Railway for period from 1899 to 1911.
and Kathiawar Peninsula Railway and Tramway Systems gives a map, timeline and relates this railway to others in the Kathiawar Peninsula.

References